Have a personal or library account? Click to login

Risk management analysis in construction enterprises in selected regions in Poland

Open Access
|Jul 2020

References

  1. Babar, S., Thaheem, J.M., Ayub, B. (2017). Estimated cost at completion: Integrating risk into earned value management. Journal of Construction Engineering and Management, 143(3). https://doi.org/10.1061/(ASCE)CO.1943-7862.000124510.1061/(ASCE)CO.1943-7862.0001245
  2. Bizon-Górecka, J. (1999). Problemy zarządzania ryzykiem w produkcji budowlanej (komunikat z badań). Organizacja i Kierowanie, 1, 49–54.
  3. Bizon-Górecka, J., Górecki, J. (2013). Ryzyko budowlanego projektu inwestycyjnego w perspektywie kosztów budowy. Przegląd Organizacji, 6, 36–44.10.33141/po.2013.06.07
  4. Boothroyd, C., Emmett, J. (1996). Risk Management: A practical guide for construction professionals. London: Witherby & Co.
  5. Bunni, G.N. (2003). Risk and insurance in construction. London – New York: Spon Press.10.4324/9780203476543
  6. Burtonshaw-Gunn, S.A. (2009). Risk and financial management in construction. Farnham: Gower Publishing.
  7. Cristóbal, C.R.J. (2009). Time, cost, and quality in a road building project. Journal of Construction Engineering and Management, 135(11), 1271–1274.10.1061/(ASCE)CO.1943-7862.0000094
  8. Dziadosz, A., Kapliński, O., Tomczyk, A., Rejment, M. (2016). Analiza i ocena ryzyka finansowego w przedsięwzięciach budowlanych. Materiały Budowlane, 8, 112–113.10.15199/33.2016.08.34
  9. Dziadosz, A., Rejment, M. (2015). Risk analysis in construction project – chosen methods. Procedia Engineering, 122, 258–265.10.1016/j.proeng.2015.10.034
  10. Flanagan, R., Norman, G. (1993). Risk management in construction. Oxford: Blackwell Publishing.
  11. Glavinich, E.T. (2008). Contractor’s Guide to Greek Building Construction: Management, Project delivery, documentation and risk reduction. Hoboken: John Wiley & Sons.10.1002/9780470259979
  12. Hatem, J.D. (1998). Subsurface conditions: Risk Management for Design and Construction Management Professionals. New York: John Wiley & Sons.
  13. Hickman, R.A. (2002). Design-Build Risk and Insurance. Dallas: International Risk Management Institute.
  14. Holland, K.J. (2006). Construction Law & Risk Management. Vienna: Ardent Publications.
  15. Hyari, H.K., Shatarat, N., Khalafallah, A. (2017). Handling Risks of Quality Variations in Unit-Price Contracts. Journal of Construction Engineering and Management, 143(10). https://doi.org./10.1061/(ASCE)CO.1943-7862.000139310.1061/(ASCE)CO.1943-7862.0001393
  16. Kaczorek, K. (2017). An overview of selected methods for the identification and qualitative assessment of risk factors. Czasopismo Techniczne, 10, 103–111.
  17. Kasprowicz, T. (2017). Quantitative identification of construction risk. Archive of Civil Engineering, LXIII(1), 63–72.10.1515/ace-2017-0005
  18. Kosecki, A., Madyda, A. (1996). Kierowanie ryzykiem w przedsiębiorstwie budowlanym. In Technologia w budownictwie – teoria i praktyka (pp. 76–84). Wrocław: Instytut Budownictwa Politechniki Wrocławskiej, Towarzystwo Naukowe Inżynierii Procesów Budowlanych.
  19. Kosmalski, S., Myrczek, J. (2019). Risk factors in a process of gas pipeline construction. In MATEC Web of Conferences (pp. 1–8). Paris.10.1051/matecconf/201926207006
  20. Kowalczyk, Z. (2001). Podział i przenoszenie ryzyka w umowach budowlanych. Inżynieria i Budownictwo, 6, 360–361.
  21. Liu, J., Low, P.S., Zhang, Q. (2017). Enterprise risk management practices of top ENR international contractors. International Journal of Construction Management, 22(3). https://doi.org/10.1080/15623599.2017.132629910.1080/15623599.2017.1326299
  22. Marcinkowski, R., Koper, A. (2008). Ocena ryzyka czasu i kosztów w planowaniu produkcji budowlanej. Przegląd Budowlany, 7–8, 70–75.
  23. Meouche, E.R., Abunemeh, M., Hijaze, I., Mebaraki, A. (2018). Developing optimal paths for evacuating risky construction sites. Journal of Construction Engineering and Management, 144(2). https://doi/org/10.1061/(ASCE) CO.1943-7862.000141310.1061/(ASCE)CO.1943-7862.0001413
  24. Мirković, M. (2016). Optimizacija Raspoloživosti Sistema za Proizvodnju i Ugradjivanje Bitumenom Vezanih Materijala, Doctoral Dissertation. Belgrade: Faculty of Civil Engineering, University in Belgrade. Retrieved from https://uvidok.rcub.bg.ac.rs/handle/123456789/1014 (date of access: 5.11.2019).
  25. Мirković, M. (2018). The impact of failure types in construction production systems on economic risk assessments in the bidding phase. Complexity Journal, ID 5041803, 1–13. https://doi/org/10.1155/2018/5041803
  26. Myrczek, J., Sadlik-Lenczewska, M., Tworek, P. (2015). Wybrane problemy zarządzania ryzykiem w działalności przedsiębiorstw budowlanych. In Zarządzanie (pp. 127–136). Częstochowa: Politechnika Częstochowska.
  27. Myrczek, J., Tworek, P. (2019). Excerpts from the research on risk management in Polish construction enterprises. In MATEC Web of Conferences (pp. 1–8). Paris.10.1051/matecconf/201926207009
  28. Nguyen, A.D., Garvin, J.M., Gonzalez, E.E. (2018). Risk allocation in U.S. public-private partnership highway project contracts. Journal of Construction Engineering and Management, 144(5). https://doi/org/10.1061/(ASCE) CO.1943-7862.0001465
  29. Ogwueleka, Ch.A., Udoudoh, P.F. (2018). The impact of risk and reward dynamics in incentive compensation plans in the Nigerian construction industry. International Journal of Construction Management, 18(3), 247–259.10.1080/15623599.2017.1315545
  30. Palmer, J.W., Maloney, J.M., Heffron, L.J. (1996). Construction insurance, bonding, and risk management. New York: McGraw-Hill.
  31. Sawczuk, B. (2004). Risk avoidance for the building team. London: E & FN Spon.
  32. Sekunda, R., Marcinkowski, R. (2016). Ryzyko w planowaniu działań inżynieryjnobudowlanych realizowanych przez jednostki zhierarchizowane. Przegląd Budowlany, 10, 43–49.
  33. Shoe, S., Leite, F. (2017). Assessing safety risk among different construction traders: Quantitative approach. Journal of Construction Engineering and Management, 143(5). https://doi/org/10.1061/(ASCE)CO.1943-7862.0001237
  34. Skorupka, D. (2007). Metoda identyfikacji i oceny ryzyka realizacji przedsięwzięć budowlanych. Warszawa: Wojskowa Akademia Techniczna.
  35. Skorupka, D. (2009). Method of planning construction projects, taking into account risk factors. Badania Operacyjne i Decyzje, 3, 119–128.
  36. Smith, N.J., Merna, T., Jobling, P. (2006). Managing risk in construction projects. Oxford: Blackwell Publishing.
  37. Sullivan, J., Asmar, E.M., Chalhoub, J., Obeid, H. (2017). Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: Quantitative analysis of the state of knowledge on project cost, schedule, and quality. Journal of Construction Engineering and Management, 143(6). https://doi/org/10.1061/(ASCE)CO.1943-7862.000128210.1061/(ASCE)CO.1943-7862.0001282
  38. Tah, J.H.M., Carr, V. (2000). A proposal for construction project risk assessment using fuzzy logic. Construction Management and Economics, 18(4), 491–500.10.1080/01446190050024905
  39. Tempo-Silungwe, K.Ch., Khatleli, N. (2018). Identification of enablers and constraints of risk allocation using structuration theory in the construction industry. Journal of Construction Engineering and Management, 144(5). https://doi/org/10.1061/(ASCE)CO.1943-7862.000147110.1061/(ASCE)CO.1943-7862.0001471
  40. Turskis, Z., Gajzler, M., Dziadosz, A. (2012). Reliability, risk management, and contingency of construction processes and projects. Journal of Civil Engineering and Management, 18(2), 290–298.10.3846/13923730.2012.672931
  41. Tworek, P. (2013). Reakcja na ryzyko w działalności przedsiębiorstwa budowlanomontażowego. Warszawa: Difin.
  42. Tworek, P., Myrczek, J. (2017). Identifying and managing construction risks in the public sector. In J. Nesleha, T. Plihal, K. Urbanovsky (Eds.), Proceedings of the 14thInternational Scientific Conference (pp. 422–429). Brno: Masaryk University.
  43. Tworek, P., Myrczek, J. (2015). Methodical problems of response to the risks in investment and construction processes: a case of Polish largest developers (survey research). In M. Čulik (Ed.) Proceedings from 10thInternational Conference (pp. 1348–1355). Ostrava: VŠB – Technická Univerzita Ostrava.
  44. Weatherhead, M., Owen, K., Hall, C. (2005). Integrating value and risk in construction. London: Construction Industry Research and Information Association.
  45. Zavadskas, K.E, Turskis, Z., Tamošaitien, J. (2010). Risk Assessment in construction projects. Journal of Civil Engineering and Management, 16(1), 33–46.10.3846/jcem.2010.03
  46. Zhao, X., Hwang, B.G., Low, P.S. (2015). Enterprise risk management in international construction firms: drivers and hindrances. Engineering, Construction and Architectural Management, 22(3), 347–366.10.1108/ECAM-09-2014-0117
DOI: https://doi.org/10.37705/TechTrans/e2020025 | Journal eISSN: 2353-737X | Journal ISSN: 0011-4561
Language: English
Submitted on: Oct 18, 2019
Accepted on: Jul 22, 2020
Published on: Jul 30, 2020
Published by: Cracow University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 1 times per year

© 2020 Józef Myrczek, Janusz Juraszek, Piotr Tworek, published by Cracow University of Technology
This work is licensed under the Creative Commons Attribution-ShareAlike 4.0 License.