Have a personal or library account? Click to login
Optimization of Construction Schedules with the Assumed Multi-Tasking of Working Brigades Cover

Optimization of Construction Schedules with the Assumed Multi-Tasking of Working Brigades

Open Access
|May 2020

References

  1. [1] Biruk S., Jaśkowski P., Scheduling construction of multi-object projects: problem of works continuity in consecutive units, Zeszyty Naukowe WSOWL, 3 (157), 2010, 340–349.
  2. [2] Hejducki Z., Scheduling Model of Construction Activity with Time Couplings, Journal of Civil Engineering and Management, 9:4, 2003, 284–291.10.1080/13923730.2003.10531341
  3. [3] Krzemiński M., Use of the KASS Program in Scheduling, Technical Transaction, 2-B(6), 2014, 217–224.
  4. [4] Marcinkowski R., Metody rozdziału zasobów realizatora w działalności inżynieryjno - budowlanej, WAT, Warszawa 2002.
  5. [5] Pinedo M.L., Scheduling: Theory, Algorithms, and Systems, Springer, 2012.10.1007/978-1-4614-2361-4
  6. [6] Rogalska M., Bożejko W., Hejducki Z., Time/Cost Optimization Using Hybrid Evolutionary Algorithm in Construction Project Scheduling, Automotion in Construction, 18, 2008, 24–31.10.1016/j.autcon.2008.04.002
DOI: https://doi.org/10.4467/2353737XCT.17.133.6884 | Journal eISSN: 2353-737X | Journal ISSN: 0011-4561
Language: English
Page range: 109 - 118
Published on: May 26, 2020
Published by: Cracow University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2020 Michał Krzemiński, published by Cracow University of Technology
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.