Have a personal or library account? Click to login
Influence, of time randomness execution of work, on lenght of the construction cycle Cover

Influence, of time randomness execution of work, on lenght of the construction cycle

Open Access
|May 2020

Abstract

The objective of this paper is to analyse the time reserves in scheduling periods for conducting processes that ensure construction deadlines can be met. By using the probability account and numerical analyses methods, including ‘Monte Carlo’, execution cycles have been analysed, as well as summary stoppage times for executing teams and working areas. On the basis of calculations made using data from studies made during the construction office building in Krakow it was stated that in order to keep to the planned deadline, must be smaller periods of performance of works by individual brigades, an average of 0,103 times of rhythm.

DOI: https://doi.org/10.4467/2353737XCT.17.036.6347 | Journal eISSN: 2353-737X | Journal ISSN: 0011-4561
Language: English
Page range: 115 - 123
Published on: May 23, 2020
Published by: Cracow University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2020 Andrzej Więckowski, published by Cracow University of Technology
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.