References
- Kamiński P.: Selected problems associated with ship power plant operation (in Polish). Proceedings of the Conference on Design and Management of Realization of Production (Materiały Konferencyjne - Projektowanie i zarządzanie realizacją produkcji), Zielona Góra 2005
- Kamiński P, Tarełko W., Podsiadło A.: Information sources used in the aiding system for ship power plant management (in Polish). 25th International Symposium on Ship Power Plants (XXV Międzynarodowe Sympozjum Siłowni Okrętowych), Gdańsk 2004
- McDiarmid C. J. H.: The Solution of a Timetabling Problem. Journal of Institute of Mathematics Applications, 9, pp. 23-34, 197210.1093/imamat/9.1.23
- Smutnicki C.: Algorithms of sequencing (in Polish), Exit, Warszawa 2002.
- Sysło M. M., Doite N., Kowalik J. S.: Algorithms of discrete optimization (in Polish), PWN, Warszawa 1995
- Szwed C., Toczyłowski E.: Optimization of compartment resources in conditions of elastic studying (in Polish), Proceedings of Polyoptimization & CAD Conference (Materiały Konferencyjne Polioptymalizacja i CAD), Mielno 2000
- Tarnowski W.: Simulation and optimization in MATLAB software (in Polish), WSM Publishing House - Wydawnictwo WSM, Gdynia 2001
- Kamiński P.: Formulation of objective function of the decision - making problem in ship power plant. Proceedings of 4th Conference on Engineering Design in Integrated Product Development, Zielona Góra 2006
- Kamiński P.: Identification of elements of decision problem of ship power plant management (in Polish), Proceedings of Polyoptimization & CAD Conference (Materiały Konferencyjne Polioptymalizacja i CAD), Mielno 2006