Have a personal or library account? Click to login
Determining the Rational Motion Intensity of Train Traffic Flows on the Railway Corridors with Account for Balance of Expenses on Traction Resources and Cargo Owners Cover

Determining the Rational Motion Intensity of Train Traffic Flows on the Railway Corridors with Account for Balance of Expenses on Traction Resources and Cargo Owners

Open Access
|Jun 2019

References

  1. 1. Aleksandrov, A.E. and Yakushev, N.V. (2006) Stokhasticheskaya postanovka dinamicheskoy transportnoy zadachi s zaderzhkami s uchetom sluchaynogo razbrosa vremeni dostavki i vremeni potrebleniya. Upravlenie bolshimi sistemami [Stochastic statement of the dynamic transport problem with delays taking into account the random distribution of delivery time and consumption time]. Large-Scale Systems Control: Procedeengs, 12-13, pp. 5-14.
  2. 2. Badetskiy, A.P. (2013) Metod adaptatsii plana formirovaniya poezdov k sutochnoy neravnomernosti vagonopotokov [Method of adapting the plan for the formation of trains to the daily unevenness of car traffic]. Phd Thesis. Sankt-Peterburg.
  3. 3. Bektas, T. and Crainic, T.G. (2007) A Brief Overview of Intermodal Transportation, CIRRELT, In, Taylor, G. Don (ed.) Logistics Engineering Handbook. Boca Raton. CRC Press.
  4. 4. Bostel, N. and Dejax, P. (1998) Models and Algorithms for Container Allocation Problems on Trains in a Rapid Transshipment Shunting Yard. Transportation Science, 32(4), pp.370-379, 1998. Doi: 10.1287/trsc.32.4.37010.1287/trsc.32.4.370
  5. 5. Butko, T., Prokhorchenko, A. and Muzykin, M. (2016) An improved method of determining the schemes of locomotive circulation with regard to the technological peculiarities of railcar traffic. Eastern-European Journal of Enterprise Technologies, 5/3 (83), pp. 47-55. Doi:10.15587/1729-4061.2016.8047110.15587/1729-4061.2016.80471
  6. 6. Caprara, A., Malaguti, E. and Toth, P. (2011) A Freight Service Design Problem for a Railway Corridor. Transportation Science, 45(2), pp. 147-162. Doi:10.1287/trsc.1100.034810.1287/trsc.1100.0348
  7. 7. Caris, A., Macharis, C. and Janssens, G.K. (2008). Planning Problems in Intermodal Freight Transport: Accomplishments and Prospects. Transportation Planning and Technology, 31(3), pp. 277-302. Doi: 10.1080/0308106080208639710.1080/03081060802086397
  8. 8. Chen, C.-C., (F.) and Schonfeld, P. (2012) A Hybrid Heuristic Technique for Optimizing Intermodal Logistics Timed Transfer Systems. Procedia - Social and Behavioural Sciences, 48, pp. 2566-2576. Doi:10.1016/j.sbspro.2012.06.122710.1016/j.sbspro.2012.06.1227
  9. 9. Crainic, T.G. and Kim, K.H. (2006) Intermodal transportation. Transportation, 14, pp. 467-537.10.1016/S0927-0507(06)14008-6
  10. 10. Ferreira, L. (1997). Planning Australian freight rail operations: An overview. Transportation Research Part A: Policy and Practice, 31(4), pp. 335-348. Doi:10.1016/s0965-8564(96)00026-210.1016/S0965-8564(96)00026-2
  11. 11. Herrera, F., Lozano, M. and Verdegay, J.L. (1998) Tackling Real-Coded Genetic Algorithms: Operators and Tools for Behavioural Analysis. Artificial Intelligence Review, 12(4), pp. 265-319. Doi: 10.1023/a:100650490116410.1023/a:1006504901164
  12. 12. Hruntov, P.S., Diakov, Yu.V. and Makarochkyn, A.M. (1994) Upravlenie ekspluatatsionnoi rabotoi i kachestvom perevozok na zheleznodorozhnom transporte [Management of operational work and quality of traffic on the railway transport]. Textbook. Moscow: Transport.
  13. 13. Kasalica, S., Mandić, D. and Vukadinović, V. (2013) Locomotive Assignment Optimization Including Train Delays. PROMET – Traffic&Transportation, 25(5), pp. 1-10. Doi:10.7307/ptt.v25i5.140210.7307/ptt.v25i5.1402
  14. 14. Macharis, C. and Bontekoning, Y.M. (2004) Opportunities for OR in intermodal freight transport research: A review. European Journal of Operational Research, 153(2), pp. 400-416. Doi:10.1016/s0377-2217(03)00161-910.1016/s0377-2217(03)00161-9
  15. 15. Nahapetyan, A., Ahuja, K.R, Sargut, Z.F., Andy, J., Somani K. (2007) A Simulation/Optimization Framework for Locomotive Planning. 7th Workshop on Algorithmic Methods and Models for Optimization of Railways (ATMOS’07), pp. 259-276. Doi:10.4230/OASIcs.ATMOS.2007.118210.4230/OASIcs.ATMOS.2007.1182
  16. 16. Nekrashevich, V.I. and Kudryashev, S.A. (2005) Metodika otsenki vliyaniya pokazateley ispolzovaniya lokomotivnogo parka po dorogam na ikh velichinu po seti v tselom [Methodology of the impact estimation of indicators of the locomotive fleet usage on the roads on their size on the network as a whole]. Vestnik of the Railway Research Institute, 6, pp. 15-20.
  17. 17. Pedersen, M.B. and Crainic, T.G. (2007) Optimization of Intermodal Freight Service Schedules on Train Canals. Publication, Montréal: Centre for Research on Transportation.
  18. 18. Powell, W.B., Bouzaiene-Ayari, B., Cheng, C., Fiorillo, R., Das, S. and Lawrence, C. (2012) Strategic Tactical and Real-Time Planning of Locomotives at Norfolk Southern Using Approximate Dynamic Programming. Conference paper: Joint Rail Conference. 10 р. Doi:10.1115/jrc2012-7418710.1115/JRC2012-74187
  19. 19. Proschan, M.A. and Shaw, P.A. (2016) Essentials of Probability Theory for Statisticians. 1st Edition. Chapman and Hall/CRC Published.
  20. 20. Quaglietta, E., Corman, F. and Goverde, R.M.P. (2013). Stability analysis of railway dispatching plans in a stochastic and dynamic environment. Journal of Rail Transport Planning & Management, 3(4), pp. 137-149. Doi:10.1016/j.jrptm.2013.10.00910.1016/j.jrptm.2013.10.009
  21. 21. Sivilevičius, H. (2011) Modelling the interaction of transport system elements. Transport, 26(1), pp. 20-34. Doi: 10.3846/16484142.2011.56036610.3846/16484142.2011.560366
  22. 22. Su, R., Zhou, L. and Tang, J. (2015) Locomotive Schedule Optimization for Da-qin Heavy Haul Railway. Mathematical Problems in Engineering, 2015, pp. 1-14. Doi:10.1155/2015/60737610.1155/2015/607376
  23. 23. Sveshnikov, A.A. (1968) Problems in Probability Theory, Mathematical Statistics and Theory of Random Functions. Dover Publications; Reprint edition.
  24. 24. Talebian, A. and Zou, B. (2014) Train Planning on a Single Track Shared-Use Passenger and Freight Corridor With Demand Considerations. Conference paper: Joint Rail Conference, 10 p. DOI: 10.1115/JRC2014-3732.10.1115/JRC2014-3732
  25. 25. Zhao, Y., Liu, R., Zhang, X. and Whiteing, A. (2018) A chance-constrained stochastic approach to intermodal container routing problems. PLoS ONE 13(2): e0192275. Doi:10.1371/journal.pone.019227510.1371/journal.pone.0192275581100529438389
  26. 26. Zhu, E., Crainic, T. G. and Gendreau M. (2014). Scheduled Service Network Design for Freight Rail Transportation. Operations Research, 62(2), Doi:10.1287/opre.2013.125410.1287/opre.2013.1254
DOI: https://doi.org/10.2478/ttj-2019-0018 | Journal eISSN: 1407-6179 | Journal ISSN: 1407-6160
Language: English
Page range: 215 - 228
Published on: Jun 26, 2019
Published by: Transport and Telecommunication Institute
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2019 Tetiana Butko, Mykhailo Muzykin, Andrii Prokhorchenko, Halyna Nesterenko, Halyna Prokhorchenko, published by Transport and Telecommunication Institute
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.