Have a personal or library account? Click to login
Influence, of time randomness execution of work, on lenght of the construction cycle Cover

Influence, of time randomness execution of work, on lenght of the construction cycle

Open Access
|May 2020

References

  1. [1] Cho C., Shin Y., Park J., Lee. Y., Cho M., Lifting load calculation method of computing simulation for super-tall building construction, The 29th International Symposium of Automation and Robotics in Construction, Eindhoven, Netherlands 2012.10.4017/gt.2012.11.02.396.00
  2. [2] Belniak S. et al., Zastosowanie metod matematycznych w wybranych problemach zarządzania w budownictwie, Wydawnictwo Politechniki Krakowskiej, Kraków 2015.
  3. [3] Dyżewski A., Doktryna pracy równomiernej w realizacji budowlanej, PWG, Warszawa 1949.
  4. [4] International Standard ISO 10005: 2005. Quality management systems – Guidelines for quality plans.
  5. [5] Jaworski K., Metodologia projektowania realizacji budowy, Państwowe Wydawnictwo Naukowe PWN, Warszawa 2009.
  6. [6] Kenzo K., Nobuyuki N., Efficient Monte Carlo simulation method of GERT-type network for project management, Elsevier, Computers & Industrial Engineering, V. 42, I. 2–4, P. 521–531, New York 2002.10.1016/S0360-8352(02)00050-5
  7. [7] Mrozowicz J., Metody potokowe organizacji procesów budowlanych o charakterze deter-ministycznym, Prace Naukowe Instytutu Budownictwa PWr, nr 32, Monografie, nr 14, Wydawnictwo PWr, Wrocław 1982.
  8. [8] Pritchard C., Risk Management: Concepts and Guidance, Fourth Edition, ESI, 2010.10.1201/9781439842201
  9. [9] Shtub A., Bard J., Shlomo G., Project Management. Engineering, Technology, and Implementation, Prentice Hall, Englewood Cliffs, New Jersey 1994.
  10. [10] Wątorski J., Organizacja i mechanizacja budowy, Cz. III, PWN, Kraków–Warszawa–Łódź 1965.
  11. [11] Więckowski A., Principles of the NNM method applied in the analysis of process realisation, Automation in Construction, Elsevier Science BV, Amsterdam–London–New York–Paris–Shannon–Tokyo 2002, vol. 11/4, 409–420.10.1016/S0926-5805(01)00073-5
  12. [12] A. Więckowski, Time reserves in the realizations of building, Creative Construction Conference, Krakow 2015, Poland, 482–492.
  13. [13] http://opolskabusinesspark.pl/
DOI: https://doi.org/10.4467/2353737XCT.17.036.6347 | Journal eISSN: 2353-737X | Journal ISSN: 0011-4561
Language: English
Page range: 115 - 123
Published on: May 23, 2020
Published by: Cracow University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2020 Andrzej Więckowski, published by Cracow University of Technology
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.