The structural equation model of risk factors influencing government irrigation project Cover

The structural equation model of risk factors influencing government irrigation project

Open Access
|Aug 2025

References

  1. Abdaljader, A., &amp; Günal, M. (2024). Main risk factors causing delays in GAP construction projects in turkey by using relative importance index (RII) method. <em>Iranian Journal of Science and Technology, Transactions of Civil Engineering, 48</em>, pp. 611-633. doi: <a href="https://doi.org/10.1007/s40996-023-01207-6" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1007/s40996-023-01207-6</a>
  2. Abowitz, D. A., &amp; Toole, T. M. (2010). Mixed method research: Fundamental issues of design, validity, and reliability in construction research. <em>Journal of Construction Engineering and Management, 136</em>, pp. 108-116. doi: <a href="https://doi.org/10.1061/(ASCE)CO.1943-7862.0000026" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1061/(ASCE)CO.1943-7862.0000026</a>
  3. Adedokun, O., &amp; Egbelakin, T. (2024). Structural equation modelling of risk factors influencing the success of building projects. <em>Journal of Facilities Management, 22</em>, pp. 64-90. doi: <a href="https://doi.org/10.1108/JFM-01-2022-0002" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1108/JFM-01-2022-0002</a>
  4. Ajayi, O., Thwala, W., Okanlawon, S., &amp; Odunjo, O. (2015). Assessment of the impact of musculoskeletal disorders on Nigerian construction workers. <em>Industrial Management &amp; Data Systems, 3</em>, pp. 69-84.
  5. Al Shami, K. (2018). Investigating the use of building information modeling (BIM) in managing construction claims. <em>PM World Journal, 7</em>, pp. 1-17.
  6. Amarasekara, W., Perera, B., &amp; Rodrigo, M. (2018). Impact of differing site conditions on construction projects. <em>Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10</em>, p. 04518006. doi: <a href="https://doi.org/10.1061/(ASCE)LA.1943-4170.0000257" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1061/(ASCE)LA.1943-4170.0000257</a>
  7. Assaf, S. A., &amp; Al-Hejji, S. (2006). Causes of delay in large construction projects. <em>International Journal of Project Management, 24</em>, pp. 349-357. doi: <a href="https://doi.org/10.1016/j." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.</a> ijproman.2005.11.010
  8. Bahamid, R., Doh, S., Al-Sharafi, M., &amp; Rahimi, A. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In: <em>IOP Conference Series: Materials Science and Engineering</em>, 2020. IOP Publishing, 012007.
  9. Briscoe, J. (1999). The financing of hydropower, irrigation and water supply infrastructure in developing countries. <em>International Journal of Water Resources Development, 15</em>, pp. 459-491. doi: <a href="https://doi.org/10.1080/07900629948718" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1080/07900629948718</a>
  10. Burke, R. (2013). <em>Project Management: Planning and Control Techniques</em>. John Wiley &amp; Sons, Chichester, United Kingdom.
  11. Burrows, G. L. (1953). Cochran. Sampling Techniques (Book Review). <em>Social Forces, 32</em>, p. 304. doi: <a href="https://doi.org/10.2307/2573260" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.2307/2573260</a>
  12. Cevikbas, M., Okudan, O., &amp; IŞıK, Z. (2024). Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. <em>Engineering. Construction and Architectural Management, 31</em>, pp. 1-27. doi: <a href="https://doi.org/10.1108/ECAM-05-2022-0470" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1108/ECAM-05-2022-0470</a>
  13. Chaitongrat, T., Liwthaisong, S., Aksorn, P., Kusonkhum, W., &amp; Leungbootnak, N. (2021). Causal relationship model of problems in public sector procurement. <em>Geomate Journal, 20</em>, pp. 52-58. doi: <a href="https://doi.org/10.21660/2021.80.6266" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.21660/2021.80.6266</a>
  14. Ehrlinger, L., &amp; Wöß, W. (2022). A survey of data quality measurement and monitoring tools. <em>Frontiers in Big Data, 5</em>, p. 850611. doi: <a href="https://doi.org/10.3389/fdata.2022.850611" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3389/fdata.2022.850611</a>
  15. Ekung, S., Lashinde, A., &amp; Adu, E. (2021). Critical risks to construction cost estimation. <em>Journal of Engineering, Project &amp; Production Management, 11</em>, pp. 19-29. doi: <a href="https://doi.org/10.2478/jeppm-2021-0003" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.2478/jeppm-2021-0003</a>
  16. Frimpong, Y., Oluwoye, J., &amp; Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. <em>International Journal of Project Management, 21</em>, pp. 321-326. doi: <a href="https://doi.org/10.1016/S0263-7863(02)00055-8" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/S0263-7863(02)00055-8</a>
  17. Gajera, R. (2024). Enhancing risk management in construction projects: Integrating Monte Carlo simulation with Primavera risk analysis and PowerBI dashboards. <em>Bulletin of Pure and Applied Sciences-Zoology, 43B</em>(2S), pp. 1407-1418.
  18. Ghorbani, A. (2023). A review of successful construction project managers’ competencies and leadership profile. <em>Journal of Rehabilitation in Civil Engineering, 11</em>, pp. 76-95. doi: <a href="https://doi.org/10.22075/JRCE.2022.24638.1560" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.22075/JRCE.2022.24638.1560</a>
  19. Haupt, T. C., &amp; Padayachee, K. (2016). Financial Management capacity and business failure of contractors. In: <em>10th Building ASOCSA Environment Conference</em>, Porth Elizabeth, South Africa, July, 2016, pp. 213-226.
  20. Hollmann, J. K. (2006). <em>Total Cost Management Framework: An Integrated Approach to Portfolio, Program, and Project Management</em>. AACE International, Morgantown, West Virginia, USA.
  21. Jaffar, N., Tharim, A. A., &amp; Shuib, M. (2011). Factors of conflict in construction industry: A literature review. <em>Procedia Engineering, 20</em>, pp. 193-202. doi: <a href="https://doi.org/10.1016/j.proeng.2011.11.156" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.proeng.2011.11.156</a>
  22. Kaliba, C., Muya, M., &amp; Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. <em>International Journal of Project Management, 27</em>, pp. 522-531. doi: <a href="https://doi.org/10.1016/j.ijproman.2008.07.003" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.ijproman.2008.07.003</a>
  23. Kamal, A., Abas, M., Khan, D., &amp; Azfar, R. W. (2022). Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. <em>International Journal of Construction Management, 22</em>, pp. 1141-1157. doi: <a href="https://doi.org/10.1080/15623599.2019.1683693" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1080/15623599.2019.1683693</a>
  24. Kangpheng, S., Gunlong, S., &amp; Kaewin, D. (2016). <em>Mixed Methods: Paradigms of Research for the 21st Century</em>. Apichat, Khon Kaen.
  25. Kilag, O. K. T., Largo, J. M., Rabillas, A. R., Kilag, F. E., Angtud, M. K. A., Book, J. F. P., et al. (2024). Administrators’ conflict management and strategies. <em>Journal of Higher Education and Academic Advancement, 1</em>, pp. 22-31. doi: <a href="https://doi.org/10.61796/ejheaa.v1i2.98" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.61796/ejheaa.v1i2.98</a>
  26. Koç, C. (2011). A study on construction costs per unit area of irrigation projects. <em>Irrigation and Drainage Systems, 25</em>, pp. 255-263. doi: <a href="https://doi.org/10.1007/s10795-011-9120-3" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1007/s10795-011-9120-3</a>
  27. Kusonkhum, W., Srinavin, K., &amp; Chaitongrat, T. (2023). The adoption of a big data approach using machine learning to predict bidding behavior in procurement management for a construction project. <em>Sustainability, 15</em>, p. 12836. doi: <a href="https://doi.org/10.3390/su151712836" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3390/su151712836</a>
  28. Lester, A. (2007). <em>Project Management, Planning and Control</em>. Butterworth-Heinemann, Burlington.
  29. Lytvyn, N. (2017). Evaluation of the company’s personnel on the basis of construction models of competences. <em>Regional Aspects of Productive Forces Development of Ukraine</em>. Publishing and Printing Center "Universitska Dumka", str. Lvivska, 11, Ternopil, Ukraine, tel. (0352) 47 58 72, West Ukrainian National University. pp. 125-131.
  30. McDermot, E., Agdas, D., Rodríguez Díaz, C. R., Rose, T., &amp; Forcael, E. (2022). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study. <em>International Journal of Construction Management, 22</em>, pp. 2469-2483. doi: <a href="https://doi.org/10.1080/15623599.2020.1797985" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1080/15623599.2020.1797985</a>
  31. Odeh, A. M., &amp; Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. <em>International Journal of Project Management, 20</em>, pp. 67-73. doi: <a href="https://doi.org/10.1016/S0263-7863(00)00037-5" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/S0263-7863(00)00037-5</a>
  32. Osei-Asibey, D., Ayarkwa, J., Adinyira, E., Acheampong, A., &amp; Amoah, P. (2021). Roles and responsibilities of stakeholders towards ensuring health and safety at construction site. <em>Journal of Building Construction and Planning Research, 9</em>, pp. 90-114. doi: <a href="https://doi.org/10.4236/jbcpr.2021.91008" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.4236/jbcpr.2021.91008</a>
  33. Ostle, B. (1963). <em>Statistics in Research</em>, 2nd edn. TheTowa State University Press, Ames.
  34. Pallant, J. (2020). <em>SPSS Survival Manual: A Step by Step Guide to Data Analysis Using IBM SPSS</em>. Routledge, London, United Kingdom.
  35. Peterzens-Nysten, T. (1998). Protection of discovered antiquities in Finland. <em>Art Antiquity &amp; Law, 3</em>, Master of Science Thesis, Master of Science in Construction Management Institution: School of Science and Engineering, Reykjavík University. p. 355.
  36. Pétursson, B. K. (2015). Disputes and conflicts within construction contracts in the Icelandic construction industry.
  37. PMI, A. (2013). <em>A Guide to the Project Management Body of Knowledge (PMBOK® Guide)</em>, 5th edn. Project Management Institute, Newtown Square, Pennsylvania, USA.
  38. Ramaswamy, B. (2013). Groundwater modeling to assist in designing a dewatering system for the protection of Egyptian antiquities. In: <em>2013 NGWA Summit – The National and International Conference on Groundwater</em>, NGWA.
  39. San, L. Y. (2013). A study of causes and effects of conflict in construction industry. Un-published Bachelor Degree Dissertation, Bachelor of Project Management, Faculty of Technology, University Malaysia Pahang, Malaysia.
  40. Saram, D. D. D., &amp; Ahmed, S. M. (2001). Construction coordination activities: What is important and what consumes time. <em>Journal of Management in Engineering, 17</em>, pp. 202-213. doi: <a href="https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(202)" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1061/(ASCE)0742-597X(2001)17:4(202)</a>
  41. Shibani, A., Hasan, D., Saaifan, J., Sabboubeh, H., Eltaip, M., Saidani, M., et al. (2024). Financial risk management in the construction projects. <em>Journal of King Saud University-Engineering Sciences, 36</em>, pp. 552-561. doi: <a href="https://doi.org/10.1016/j.jksues.2022.05.001" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.jksues.2022.05.001</a>
  42. Shubham, V. (2013). Causes of delay in project construction in developing countries. <em>Indian Journal of Commerce &amp; Management Studies ISSN, 2240</em>, p. 310.
  43. Srinavin, K., Kusonkhum, W., Chonpitakwong, B., Chaitongrat, T., Leungbootnak, N., &amp; Charnwasununth, P. (2021). Readiness applying big data technology for construction management in Thai public sector. <em>Journal of Advances in Information, 12</em>, pp. 1-5. doi: <a href="https://doi.org/10.12720/jait.12.1.1-5." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.12720/jait.12.1.1-5.</a>
  44. Suárez, D., Díaz-Puente, J. M., &amp; Bettoni, M. (2021). Risks identification and management related to rural innovation projects through social networks analysis: A case study in Spain. <em>Land, 10</em>, p. 613. doi: <a href="https://doi.org/10.3390/land10060613" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3390/land10060613</a>
  45. Tam, C. M., Zeng, S., &amp; Deng, Z. (2004). Identifying elements of poor construction safety management in China. <em>Safety Science, 42</em>, pp. 569-586. doi: <a href="https://doi.org/10.1016/j.ssci.2003.09.001" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.ssci.2003.09.001</a>
  46. Taylor, S., &amp; Littleton, K. (2008). Art work or money: Conflicts in the construction of a creative identity. <em>The Sociological Review, 56</em>, pp. 275-292. doi: <a href="https://doi.org/10.1111/j.1467-954X.2008.00788.x" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1111/j.1467-954X.2008.00788.x</a>
  47. The Government Procurement and Supplies Management Act (2017). The Comptroller General’s Department, Bangkok.
  48. Thorndike, R. L. (1936). Factor analysis of social and abstract intelligence. <em>Journal of Educational Psychology, 27</em>, p. 231. doi: <a href="https://doi.org/10.1037/h0059840" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1037/h0059840</a>
  49. Vorakitkasemsakul, S. (2011). Applied Statistics for Behavioral and Social Science Research. Aksonsin, Udon Thani.
DOI: https://doi.org/10.2478/otmcj-2025-0010 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 154 - 170
Submitted on: Aug 28, 2024
Accepted on: Mar 6, 2025
Published on: Aug 12, 2025
Published by: Sciendo
In partnership with: Paradigm Publishing Services
Publication frequency: 1 times per year

© 2025 Anuchat Leeanansaksiri, Phongphan Tankasem, Wuttipong Kusonkhum, published by Sciendo
This work is licensed under the Creative Commons Attribution 4.0 License.