Have a personal or library account? Click to login
Beam diagnostic analysis of the accelerator systems commissioning line in the Early Neutron Source Project Cover

Beam diagnostic analysis of the accelerator systems commissioning line in the Early Neutron Source Project

Open Access
|Oct 2025

References

  1. Ibarra, A., Heidinger, R., Barabaschi, P., Mota, F., Mosnier, A., Cara, P., & Nitti, F. S. (2014). A stepped approach from IFMIF/EVEDA toward IFMIF. Fusion Sci. Technol., 66(1), 252–259. DOI: 10.13182/FST13-778.
  2. Ibarra, A., & Román, R. (2014). DONES conceptual design report. [2018 available on request to the corresponding author].
  3. Podadera, I., Ibarra, A., Jimenez-Rey, D., Molla, J., Oliver, C., Regidor, D., Varela, R., de la Morena, C., Arbeiter, F., Hauer, V., Bazin, N., Dumas, J., Segul, L., Bellan, L., Fagotti, E., Palmieri, A., Pisent, A., Chauvin, N., Chel, S., Plouin, J., Duglue, G., Dzitko, H., Grabowski, W. C., Wysocka-Rabin, A., Jaksic, M., Tadic, T., Królas, W., López, R., Munoz, A., Prieto, C., Nomen, O., Sanmarti, M., Saura Esteban, F. J., Singh, B. K., & Sanchez-Herranz, D. (2021). The accelerator system of IFMIF-DONES multi-MW facility. In Proceedings 12th International Particle Accelerator Conference, 24–28 May 2021, Campinas, Brazil (pp. 1910–1913). Geneva: JACoW Publishing. DOI: 10.18429/JACoW-IPAC2021-TUPAB211.
  4. Grabowski, W., Staszczak, S., & Wysocka-Rabin, A. (2020). Polish input to beam dynamic research for a superconductive linear accelerator in the Early Neutron Source project. Acta Phys. Pol. B-Proc. Suppl., 13(4), 801–806. DOI: 10.5506/APhysPolB-Supp.13.801.
  5. Uriot, D., & Pichoff, N. (June 2014). TraceWin. CEA Saclay. (Vol. 596).
  6. Podadera, I. (2017). ENS-6.1.3.0-T4-02-N1: Beam Diagnostics and Diagnostics Plate integration. EUROfusion (2MS3PP). [Internal report, available on request to EUROfusion Programme Management Unit (https://euro-fusion.org/contact/)].
  7. Grabowski, W., Maćkowski, M., Staszczak, M., & Wysocka-Rabin, A. (2020). ENS-6.1.1.0.-T22-01-N1: IPPLM/NCBJ contribution to Beam Dynamics analysis for final accelerator layout. EUROfusion (2N77PF). [Internal report, available on request to EUROfusion Programme Management Unit (https://euro-fusion.org/contact/)].
  8. Grabowski, W., & Wysocka-Rabin, A. (2022). ENS-6.1.1.0-T28-01-N1: NCBJ contribution to Beam Dynamics studies for the assessment of DONES accelerator beam commissioning scenarios. EUROfusion (2MU2DS). [Internal report, available on request to EUROfusion Programme Management Unit (https://euro-fusion.org/contact/)].
DOI: https://doi.org/10.2478/nuka-2025-0011 | Journal eISSN: 1508-5791 | Journal ISSN: 0029-5922
Language: English
Page range: 111 - 116
Submitted on: Mar 10, 2025
Accepted on: Jun 26, 2025
Published on: Oct 21, 2025
Published by: Institute of Nuclear Chemistry and Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2025 Wojciech Grabowski, Anna Wysocka-Rabin, published by Institute of Nuclear Chemistry and Technology
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.