References
- [1] Hrvoje Pozar Energy Institute: Techno-economic aspects of voltage regulation as ancillary (system) services - identification and remediation of unauthorized voltages on the transmission network of B&H, Zagreb, May 2012
- [2] The SINCRO.GRID project - Phase 1 responds to the challenges of the electricity transmission network in Slovenia and Croatia, May 2017, https://www.sincrogrid.eu/
- [3] ISOB&H, study “Influence of the compensatory mode of operation of the pumping hydropower plant Capljina on the voltage conditions in the power system of Bosnia and Herzegovina”, Sarajevo, December 2020
- [4] ISOB&H, “Network Code”, Sarajevo, January 2019
- [5] WB17-REG-ENE-01, „Regional Feasibility Study for Voltage Profile Improvement“, Programme for Albania, Bosnia and Herzegovina, North Macedonia, Kosovo, Montenegro, and Serbia, December 2020
- [6] S. Hadzic, H. Ferizovic, B. Zecevic, A. Muharemovic, N. Janjic: Analysis of voltage conditions on the transmission network of the power system of Bosnia and Herzegovina, 15. BH K CIGRE Conference, Neum,. October 17-20. 2021
- [7] ISOB&H, study “Identification of impermissible voltages on the transmission network of B&H”, Sarajevo, X 2010
- [8] Z. Bajramovic, S. Hadzic, M. Veledar, O. Hadzic: The Appearance of the Power Frequency Overvoltage in the Transmission Network, 8th International Conference -Workshop Compatibility and Power Electronics (CPE 2013), Ljubljana, Slovenia, June 5 – 7. 201310.1109/CPE.2013.6601124
- [9] PSS/E, PSS/E (Power System Simulator Siemens Energy, Inc, Power Technologies International)