Integrated Multi-Criteria Optimization of Road Traffic Noise Cover

Integrated Multi-Criteria Optimization of Road Traffic Noise

Open Access
|Sep 2026
Read online

Figures & tables

Figure 1:

Spatial configuration of the R2 expressway segment Pravotice–Dolné Vestenice. Source: Author’s processing based on spatial data from the Office of Geodesy, Cartography and Cadastre of the Slovak Republic (ÚGKK SR, 2023)

Figure 2:

Location of monitoring points in the Brezolupy–Jerichov section. Source: Author’s processing, field survey (2004), and ÚGKK SR (2023) spatial base map

Figure 3:

Location of monitoring point in the Hradište section. Source: Author’s processing, field survey (2004), and ÚGKK SR (2023) spatial base map

Figure 3:

Location of monitoring point in the Dolné Vestenice section. Source: Author’s processing, field survey (2004), and ÚGKK SR (2023) spatial base map

Table 1:

Calculated A-weighted Equivalent Continuous Sound Levels (LAeq) for R2 Road Sections in the Year 2036, by Critical Locations

Barrier TypePointDistance from R2 [m]LAeq Day [dB(A)]LAeq Night [dB(A)]
Brezolupy – JerichovP122540.135.5
P212749.344.7
P314747.143.5
HradišteP117747.342.3
Dolné VesteniceP151546.841.8
Horné VesteniceP115351.746.6
P217246.841.8

[i] Source: Authors’ own calculations based on VÚVA, 1991, 1996; Liberko, 2005; Ministry of Health of the Slovak Republic, 2007.

Table 2:

Acoustic Performance Parameters of Noise Barriers

Barrier TypeAbsorption Coefficient α [-]Airborne Sound Insulation DLR [dB]Absorption Loss DLα [dB]
Concrete0.10383
Aluminum0.30408
Recycled Plastic0.25367
Wood-Cement Composite0.20305

[i] Source: Slovak Institute of Technical Standardization, 2018; GEOCONSULT DÚR documentation; authors’ calculations.

Table 3:

Comparative Life-Cycle Cost Assessment of NB Type 1 by Infill Material (10-year horizon)

Infill MaterialConstruction Cost [€]Maintenance Cost [€]Total Life-Cycle Cost (TLC) [€]
Concrete884,847.8859,592.00944,439.88
Aluminum570,133.47112,320.00682,453.47
Recycled Plastic842,996.9839,811.20882,808.18
Wood-Cement Composite1,023,914.0859,280.001,083,194.08

[i] Source: GEOCONSULT DÚR documentation; Müller et al., 2019; Ministry of Transport of the Slovak Republic, 2021; authors’ calculations based on CENKROS software.

Table 4:

Comparative Life-Cycle Cost Assessment of NB Type 2 by Infill Material (10-year horizon)

Infill MaterialConstruction Cost [€]Maintenance Cost [€]Total Life-Cycle Cost (TLC) [€]
Concrete588,323.8239,728.00628,051.82
Aluminum377,102.0474,880.00451,982.04
Recycled Plastic553,463.5926,540.80580,004.39
Wood-Cement Composite681,658.6439,520.00721,178.64

[i] Source: GEOCONSULT DÚR documentation; Müller et al., 2019; Ministry of Transport of the Slovak Republic, 2021; authors’ calculations based on CENKROS software.

Figure 6:

Visualisation of the noise barrier. Source: Authors’ own rendering based on GEOCONSULT DÚR project documentation

DOI: https://doi.org/10.2478/cee-2026-0062 | Journal eISSN: 2199-6512 (formerly 1336-5835) | Journal ISSN: 1336-5835
Language: English
Page range: 1050 - 1063
Submitted on: Sep 1, 2025
Accepted on: Dec 8, 2025
Published on: Sep 25, 2026
Published by: University of Žilina
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2026 Mária Trojanová, Monika Beňová, published by University of Žilina
This work is licensed under the Creative Commons Attribution 4.0 License.