Assessment of construction baseline schedule quality in transportation projects
References
- Abdelaty, A., & Jamal, M. S. (2022). Guidelines for Developing and Reviewing Baseline Schedules for Wyoming Transportation Projects. Available at https://rosap.ntl.bts.gov/view/dot/64092
- Abdelhadi, Y. F. J. (2015). Common Delay Analysis Methods and Factors Influencing the Selection of Such Methods in Construction Projects in UAE.
- Al-Gahtani, K. S., & Mohan, S. B. (2011). Delay analysis techniques comparison. Journal of Civil Engineering and Architecture, 5(8), pp. 740-747.
- Arcuri, F. J., & Hildreth, J. C. (2007). The principles of schedule impact analysis (TR-07-03). VDOT-VT Partnership for Project Scheduling, Virginia Tech, Blacksburg, VA‥
- Arditi, D., & Pattanakitchamroon, T. (2006). Selecting a delay analysis method in resolving construction claims. International Journal of Project Management, 24(2), pp. 145-155. doi: 10.1016/j.ijproman.2005.08.005
- Ballast, L. A., & Popescu, C. M. (2001). Selecting planning and scheduling specifications. AACE International Transactions, p. S11.
- Bragadin, M. A., & Kähkönen, K. (2016). Schedule health assessment of construction projects. Construction Management and Economics, 34(12), pp. 875-897. doi: 10.1080/01446193.2016.1205751
- Braimah, N., & Ndekugri, I. (2009). Consultants’ perceptions on construction delay analysis methodologies. Journal of Construction Engineering and Management, 135(12), pp. 1279-1288. doi: 10.1061/(ASCE)CO.1943-7862.0000096
- Bramble, B. B., & Callahan, M. T. (1987). Construction Delay Claims. Wiley Law Publications, New York (NY).
- Carson, C. (2013). Dealing with contractors’ schedules that cannot be approved. Cost Engineering, 55(5), pp. 4-16.
- CEVM (Center for Earned Value Management). (2008). Earned Value Management System Implementation Guide. Center for Earned Value Management.
- CVEM (Center for Value Engineering Management). (2008). Value Engineering Guidelines. Center for Value Engineering Management.
- DAU (Defense Acquisition University). (2011). Integrated Master Schedule (IMS) Preparation and Assessment Guide. Defense Acquisition University, Fort Belvoir, VA.
- Defense Contract Management Agency (DCMA). (2012). DCMA 14-Point Assessment for Schedule Quality. Defense Contract Management Agency, USA.
- Department of Defense (DOD). (2005). Earned Value Management Implementation Guide. U.S. Department of Defense, Washington, DC.
- Department of Defense (DOD). (2012). Integrated Program Management Report (IPMR) Implementation Guide. U.S. Department of Defense, Washington, DC.
- Dzeng, R.-J., Tserng, H. P., & Wang, W.-C. (2005). Automating schedule review for expressway construction. Journal of Construction Engineering and Management, 131(1), pp. 127-136. doi: 10.1061/(ASCE)0733-9364(2005)131:1(127)
- Ekanayake, E. M. K., & Perera, B. (2016). Appropriate delay analysis techniques to analyze delays in road construction projects in Sri Lanka. Built Environment Project and Asset Management, 6(5), pp. 521-534. doi: 10.1108/BEPAM-08-2015-0039
- Elnagar, H., & Yates, J. K. (1997). Construction documentation used as indicators of delays. Cost Engineering, 39(8), p. 31.
- Fisher, D. J., & Rajan, N. (1996). Automated constructibility analysis of work-zone traffic control planning. Journal of Construction Engineering and Management, 122(1), pp. 36-43. doi: 10.1061/(ASCE)0733-9364(1996)122:1(36)
- Fruchtman, E. (2000). Delay analysis – eliminating the smoke and mirrors. AACE International Transactions, pp. CDR.6.1-CDR.6.4.
- GAO, G. S. A. (2012). Best Practices for Project Schedules. United States Government Accountability Office, Washington, DC, USA.
- Golnaraghi, S. (2011). Development of delay claims assessment model. Master’s thesis, Concordia University, Building, Civil, and Environmental Engineering.
- Han, S., Choi, J. O., & O’Connor, J. T. (2017). Quality of baseline schedules: Lessons from higher education capital facility projects. Journal of Professional Issues in Engineering Education and Practice, 143(1), p. 04016017. doi: 10.1061/(ASCE)EI.1943-5541.0000302
- Hegazy, T., & Menesi, W. (2010). Critical path segments scheduling technique. Journal of Construction Engineering and Management, 136(10), pp. 1078-1085. doi: 10.1061/(ASCE)CO.1943 7862.0000212
- Hinze, J. (2008). Construction Planning and Scheduling, Vol. 3. Pearson Prentice Hall, Upper Saddle River (NJ).
- Jamal, M. S., Abdelaty, A., & Shrestha, J. (2022). Construction delay analysis using daily work report data for short construction seasons. International Conference on Construction Engineering and Project Management, 9, pp. 616-623. doi: 10.6106/ICCEPM.2022.0616
- Kapote, M., Patil, P., & Pimplikar, S. (2023). Effective pre-qualification systems–Are they essential for minimising delays on road projects? Organization, Technology & Management in Construction: An International Journal, 15(1), pp. 213-220. doi: 10.2478/otmcj-2023-0015
- Kubečková, D., & Smugala, S. (2021). Determination of construction process duration based on labor productivity estimation: A case study. Organization, Technology & Management in Construction: An International Journal, 13(1), pp. 2521-2538. doi: 10.2478/otmcj-2021-0031
- Kumar, V., Pandey, A., & Singh, R. (2023). Project success and critical success factors of construction projects: project practitioners’ perspectives. Organization, Technology & Management in Construction: An International Journal, 15(1), pp. 1-22. doi: 10.2478/otmcj-2023-0001
- Lovejoy, V. A. (2004). Claims schedule development and analysis: Collapsed as-built scheduling for beginners. Cost Engineering, 46(1), p. 27.
- Lucko, G. (2009). Productivity scheduling method: Linear schedule analysis with singularity functions. Journal of Construction Engineering and Management, 135(4), pp. 246-253. doi: 10.1061/(ASCE)0733-9364(2009)135:4(246)
- National Defense Industrial Association (NDIA). (2016). Planning and Scheduling Excellence Guide (PASEG). National Defense Industrial Association, Arlington, VA.
- Naval Air (NAVAIR). (2010). Integrated Master Schedule Guidebook. Naval Air Systems Command, Patuxent River, MD.
- Ng, S. T., Skitmore, M., Deng, M. Z., & Nadeem, A. (2004). Improving existing delay analysis techniques for the establishment of delay liabilities. Construction Innovation, 4(1), pp. 3-17. doi: 10.1108/14714170410814971
- O’Brien, J. J. (1993). CPM in Construction Management (4th ed.). McGraw-Hill, New York.
- Office of Facilities Planning and Construction (OFPC). (2011). Project Planning and Scheduling Guidelines. Office of Facilities Planning and Construction.
- Panas, A., Pantouvakis, J. P., & Kalogiannaki, M. (2023). Comparative assessment of deterministic methodologies for estimating excavation productivity. Organization, Technology & Management in Construction: An International Journal, 15(1), pp. 63-78. doi: 10.2478/otmcj-2023-0007
- Project Management Institute (PMI). (2011). Practice Standard for Scheduling. Project Management Institute, Newtown Square, PA, USA.
- PMI, A. (2008). Guide to the Project Management Body of Knowledge (PMBOK GUIDE), 4th edn. an American National Standard.
- Risan, H. K., Serhan, F. M., & Al-Azzawi, A. A. (2024). Management of a typical experiment in engineering and science. AIP Conference Proceedings, 2864(1), 050001. doi: 10.1063/5.0186079
- Street, I. A. (2000). The pitfalls of CPM scheduling on construction projects. Cost Engineering, 42(8), p. 35.
- Tirataci, H., & Yaman, H. (2023). Estimation of ideal construction duration in tender preparation stage for housing projects. Organization, Technology & Management in Construction: An International Journal, 15(1), pp. 192-212. doi: 10.2478/otmcj-2023-0014
- Zack, Jr., J. G. (1992). Schedule ‘games’ people play, and some suggested ‘remedies.’. Journal of Management in Engineering, 8(2), pp. 138-152. doi: 10.1061/(ASCE)97 42-597X(1992)8:2(138)
- Zafar, Z. Q. (1996). Construction project delay analysis. Cost Engineering, 38(3), p. 23.
Language: English
Page range: 33 - 50
Submitted on: Feb 10, 2025
Accepted on: Jul 2, 2025
Published on: May 11, 2026
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year
Keywords:
Related subjects:
© 2026 Md Shah Jamal, Ahmed Abdelaty, Mohammed S. Hashem M. Mehany, K. Joseph Shrestha, Mohamed S. Yamany, published by University of Zagreb
This work is licensed under the Creative Commons Attribution 4.0 License.