Have a personal or library account? Click to login
A two-stage flow shop scheduling with a critical machine and batch availability Cover

A two-stage flow shop scheduling with a critical machine and batch availability

Open Access
|Oct 2012

Abstract

We study a two-stage flowshop, where each job is processed on the first (critical) machine, and then continues to one of two second-stage (dedicated) machines. We assume identical (but machine-dependent) job processing times. Jobs are processed on the critical machine in batches, and a setup time is required when starting a new batch. The setting assumes batch-availability, i.e., jobs become available for the second stage only when their entire batch is completed on the critical machine. We consider three objective functions: minimum makespan, minimum total load, and minimum weighted flow-time. Polynomial time dynamic programming algorithms are introduced, which are numerically shown to be able to solve problems of medium size in reasonable time. A heuristic for makespan minimization is presented and shown numerically to be both accurate and efficient.

DOI: https://doi.org/10.2478/v10209-011-0004-y | Journal eISSN: 2300-3405 | Journal ISSN: 0867-6356
Language: English
Page range: 39 - 56
Published on: Oct 24, 2012
Published by: Poznan University of Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 times per year

© 2012 Enrique Gerstl, Gur Mosheiov, published by Poznan University of Technology
This work is licensed under the Creative Commons License.