Project Realization Scheduling and its Multi Criteria Evaluation

Abstract
The paper focuses on project scheduling classification issues according to the type of constraints and optimization directions. Special attention was paid to production scheduling, presenting the basic issues in relation with product flow organizational criterion. Open-cluster issue was formulated and analyzed with the use of modern heuristics. Solution was evaluated with multiple criteria, mainly on the basis of time characteristics. Production process flow relations, in coordinates determined by operation sequence at particular workplaces, as well as the production type factor were presented.
© 2012 Tadeusz Witkowski, Paweł Antczak, Arkadiusz Antczak, published by Warsaw University of Technology
This work is licensed under the Creative Commons License.