Have a personal or library account? Click to login
The structural equation model of risk factors influencing government irrigation project Cover

The structural equation model of risk factors influencing government irrigation project

Open Access
|Aug 2025

References

  1. Abdaljader, A., & Günal, M. (2024). Main risk factors causing delays in GAP construction projects in turkey by using relative importance index (RII) method. Iranian Journal of Science and Technology, Transactions of Civil Engineering, 48, pp. 611-633. doi: 10.1007/s40996-023-01207-6
  2. Abowitz, D. A., & Toole, T. M. (2010). Mixed method research: Fundamental issues of design, validity, and reliability in construction research. Journal of Construction Engineering and Management, 136, pp. 108-116. doi: 10.1061/(ASCE)CO.1943-7862.0000026
  3. Adedokun, O., & Egbelakin, T. (2024). Structural equation modelling of risk factors influencing the success of building projects. Journal of Facilities Management, 22, pp. 64-90. doi: 10.1108/JFM-01-2022-0002
  4. Ajayi, O., Thwala, W., Okanlawon, S., & Odunjo, O. (2015). Assessment of the impact of musculoskeletal disorders on Nigerian construction workers. Industrial Management & Data Systems, 3, pp. 69-84.
  5. Al Shami, K. (2018). Investigating the use of building information modeling (BIM) in managing construction claims. PM World Journal, 7, pp. 1-17.
  6. Amarasekara, W., Perera, B., & Rodrigo, M. (2018). Impact of differing site conditions on construction projects. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 10, p. 04518006. doi: 10.1061/(ASCE)LA.1943-4170.0000257
  7. Assaf, S. A., & Al-Hejji, S. (2006). Causes of delay in large construction projects. International Journal of Project Management, 24, pp. 349-357. doi: 10.1016/j. ijproman.2005.11.010
  8. Bahamid, R., Doh, S., Al-Sharafi, M., & Rahimi, A. (2020). Risk factors influencing the construction projects in Yemen from expert’s perspective. In: IOP Conference Series: Materials Science and Engineering, 2020. IOP Publishing, 012007.
  9. Briscoe, J. (1999). The financing of hydropower, irrigation and water supply infrastructure in developing countries. International Journal of Water Resources Development, 15, pp. 459-491. doi: 10.1080/07900629948718
  10. Burke, R. (2013). Project Management: Planning and Control Techniques. John Wiley & Sons, Chichester, United Kingdom.
  11. Burrows, G. L. (1953). Cochran. Sampling Techniques (Book Review). Social Forces, 32, p. 304. doi: 10.2307/2573260
  12. Cevikbas, M., Okudan, O., & IŞıK, Z. (2024). Identification and assessment of disruption claim management risks in construction projects: A life cycle-based approach. Engineering. Construction and Architectural Management, 31, pp. 1-27. doi: 10.1108/ECAM-05-2022-0470
  13. Chaitongrat, T., Liwthaisong, S., Aksorn, P., Kusonkhum, W., & Leungbootnak, N. (2021). Causal relationship model of problems in public sector procurement. Geomate Journal, 20, pp. 52-58. doi: 10.21660/2021.80.6266
  14. Ehrlinger, L., & Wöß, W. (2022). A survey of data quality measurement and monitoring tools. Frontiers in Big Data, 5, p. 850611. doi: 10.3389/fdata.2022.850611
  15. Ekung, S., Lashinde, A., & Adu, E. (2021). Critical risks to construction cost estimation. Journal of Engineering, Project & Production Management, 11, pp. 19-29. doi: 10.2478/jeppm-2021-0003
  16. Frimpong, Y., Oluwoye, J., & Crawford, L. (2003). Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. International Journal of Project Management, 21, pp. 321-326. doi: 10.1016/S0263-7863(02)00055-8
  17. Gajera, R. (2024). Enhancing risk management in construction projects: Integrating Monte Carlo simulation with Primavera risk analysis and PowerBI dashboards. Bulletin of Pure and Applied Sciences-Zoology, 43B(2S), pp. 1407-1418.
  18. Ghorbani, A. (2023). A review of successful construction project managers’ competencies and leadership profile. Journal of Rehabilitation in Civil Engineering, 11, pp. 76-95. doi: 10.22075/JRCE.2022.24638.1560
  19. Haupt, T. C., & Padayachee, K. (2016). Financial Management capacity and business failure of contractors. In: 10th Building ASOCSA Environment Conference, Porth Elizabeth, South Africa, July, 2016, pp. 213-226.
  20. Hollmann, J. K. (2006). Total Cost Management Framework: An Integrated Approach to Portfolio, Program, and Project Management. AACE International, Morgantown, West Virginia, USA.
  21. Jaffar, N., Tharim, A. A., & Shuib, M. (2011). Factors of conflict in construction industry: A literature review. Procedia Engineering, 20, pp. 193-202. doi: 10.1016/j.proeng.2011.11.156
  22. Kaliba, C., Muya, M., & Mumba, K. (2009). Cost escalation and schedule delays in road construction projects in Zambia. International Journal of Project Management, 27, pp. 522-531. doi: 10.1016/j.ijproman.2008.07.003
  23. Kamal, A., Abas, M., Khan, D., & Azfar, R. W. (2022). Risk factors influencing the building projects in Pakistan: From perspective of contractors, clients and consultants. International Journal of Construction Management, 22, pp. 1141-1157. doi: 10.1080/15623599.2019.1683693
  24. Kangpheng, S., Gunlong, S., & Kaewin, D. (2016). Mixed Methods: Paradigms of Research for the 21st Century. Apichat, Khon Kaen.
  25. Kilag, O. K. T., Largo, J. M., Rabillas, A. R., Kilag, F. E., Angtud, M. K. A., Book, J. F. P., et al. (2024). Administrators’ conflict management and strategies. Journal of Higher Education and Academic Advancement, 1, pp. 22-31. doi: 10.61796/ejheaa.v1i2.98
  26. Koç, C. (2011). A study on construction costs per unit area of irrigation projects. Irrigation and Drainage Systems, 25, pp. 255-263. doi: 10.1007/s10795-011-9120-3
  27. Kusonkhum, W., Srinavin, K., & Chaitongrat, T. (2023). The adoption of a big data approach using machine learning to predict bidding behavior in procurement management for a construction project. Sustainability, 15, p. 12836. doi: 10.3390/su151712836
  28. Lester, A. (2007). Project Management, Planning and Control. Butterworth-Heinemann, Burlington.
  29. Lytvyn, N. (2017). Evaluation of the company’s personnel on the basis of construction models of competences. Regional Aspects of Productive Forces Development of Ukraine. Publishing and Printing Center "Universitska Dumka", str. Lvivska, 11, Ternopil, Ukraine, tel. (0352) 47 58 72, West Ukrainian National University. pp. 125-131.
  30. McDermot, E., Agdas, D., Rodríguez Díaz, C. R., Rose, T., & Forcael, E. (2022). Improving performance of infrastructure projects in developing countries: An Ecuadorian case study. International Journal of Construction Management, 22, pp. 2469-2483. doi: 10.1080/15623599.2020.1797985
  31. Odeh, A. M., & Battaineh, H. T. (2002). Causes of construction delay: Traditional contracts. International Journal of Project Management, 20, pp. 67-73. doi: 10.1016/S0263-7863(00)00037-5
  32. Osei-Asibey, D., Ayarkwa, J., Adinyira, E., Acheampong, A., & Amoah, P. (2021). Roles and responsibilities of stakeholders towards ensuring health and safety at construction site. Journal of Building Construction and Planning Research, 9, pp. 90-114. doi: 10.4236/jbcpr.2021.91008
  33. Ostle, B. (1963). Statistics in Research, 2nd edn. TheTowa State University Press, Ames.
  34. Pallant, J. (2020). SPSS Survival Manual: A Step by Step Guide to Data Analysis Using IBM SPSS. Routledge, London, United Kingdom.
  35. Peterzens-Nysten, T. (1998). Protection of discovered antiquities in Finland. Art Antiquity & Law, 3, Master of Science Thesis, Master of Science in Construction Management Institution: School of Science and Engineering, Reykjavík University. p. 355.
  36. Pétursson, B. K. (2015). Disputes and conflicts within construction contracts in the Icelandic construction industry.
  37. PMI, A. (2013). A Guide to the Project Management Body of Knowledge (PMBOK® Guide), 5th edn. Project Management Institute, Newtown Square, Pennsylvania, USA.
  38. Ramaswamy, B. (2013). Groundwater modeling to assist in designing a dewatering system for the protection of Egyptian antiquities. In: 2013 NGWA Summit – The National and International Conference on Groundwater, NGWA.
  39. San, L. Y. (2013). A study of causes and effects of conflict in construction industry. Un-published Bachelor Degree Dissertation, Bachelor of Project Management, Faculty of Technology, University Malaysia Pahang, Malaysia.
  40. Saram, D. D. D., & Ahmed, S. M. (2001). Construction coordination activities: What is important and what consumes time. Journal of Management in Engineering, 17, pp. 202-213. doi: 10.1061/(ASCE)0742-597X(2001)17:4(202)
  41. Shibani, A., Hasan, D., Saaifan, J., Sabboubeh, H., Eltaip, M., Saidani, M., et al. (2024). Financial risk management in the construction projects. Journal of King Saud University-Engineering Sciences, 36, pp. 552-561. doi: 10.1016/j.jksues.2022.05.001
  42. Shubham, V. (2013). Causes of delay in project construction in developing countries. Indian Journal of Commerce & Management Studies ISSN, 2240, p. 310.
  43. Srinavin, K., Kusonkhum, W., Chonpitakwong, B., Chaitongrat, T., Leungbootnak, N., & Charnwasununth, P. (2021). Readiness applying big data technology for construction management in Thai public sector. Journal of Advances in Information, 12, pp. 1-5. doi: 10.12720/jait.12.1.1-5.
  44. Suárez, D., Díaz-Puente, J. M., & Bettoni, M. (2021). Risks identification and management related to rural innovation projects through social networks analysis: A case study in Spain. Land, 10, p. 613. doi: 10.3390/land10060613
  45. Tam, C. M., Zeng, S., & Deng, Z. (2004). Identifying elements of poor construction safety management in China. Safety Science, 42, pp. 569-586. doi: 10.1016/j.ssci.2003.09.001
  46. Taylor, S., & Littleton, K. (2008). Art work or money: Conflicts in the construction of a creative identity. The Sociological Review, 56, pp. 275-292. doi: 10.1111/j.1467-954X.2008.00788.x
  47. The Government Procurement and Supplies Management Act (2017). The Comptroller General’s Department, Bangkok.
  48. Thorndike, R. L. (1936). Factor analysis of social and abstract intelligence. Journal of Educational Psychology, 27, p. 231. doi: 10.1037/h0059840
  49. Vorakitkasemsakul, S. (2011). Applied Statistics for Behavioral and Social Science Research. Aksonsin, Udon Thani.
DOI: https://doi.org/10.2478/otmcj-2025-0010 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 154 - 170
Submitted on: Aug 28, 2024
Accepted on: Mar 6, 2025
Published on: Aug 12, 2025
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2025 Anuchat Leeanansaksiri, Phongphan Tankasem, Wuttipong Kusonkhum, published by University of Zagreb
This work is licensed under the Creative Commons Attribution 4.0 License.