Skip to main content
Have a personal or library account? Click to login
Clonal Dissemination of KPC-2, VIM-1, OXA-48-Producing Klebsiella pneumoniae ST147 in Katowice, Poland Cover

Clonal Dissemination of KPC-2, VIM-1, OXA-48-Producing Klebsiella pneumoniae ST147 in Katowice, Poland

Open Access
|Mar 2021
Read online

Figures & tables

Table I

Demographic data and characteristics of the fourteen patients with K. pneumoniae co-producing KPC-2, OXA-48, VIM-1 and CTX-M-15 during the outbreak.

Patient ID/Isolate no.Age (years)/sexHospital ward(s)Date of isolationType of specimenStatus (type) of colonization/infectionDuration of hospitalization (days)Underlying conditionsAntimicrobial used prior to isolation of carbapenemase producer(s)Antimicrobial used as treatment for infectionsOutcome Alive/Dead
374/MOAIT08/03/2018Rectal swabColonization03/01-14/04/2018 (102 days)Abdominal Aortic Aneurysm (AAA)Ciprofloxacin + Gentamycin + ItraconazoleMetronidazoleDead
696560/FOAIT28/02/2018Rectal swabColonization08/02-01/04/2018 (53 days)Tuberculosis, Chronic Obstructive Pulmonary Disease (COPD)Colistin + Voriconazole–Dead
6976/1
6976/2
45/MOAIT01/03/2018
12/03/2018
Rectal swab
Blood
Colonization
Bacteremia
21/02-29/03/2018 (37 days)Guillain-Barré Syndrome (GBS)Colistin + LinezolidAmpicillin/sulbactam + AmikacinAlive
167/FOAIT07/03/2018Rectal swabColonization02/03-29/06/2018 (112 days)COPD, diabetes, hypertensionCeftriaxone + Levofloxacin–Dead
6968 (index case)63/MNR28/02/2018Rectal swabColonization16/02-31/03/2018 (44 days)Hypertension, atherosclerosisCeftriaxone + Metronidazole–Alive
269/MNR07/03/2018Rectal swabColonization23/02-28/03/2018 (34 days)Post-stroke conditions––Alive
443/MNR08/03/2018Rectal swabColonization26/02-12/03/2018 (15 days)HypertensionCeftriaxone + Metronidazole–Dead
154/2542861/MNR30/07/2018Rectal swabColonization04/07-06/08/2018 (34 days)Stroke––Dead
7/2580470/MNR04/08/2018Rectal swabColonization25/07-02/08/2018 (9 days)StrokeAmoxicillin/clavulanic acid–Alive
11/2580850/FNR04/08/2018Rectal swabColonization23/07-03/08/2018 (12 days)Stroke––Alive
13/2581077/MNR04/08/2018Rectal swabColonization22/07-09/08/2018 (19 days)Hypertension, ischemic heart diseaseAmoxicillin/clavulanic acid–Alive
670/FREU09/03/2018Rectal swabColonization26/02-14/03/2018 (17 days)Diabetes, metastatic lung cancer––Alive
778/FREU09/03/2018Rectal swabColonization27/02-16/03/2018(18 days)Rheumatoid Arthritis (RA), hemorrhagic diathesis, coronary disease, peptic ulcer disease, hypertension, atherosclerosis, goutImipenemVancomycinAlive
590/FREU08/03/2018Rectal swabColonization03.03-17.03.2018 (14 days)Atherosclerosis, acute arterial thrombosis of the lower extremityMeropenem + Amikacin–Alive

1 F – Female; M – male; NR – Department of Neurology with the Stroke Subdepartment; OAIT – Department of Anaesthesiology and Intensive Care; REU – Department of Internal Medicine and Rheumatology

Fig. 1.

Gantt diagram depicting a timeline of patients’ admissions in relationship with the three wards and the length of stay in each ward. Epidemic curve based on the number of K. pneumoniae isolated in the time frame of the study.

Abbreviations: OAIT-Department of Anaesthesia and Intensive Care, NR-Department of Neurology with the Stroke Subdepartment, REU-Department of Internal Medicine and Rheumatology.

Table II

Antimicrobial resistance profiles of the studied K. pneumoniae isolates.

Patient ID/Isolate no.369656976/16976/21696824154/254287/2580411/2580813/25810675
Antibiotics:MIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/SMIC (pg/ml)R/I/S
PenicillinsAmoxicillin/Clavulanic acid>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R
Ampicillin>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R
CephalosporinsCefaclor>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R
Cefuroxime>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R
Cefotaxime>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R
Cefotaxime/Cefotaxime + clavulanic acid>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R>16/>1R
Ceftazidime>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R
Ceftazidime/Ceftazidime + clavulanic acid>34/>4R>34/>4R>34/>4R>34/>4R>34/>4R>34/>4R34/>4R>34/>4R>34/>4R>34/>4R>34/>4R>34/>4R>34/>4R>34/>4R>34/>4R
Cefepime>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R
CarbapenemsDoripenem>32R16R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R
Ertapenem>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R
Imipenem>32R>32R16R16R>32R>32R>32R>32R>12R4S4S8I>32R>32R>32R
Meropenem>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R
QuinoloneCiprofloxacin>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R
AminoglycosidesAmikacin4S8S32R32R8S12R6S4S8S8S8S8S12R6S6S
Gentamycin64R64R64R64R64R64R64R64R64R64R64R64R64R64R64R
Netylmycin128R4I64R64R128R32R16R16R12R16R16R16R32R16R16R
Tobramycin64R64R32R32R64R64R64R64R32R64R64R64R64R64R64R
OtherAztreonam>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R>256R
Colistin0.50S0.75S0.125S0.125S0.50S0.50S0.50S0.50S0.50S0.50S0.75S0.50S0.50S0.50S0.50S
Tetracycline32R128R8R8R32R32R32R8R>256R>256R>256R>256R8R8R128R
Tigecycline2R8R4R4R2R2R2R4R0.75R0.75R1.0R2R4R4R8R
Trimethoprim/Sulfamethoxazole>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R>32R
Fosfomycin>256R>256R>256R>256R>256R>256R>256R>256R>256R>256RR>256R>256R>256R>256R>256R

2 MIC – Minimum Inhibitory Concentration; R – Resistant; I – Susceptible, increased exposure; S – Susceptible

Fig. 2.

Dendrogram of XbaI-digested genomic DNA from carbapenemase-co-producing K. pneumoniae isolates, additionally presenting the results of PCRs for genes encoding carbapenemases and other β-lactamase. PFGE settings: similarity coefficient, Dice; optimization, 1%; tolerance, 1%; clustering method, UPGMA.

DOI: https://doi.org/10.33073/pjm-2021-010 | Journal eISSN: 2544-4646 | Journal ISSN: 1733-1331
Language: English
Page range: 107 - 116
Submitted on: Oct 27, 2020
Accepted on: Feb 8, 2021
Published online: Mar 19, 2021
Published in print: Mar 1, 2021
Published by: Polish Society of Microbiologists
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2021 DOROTA OCHOŃSKA, HANNA KLAMIŃSKA-CEBULA, ANNA DOBRUT, MAŁGORZATA BULANDA, MONIKA BRZYCHCZY-WŁOCH, published by Polish Society of Microbiologists
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 License.