Method of Power System Suistanable Development Optimization in Liberalized Market Conditions
By: M. Turcik, I. Oleinikova and Z. Krishans
Open Access
|Jul 2011References
- Baltic Energy Market Interconnection Plan. (25 Nov. 2009).(Vilnius).
- Bariss, U. (11 May, 2011).Riga (in Latvian).
- Baltic Regional Group Annual Report 2009. (2010).
- The Kurzeme Ring.
- Estonian Energy in Figures, 2007. (2008).
- Elering: Company Report 2010.
- European Network of Transmission System Operators for Electricity. (2010).Brussels: ENTSO-E AISBL.
- Bariss, U. (21 Sept., 2010).(in Latvian).
- Krishans, Z., Mutule, A., Merkuryev, Y., & Oleinikova, I. (2011).Berlin: Springer.
DOI: https://doi.org/10.2478/v10047-011-0017-6 | Journal eISSN: 2255-8896 (formerly 0868-8257) | Journal ISSN: 0868-8257
Language: English
Page range: 3 - 12
Published on: Jul 14, 2011
Published by: Institute of Physical Energetics
In partnership with: Paradigm Publishing Services
Related subjects:
© 2011 M. Turcik, I. Oleinikova, Z. Krishans, published by Institute of Physical Energetics
This work is licensed under the Creative Commons License.