Project Realization Scheduling and its Multi Criteria Evaluation

Open Access
|Mar 2012

Abstract

The paper focuses on project scheduling classification issues according to the type of constraints and optimization directions. Special attention was paid to production scheduling, presenting the basic issues in relation with product flow organizational criterion. Open-cluster issue was formulated and analyzed with the use of modern heuristics. Solution was evaluated with multiple criteria, mainly on the basis of time characteristics. Production process flow relations, in coordinates determined by operation sequence at particular workplaces, as well as the production type factor were presented.

DOI: https://doi.org/10.2478/v10238-012-0009-8 | Journal eISSN: 2300-5661 | Journal ISSN: 2080-7279
Language: English
Page range: 25 - 44
Published on: Mar 19, 2012
Published by: Warsaw University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2012 Tadeusz Witkowski, Paweł Antczak, Arkadiusz Antczak, published by Warsaw University of Technology
This work is licensed under the Creative Commons License.

Volume 1 (2009): Issue 2 (December 2009)