References
- Neostrain, SHM Application “Inspector”.
- Biliszczuk, J., Onysyk, J., Barcik, W., Prabucki, P., Sułkowski, M., szczepański, J., Toczkiewicz, R., Tomiczek, M., Tukendorf, A., Tukendorf, K., AST A. (2011). Rędziński Bridge along the Wrocław Ringroad. Wrocław Bridge Days, Wrocław 24th–25th November 2011, Wrocław: DWE, 203–222.
- Hawryszków, P., Hildebrand, M. (2012). Installation of the largest stay cable system in Poland – the Rędziński bridge in Wrocław. Proceeding of the 18th IABSE Congress “Innovative Infrastructures – Toward Human Urbanism”. Seoul, Korea.
- Barcik, W., Sieńko, R., Biliszczuk, J. (2011). SHM System of the Rędziński Bridge in Wrocław, Wrocław Bridge Days, Wrocław 24th–25th November 2011, Wrocław: DWE.
- Biliszczuk, J., Onysyk J., Teichgraeber, M. (2016). Data analysis of the SHM System of the Rędziński Bridge. 1st Rapport from the period August 2011 – January 2016, Wrocław.
- Neostrain, Instruction of the SHM Application for the bridge along the Wrocław Ringroad.