Have a personal or library account? Click to login
Project Realization Scheduling and its Multi Criteria Evaluation Cover

Project Realization Scheduling and its Multi Criteria Evaluation

Open Access
|Mar 2012

References

  1. Adamiecki K. - O nauce organizacji. PWE, Warszawa 1970.
  2. A Guide to the Project Management Body of Knowledge. Edition PMI, USA 2004.
  3. Alba E. (ed.) - Parallel Metaheuristics. A New Class of Algorithms. Wiley-Interscience, New Jersey 2005.10.1002/0471739383
  4. Askin R. G., Goldberg J. B. - Design and Analysis of Lean Production Systems. John Wiley & Sons, Inc., New York 2002.
  5. Ballestin F. - When it is worthwile to work with the stochastic RCPSP? [in] Journal of Scheduling. No. 10 (3), 2002, pp. 153-166.10.1007/s10951-007-0012-1
  6. Ballestin F., Leus R. - Resource-constrained project scheduling for timely project completion with stochastic activity durations, Katholieke Universiteit, Leuven 2007, pp. 1-32.10.2139/ssrn.1089381
  7. Beck J. Ch., Fox M. S. - Constraint-Directed Techniques for Scheduling Alternative Activities [in] Artificial Intelligence. No. 121, 2000, pp. 211-250.10.1016/S0004-3702(00)00035-7
  8. Bidot J., Vidal T., Laborie P., Beck J. Ch. - A General Framework for Scheduling in a Stochastic Environment [in] Inter. Conference on Artificial Intelligence, IJCAI 2007, pp. 56-61.
  9. Błażewicz J., Ecker K., Pesch E, Schmidt G., Węglarz J. - Handbook On Scheduling. From Theory to Applications. Springer, Berlin 2007.
  10. British Standars - Project management. Vocabulary, No. BS 6079 -2:2000, BSI, 2000.
  11. Cadle J., Yeates D. - Project Management for Information Systems. Prentice Hall 2004.
  12. Chiang A. C. - Elementy dynamicznej optymalizacji. Wyższa Szkoła Handlu i Finansów Międzynarodowych, Warszawa 2002.
  13. Chiang T-Ch, Chang P-Y, Huang Y-M - Multi-Procesor Tasks with Resource and Timing Constraints Using Particle Swarm Optimization [in] IJCSNS International Journal of Computer Science and Network Security. Vol. 6, No. 4, April 2006, pp. 71-77.
  14. Collette Y., Siary P. - Multiobjective Optimization. Principles and Case studies. Springer -Verlag, Berlin-Heidelberg-New York 2004.
  15. Flasiński M. - Zarządzanie projektami informatycznymi. PWN, Warszawa 2006.
  16. Gerchak Y. - On the allocation of uncertaintyreduction effort to minimize total varability III Transactions 32, 2000, pp. 403-407.10.1080/07408170008963916
  17. Gutjahr W. J., Straus C., Wagner E. - A stochastic branch-and-bound approach to activity crashing in project management [in] INFORMS Journal on Computing. 12 (2), 2000, pp. 125-135.10.1287/ijoc.12.2.125.11894
  18. Hapke M., Jaszkiewicz A., Słowiński R. - Interactive analysis of multiple-criteria Project scheduling problems [in] European Journal of Operational Research. No. 107, 1998, pp. 315-324.10.1016/S0377-2217(97)00336-6
  19. Hughes B., Cotterell M. - Software Project Management. Mc Graw Hill, 2006.
  20. Janiak A. - Wybrane problemy i algorytmy szeregowania zadań i rozdziału zasobów. Akademicka Oficyna Wydawnicza PLJ, Warszawa 1999.
  21. Kerzner H. - Advanced Project Management (edycja polska). Helion, Gliwice 2004.
  22. Kerzner H. - Project Management. John Wiley & Sons Inc., New Jersey 2006.
  23. Kostrubiec A. - Harmonogramowanie realizacji projektów - przegląd modeli [in] Inżynieria Zarządzania Przedsięwzięciami, Wydawnictwo Politechniki Gdańskiej, Gdańsk 2003, pp. 33-52.
  24. Leu S. S., Yang C. H. - GA-based multicriteria optimal model for construction scheduling [in] Journal of Construction Engineering and Management. 125(6), 1999, pp. 420-427.10.1061/(ASCE)0733-9364(1999)125:6(420)
  25. Lova A., Maroto C., Tormos P. - A multicriteria heuristic method to improve resource allocation in multiproject scheduling [in] European Journal of Operational Research. No. 127, 2000, pp. 408-424.10.1016/S0377-2217(99)00490-7
  26. Marsh E. R. - The Harmonogram of Karol Adamiecki [in] The Academy of Management Journal. Vol. 18, No 2, 1975, pp. 358-364.10.5465/255537
  27. Michalewicz Z., Fogel D. B. - How to Solve It: Modern Heuristics. Springer - Verlag, Berlin-Heidelberg 2002.
  28. Muth J., Thompson G. - Industrial Scheduling. Prentice - Hall Inc., New Jersey, 1963.
  29. Pawlak M. - Zarządzanie projektami. Wydawnictwo Naukowe PWN, Warszawa 2006.
  30. Pritchard C. L. - Zarządzanie ryzykiem w projektach. Teoria i praktyka. WIG-PRESS, Warszawa 2002.
  31. Rutkowski L. - Metody i techniki sztucznej inteligencji. PWN, Warszawa 2005.
  32. Sakalauskas L., G. Felinskas G. - Optimization of Resource-Constrained Project Schedules by Simulated Annealing and Variable Neighborhood Search [in] Journal Ukio Technologinis Ir Ekonominis Vysty. Vol XII, No. 4, 2006, pp. 307-313.10.3846/13928619.2006.9637759
  33. Smutnicki Cz. - Algorytmy szeregowania. Akademicka Oficyna Wydawnicza EXIT, Warszawa 2000.
  34. Stork F. - Stochastic resource-constrained project scheduling. Ph. D. Thesis, Technische Universitat, Berlin 2001.
  35. Sule D. R. - Production Planning and Industrial Scheduling. CRC Press, N. Y. 2008.10.1201/9781420044218
  36. Trocki M., Grucza B., Ogonek K., Zarządzanie projektami, Polskie Wydawnictwo Ekonomiczne, Warszawa 2003.
  37. Tsai Y. W., Gemmill D. D. - Using tabu search to schedule activities of stochastic resourceconstrained projects [in] European Journal of Operational Research. No. 111, 1998, pp. 129-141.10.1016/S0377-2217(97)00311-1
  38. Viana A., de Sousa J. P. - Using metaheuristic in multiobjective resource constrained project scheduling [in] European Journal of Operational Research. No. 120, 2000, pp. 359-374.10.1016/S0377-2217(99)00163-0
  39. Weigert G., Werner S., Hampel D., Heinrich H., W. Sauer W. - Multi Objective Decision Making-Solutions for the Optimization of Manufacturing Processes. 10th International Conference FAIM'2000, Flexible Automation and Intelligent Manufacturing, Maryland, USA 2000.
  40. Witkowski T. - Algorytm rozpoznawania problemu szeregowania zadań [in] Informatyka. No. 6, 1993, pp. 20-26.
  41. Witkowski T., Antczak A., Antczak P. - Random and Evolution Algorithms of Tasks Scheduling and the Production Scheduling [in] Proceedings of International Joint Conference on Fuzzy Systems - FUZZ - IEEE. Vol. 2, 2004, Budapest 2004, pp. 727-732.
  42. Witkowski T., Antczak P., Antczak A. - Tabu Search and GRASP used in hybrid procedure for optimize the flexible job shop problem [in] Fuzzy Logic, Soft Computing and Computional Intelligence (Liu Y., Chen G., Ying M. ed.). IFSA 2005, vol. III, Tsinghua University Press - Springer, Beijing 2005, pp. 1620-1625.
  43. Witkowski T., Antczak P., Antczak A. - The application of simulated annealing procedure for the flexible job shop scheduling problem [in] Proceedings 11th Inter. Conf. Information Processing and Management of Uncertainty in Knowledge-Based Systems. IPMU 2006, Paris 2006, pp. 21-26.
  44. Witkowski T., Antczak A., Antczak P. - Schedule Cluster Recognition with Use Conditional Probability [in] Proceedings of the 4-th IEEE Workshop on Intelligent Data Acquistion and Advanced Computing Systems: Technology and Applications. IDAACS 2007, Dortmund 2007, pp. 413-418.
  45. Wysocki R. K., McGary R. - Efektywne zarządzanie projektami. Helion, Gliwice 2003.
DOI: https://doi.org/10.2478/v10238-012-0009-8 | Journal eISSN: 2300-5661 | Journal ISSN: 2080-7279
Language: English
Page range: 25 - 44
Published on: Mar 19, 2012
Published by: Warsaw University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2012 Tadeusz Witkowski, Paweł Antczak, Arkadiusz Antczak, published by Warsaw University of Technology
This work is licensed under the Creative Commons License.

Volume 1 (2009): Issue 2 (December 2009)