Abdaljader, A., & Günal, M. (2024). Main risk factors causing delays in GAP construction projects in turkey by using relative importance index (RII) method. <em>Iranian Journal of Science and Technology, Transactions of Civil Engineering, 48</em>, pp. 611-633. doi: <a href="https://doi.org/10.1007/s40996-023-01207-6" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1007/s40996-023-01207-6</a>
Abowitz, D. A., & Toole, T. M. (2010). Mixed method research: Fundamental issues of design, validity, and reliability in construction research. <em>Journal of Construction Engineering and Management, 136</em>, pp. 108-116. doi: <a href="https://doi.org/10.1061/(ASCE)CO.1943-7862.0000026" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1061/(ASCE)CO.1943-7862.0000026</a>
Adedokun, O., & Egbelakin, T. (2024). Structural equation modelling of risk factors influencing the success of building projects. <em>Journal of Facilities Management, 22</em>, pp. 64-90. doi: <a href="https://doi.org/10.1108/JFM-01-2022-0002" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1108/JFM-01-2022-0002</a>
Ajayi, O., Thwala, W., Okanlawon, S., & Odunjo, O. (2015). Assessment of the impact of musculoskeletal disorders on Nigerian construction workers. <em>Industrial Management & Data Systems, 3</em>, pp. 69-84.
Al Shami, K. (2018). Investigating the use of building information modeling (BIM) in managing construction claims. <em>PM World Journal, 7</em>, pp. 1-17.
Amarasekara, W., Perera, B., & Rodrigo, M. (2018). Impact of differing site conditions on construction projects. <em>Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10</em>, p. 04518006. doi: <a href="https://doi.org/10.1061/(ASCE)LA.1943-4170.0000257" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1061/(ASCE)LA.1943-4170.0000257</a>
Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. <em>International Journal of Project Management, 24</em>, pp. 349-357. doi: <a href="https://doi.org/10.1016/j." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.</a> ijproman.2005.11.010
Bahamid, R., Doh, S., Al-Sharafi, M., & Rahimi, A. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In: <em>IOP Conference Series: Materials Science and Engineering</em>, 2020. IOP Publishing, 012007.
Briscoe, J. (1999). The financing of hydropower, irrigation and water supply infrastructure in developing countries. <em>International Journal of Water Resources Development, 15</em>, pp. 459-491. doi: <a href="https://doi.org/10.1080/07900629948718" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1080/07900629948718</a>
Cevikbas, M., Okudan, O., & IŞıK, Z. (2024). Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. <em>Engineering. Construction and Architectural Management, 31</em>, pp. 1-27. doi: <a href="https://doi.org/10.1108/ECAM-05-2022-0470" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1108/ECAM-05-2022-0470</a>
Chaitongrat, T., Liwthaisong, S., Aksorn, P., Kusonkhum, W., & Leungbootnak, N. (2021). Causal relationship model of problems in public sector procurement. <em>Geomate Journal, 20</em>, pp. 52-58. doi: <a href="https://doi.org/10.21660/2021.80.6266" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.21660/2021.80.6266</a>
Ehrlinger, L., & Wöß, W. (2022). A survey of data quality measurement and monitoring tools. <em>Frontiers in Big Data, 5</em>, p. 850611. doi: <a href="https://doi.org/10.3389/fdata.2022.850611" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3389/fdata.2022.850611</a>
Ekung, S., Lashinde, A., & Adu, E. (2021). Critical risks to construction cost estimation. <em>Journal of Engineering, Project & Production Management, 11</em>, pp. 19-29. doi: <a href="https://doi.org/10.2478/jeppm-2021-0003" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.2478/jeppm-2021-0003</a>
Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. <em>International Journal of Project Management, 21</em>, pp. 321-326. doi: <a href="https://doi.org/10.1016/S0263-7863(02)00055-8" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/S0263-7863(02)00055-8</a>
Gajera, R. (2024). Enhancing risk management in construction projects: Integrating Monte Carlo simulation with Primavera risk analysis and PowerBI dashboards. <em>Bulletin of Pure and Applied Sciences-Zoology, 43B</em>(2S), pp. 1407-1418.
Ghorbani, A. (2023). A review of successful construction project managers’ competencies and leadership profile. <em>Journal of Rehabilitation in Civil Engineering, 11</em>, pp. 76-95. doi: <a href="https://doi.org/10.22075/JRCE.2022.24638.1560" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.22075/JRCE.2022.24638.1560</a>
Haupt, T. C., & Padayachee, K. (2016). Financial Management capacity and business failure of contractors. In: <em>10th Building ASOCSA Environment Conference</em>, Porth Elizabeth, South Africa, July, 2016, pp. 213-226.
Hollmann, J. K. (2006). <em>Total Cost Management Framework: An Integrated Approach to Portfolio, Program, and Project Management</em>. AACE International, Morgantown, West Virginia, USA.
Jaffar, N., Tharim, A. A., & Shuib, M. (2011). Factors of conflict in construction industry: A literature review. <em>Procedia Engineering, 20</em>, pp. 193-202. doi: <a href="https://doi.org/10.1016/j.proeng.2011.11.156" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.proeng.2011.11.156</a>
Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. <em>International Journal of Project Management, 27</em>, pp. 522-531. doi: <a href="https://doi.org/10.1016/j.ijproman.2008.07.003" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.ijproman.2008.07.003</a>
Kamal, A., Abas, M., Khan, D., & Azfar, R. W. (2022). Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. <em>International Journal of Construction Management, 22</em>, pp. 1141-1157. doi: <a href="https://doi.org/10.1080/15623599.2019.1683693" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1080/15623599.2019.1683693</a>
Kilag, O. K. T., Largo, J. M., Rabillas, A. R., Kilag, F. E., Angtud, M. K. A., Book, J. F. P., et al. (2024). Administrators’ conflict management and strategies. <em>Journal of Higher Education and Academic Advancement, 1</em>, pp. 22-31. doi: <a href="https://doi.org/10.61796/ejheaa.v1i2.98" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.61796/ejheaa.v1i2.98</a>
Koç, C. (2011). A study on construction costs per unit area of irrigation projects. <em>Irrigation and Drainage Systems, 25</em>, pp. 255-263. doi: <a href="https://doi.org/10.1007/s10795-011-9120-3" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1007/s10795-011-9120-3</a>
Kusonkhum, W., Srinavin, K., & Chaitongrat, T. (2023). The adoption of a big data approach using machine learning to predict bidding behavior in procurement management for a construction project. <em>Sustainability, 15</em>, p. 12836. doi: <a href="https://doi.org/10.3390/su151712836" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3390/su151712836</a>
Lytvyn, N. (2017). Evaluation of the company’s personnel on the basis of construction models of competences. <em>Regional Aspects of Productive Forces Development of Ukraine</em>. Publishing and Printing Center "Universitska Dumka", str. Lvivska, 11, Ternopil, Ukraine, tel. (0352) 47 58 72, West Ukrainian National University. pp. 125-131.
McDermot, E., Agdas, D., Rodríguez Díaz, C. R., Rose, T., & Forcael, E. (2022). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study. <em>International Journal of Construction Management, 22</em>, pp. 2469-2483. doi: <a href="https://doi.org/10.1080/15623599.2020.1797985" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1080/15623599.2020.1797985</a>
Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. <em>International Journal of Project Management, 20</em>, pp. 67-73. doi: <a href="https://doi.org/10.1016/S0263-7863(00)00037-5" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/S0263-7863(00)00037-5</a>
Osei-Asibey, D., Ayarkwa, J., Adinyira, E., Acheampong, A., & Amoah, P. (2021). Roles and responsibilities of stakeholders towards ensuring health and safety at construction site. <em>Journal of Building Construction and Planning Research, 9</em>, pp. 90-114. doi: <a href="https://doi.org/10.4236/jbcpr.2021.91008" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.4236/jbcpr.2021.91008</a>
Peterzens-Nysten, T. (1998). Protection of discovered antiquities in Finland. <em>Art Antiquity & Law, 3</em>, Master of Science Thesis, Master of Science in Construction Management Institution: School of Science and Engineering, Reykjavík University. p. 355.
PMI, A. (2013). <em>A Guide to the Project Management Body of Knowledge (PMBOK® Guide)</em>, 5th edn. Project Management Institute, Newtown Square, Pennsylvania, USA.
Ramaswamy, B. (2013). Groundwater modeling to assist in designing a dewatering system for the protection of Egyptian antiquities. In: <em>2013 NGWA Summit – The National and International Conference on Groundwater</em>, NGWA.
San, L. Y. (2013). A study of causes and effects of conflict in construction industry. Un-published Bachelor Degree Dissertation, Bachelor of Project Management, Faculty of Technology, University Malaysia Pahang, Malaysia.
Saram, D. D. D., & Ahmed, S. M. (2001). Construction coordination activities: What is important and what consumes time. <em>Journal of Management in Engineering, 17</em>, pp. 202-213. doi: <a href="https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(202)" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1061/(ASCE)0742-597X(2001)17:4(202)</a>
Shibani, A., Hasan, D., Saaifan, J., Sabboubeh, H., Eltaip, M., Saidani, M., et al. (2024). Financial risk management in the construction projects. <em>Journal of King Saud University-Engineering Sciences, 36</em>, pp. 552-561. doi: <a href="https://doi.org/10.1016/j.jksues.2022.05.001" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.jksues.2022.05.001</a>
Shubham, V. (2013). Causes of delay in project construction in developing countries. <em>Indian Journal of Commerce & Management Studies ISSN, 2240</em>, p. 310.
Srinavin, K., Kusonkhum, W., Chonpitakwong, B., Chaitongrat, T., Leungbootnak, N., & Charnwasununth, P. (2021). Readiness applying big data technology for construction management in Thai public sector. <em>Journal of Advances in Information, 12</em>, pp. 1-5. doi: <a href="https://doi.org/10.12720/jait.12.1.1-5." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.12720/jait.12.1.1-5.</a>
Suárez, D., Díaz-Puente, J. M., & Bettoni, M. (2021). Risks identification and management related to rural innovation projects through social networks analysis: A case study in Spain. <em>Land, 10</em>, p. 613. doi: <a href="https://doi.org/10.3390/land10060613" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3390/land10060613</a>
Tam, C. M., Zeng, S., & Deng, Z. (2004). Identifying elements of poor construction safety management in China. <em>Safety Science, 42</em>, pp. 569-586. doi: <a href="https://doi.org/10.1016/j.ssci.2003.09.001" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.ssci.2003.09.001</a>
Taylor, S., & Littleton, K. (2008). Art work or money: Conflicts in the construction of a creative identity. <em>The Sociological Review, 56</em>, pp. 275-292. doi: <a href="https://doi.org/10.1111/j.1467-954X.2008.00788.x" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1111/j.1467-954X.2008.00788.x</a>
Thorndike, R. L. (1936). Factor analysis of social and abstract intelligence. <em>Journal of Educational Psychology, 27</em>, p. 231. doi: <a href="https://doi.org/10.1037/h0059840" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1037/h0059840</a>