Have a personal or library account? Click to login
Impact of Takt-Time Planning on Plastering Work Productivity: A Case Study Cover

Impact of Takt-Time Planning on Plastering Work Productivity: A Case Study

Open Access
|Dec 2023

References

  1. Hossain A., Bissenova A. & Kim J. R. (2019). Investigation of Wasteful Activities Using Lean Methodology: In Perspective of Kazakhstan’s Construction Industry. Buildings 9(5), 113. DOI: <a href="https://doi.org/10.3390/buildings9050113." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3390/buildings9050113.</a>
  2. Rajkumar K. B. & Biswas A. P. (2016). Identification of Non-Value Adding Activities using Lean Technology in Construction. Int. J. of Engineering Research & Technology (IJERT) 5(3), pp. 640-643. Retrieved date of access 11.04.2023 from https://www.ijert.org/.
  3. Chamulová B. (2013). Dynamický časový plán v procese riadenia výstavby. 1. vyd. Brno: Tribun EU, 97.
  4. Issa Us. H. & Alqurashi M. (2020). A Model for Evaluating Causes of Wastes and Lean Implementation in Construction Projects, Jour. of Civ. Eng. and Man. 26 (4), 331.
  5. Mughees, A., Zhili, G. & Gary, S. (2020). Framework for selection of lean construction tools based on lean objectives and functionalities. International Journal of Construction Management, DOI:<a href="https://doi.org/10.1080/15623599.2020.1729933." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1080/15623599.2020.1729933.</a>
  6. Zhanga, L. & Chenb, X. (2016). Role of lean tools in supporting knowledge creation and performance in lean construction. International Conference on Sustainable Design, Engineering and Construction. Procedia Engineering, 145, pp. 1267 – 1274. DOI: <a href="https://doi.org/10.1016/j.proeng.2016.04.163." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1016/j.proeng.2016.04.163.</a>
  7. Brioso X., Murguia D. & Urbina A. (2017). Teaching Takt-Time, Flowline, and Point-to-Point Precedence Relations: A Peruvian Case Study. In Creative Construction Conference, 19-22 June 2017, Primosten, Croatia.
  8. Yassine T., Bacha M. B. Sa, Fayek F. & Hamzeh F. (2014). Implementing Takt-Time Planning in Construction to Improve Workflow. In IGLC-22 Production Planning and Control 22, June (pp. 787–798). Oslo.
  9. Fabian A., & Adel F. (2020). Spatiotemporal Planning of Construction Projects: A Literature Review and Assessment of the State of the Art. Front. Built Environ. 6. DOI: <a href="https://doi.org/10.3389/fbuil.2020.00128." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3389/fbuil.2020.00128.</a>
  10. Keskiniva K., Saari A. & Junnonen J.-M. (2021). Takt Production Monitoring and Control in Apartment Renovation Projects. Buildings, 11, 92. DOI: <a href="https://doi.org/10.3390/buildings11030092." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3390/buildings11030092.</a>
  11. Keskiniva K., Saari A. & Junnonen J.-M. (2020). Takt Planning in Apartment Building Renovation Projects. Buildings, 10, 226; DOI:<a href="https://doi.org/10.3390/buildings10120226." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3390/buildings10120226.</a>
  12. Frandson A., Berghede K. & Tommelein I. (2013). Takt Time Planning for Construction of Exterior Cladding. In 21st annual conference of the International Group for Lean Construction, 31-2 Aug (pp. 527–536). Fortaleza, Brazil.
  13. Brioso X., Murguia D. & Urbina A. (2017). Comparing three scheduling methods using BIM models in the Last Planner System. Organization, Technology and Management in Construction: An International Journal,9(1) 1604-1614. DOI: <a href="https://doi.org/10.1515/otmcj-2016-0024." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.1515/otmcj-2016-0024.</a>
  14. Gašparík, J., Motyčka, V., Šťastný, P., & Szalayová, S. (2021). Multi-Criteria Optimization of Mechanized Earth Processes and Its Impact on Economic and Environmental Sustainability. Sustainability, 14(1), 78. DOI: <a href="https://doi.org/10.3390/su14010078." target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">10.3390/su14010078.</a>
  15. Gonos R. & Kušnírik M. (2021). Polyfunkčný súbor “Popradská“ I.etapa. Realizačný projekt, 1-22.
DOI: https://doi.org/10.2478/sspjce-2023-0002 | Journal eISSN: 1338-7278 | Journal ISSN: 1336-9024
Language: English
Published on: Dec 29, 2023
Published by: Sciendo
In partnership with: Paradigm Publishing Services
Publication frequency: 2 times per year

© 2023 Mária Kozlovská, Daria Kempecova, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.