Figure 1:
Spatial configuration of the R2 expressway segment Pravotice–Dolné Vestenice. Source: Author’s processing based on spatial data from the Office of Geodesy, Cartography and Cadastre of the Slovak Republic (ÚGKK SR, 2023)

Figure 2:
Location of monitoring points in the Brezolupy–Jerichov section. Source: Author’s processing, field survey (2004), and ÚGKK SR (2023) spatial base map

Figure 3:
Location of monitoring point in the Hradište section. Source: Author’s processing, field survey (2004), and ÚGKK SR (2023) spatial base map

Figure 3:
Location of monitoring point in the Dolné Vestenice section. Source: Author’s processing, field survey (2004), and ÚGKK SR (2023) spatial base map
Table 1:
Calculated A-weighted Equivalent Continuous Sound Levels (LAeq) for R2 Road Sections in the Year 2036, by Critical Locations
| Barrier Type | Point | Distance from R2 [m] | LAeq Day [dB(A)] | LAeq Night [dB(A)] |
|---|---|---|---|---|
| Brezolupy – Jerichov | P1 | 225 | 40.1 | 35.5 |
| P2 | 127 | 49.3 | 44.7 | |
| P3 | 147 | 47.1 | 43.5 | |
| Hradište | P1 | 177 | 47.3 | 42.3 |
| Dolné Vestenice | P1 | 515 | 46.8 | 41.8 |
| Horné Vestenice | P1 | 153 | 51.7 | 46.6 |
| P2 | 172 | 46.8 | 41.8 |
[i] Source: Authors’ own calculations based on VÚVA, 1991, 1996; Liberko, 2005; Ministry of Health of the Slovak Republic, 2007.
Table 2:
Acoustic Performance Parameters of Noise Barriers
| Barrier Type | Absorption Coefficient α [-] | Airborne Sound Insulation DLR [dB] | Absorption Loss DLα [dB] |
|---|---|---|---|
| Concrete | 0.10 | 38 | 3 |
| Aluminum | 0.30 | 40 | 8 |
| Recycled Plastic | 0.25 | 36 | 7 |
| Wood-Cement Composite | 0.20 | 30 | 5 |
[i] Source: Slovak Institute of Technical Standardization, 2018; GEOCONSULT DÚR documentation; authors’ calculations.
Table 3:
Comparative Life-Cycle Cost Assessment of NB Type 1 by Infill Material (10-year horizon)
| Infill Material | Construction Cost [€] | Maintenance Cost [€] | Total Life-Cycle Cost (TLC) [€] |
|---|---|---|---|
| Concrete | 884,847.88 | 59,592.00 | 944,439.88 |
| Aluminum | 570,133.47 | 112,320.00 | 682,453.47 |
| Recycled Plastic | 842,996.98 | 39,811.20 | 882,808.18 |
| Wood-Cement Composite | 1,023,914.08 | 59,280.00 | 1,083,194.08 |
[i] Source: GEOCONSULT DÚR documentation; Müller et al., 2019; Ministry of Transport of the Slovak Republic, 2021; authors’ calculations based on CENKROS software.
Table 4:
Comparative Life-Cycle Cost Assessment of NB Type 2 by Infill Material (10-year horizon)
| Infill Material | Construction Cost [€] | Maintenance Cost [€] | Total Life-Cycle Cost (TLC) [€] |
|---|---|---|---|
| Concrete | 588,323.82 | 39,728.00 | 628,051.82 |
| Aluminum | 377,102.04 | 74,880.00 | 451,982.04 |
| Recycled Plastic | 553,463.59 | 26,540.80 | 580,004.39 |
| Wood-Cement Composite | 681,658.64 | 39,520.00 | 721,178.64 |
[i] Source: GEOCONSULT DÚR documentation; Müller et al., 2019; Ministry of Transport of the Slovak Republic, 2021; authors’ calculations based on CENKROS software.

Figure 6:
Visualisation of the noise barrier. Source: Authors’ own rendering based on GEOCONSULT DÚR project documentation