A two-stage flow shop scheduling with a critical machine and batch availability
By: Enrique Gerstl and Gur Mosheiov
Open Access
|Oct 2012References
- [1] Cheng T.C.E. and Kovalyov M. Y., An exact algorithm for batching and scheduling two part types in a mixed shop: A technical note,,, 1998, 53-56.
- [2] Cheng T.C.E., Kovalyov M.Y. and Chakhlevich K. N., Batching in a two-stage flowshop with dedicated machines in second stage.,, 2004, 87-93.
- [3] Cheng T.C.E., Lin B.M.T. and Tian Y., Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times,,, 2009, 3031-3040.
- [4] Ching C. Y., Liao, Wu C. J., Batching to minimize total production time for two part types,,, 1997, 63-72.
- [5] Drobouchevitch I. G., Strusevich V. A., Heuristics for the two-stage job shop scheduling problem with a bottleneck machine,,, 2000, 229-240.
- [6] Kyparisis G. J., Koulamas, C., Flow shop and open shop scheduling with a critical machine and two operations per job,,, 2000, 120-125.
- [7] Lin H.-T., Liao, C. -J., A case study in a two-stage hybrid flow shop with setup time and dedicated machines,,, 2003, 133-143.
- [8] Linn R., Zhang W., Hybrid flow shop scheduling: A survey,, 1999, 57-61.
- [9] Mosheiov G., Yovel U., Comments on “Flow shop and open shop scheduling with critical machine and two operations per job”,,, 2004, 257-261.
- [10] Oguz C., Ercan, M. F., A Genetic Algorithm for Hybrid Flow-Shop Scheduling with Multiprocessor Tasks,,, 2005, 323-351.
- [11] Ruiz, R., Vazquez-Rodriguez J.A., The hybrid flow shop scheduling problem,,, 2010, 1-18.
DOI: https://doi.org/10.2478/v10209-011-0004-y | Journal eISSN: 2300-3405 (formerly 0867-6356) | Journal ISSN: 0867-6356
Language: English
Page range: 39 - 56
Published on: Oct 24, 2012
Published by: Poznan University of Technology
In partnership with: Paradigm Publishing Services
Keywords:
Related subjects:
© 2012 Enrique Gerstl, Gur Mosheiov, published by Poznan University of Technology
This work is licensed under the Creative Commons License.