Impact of Takt-Time Planning on Plastering Work Productivity: A Case Study Cover

Impact of Takt-Time Planning on Plastering Work Productivity: A Case Study

Open Access
|Dec 2023

Abstract

This article aims to analyze productivity issues during the implementation of plastering works on the case study of a residential complex. The results of the study revealed that establishing a proper work schedule and adhering to the Takt schedule resulted in a 19% increase in plastering productivity compared to non-Takt schedules. Furthermore, the study identified the existence of waste, which had a negative impact on the progress of the plastering work and could have been prevented through better project planning during the initial project phases.

DOI: https://doi.org/10.2478/sspjce-2023-0002 | Journal eISSN: 1338-7278 | Journal ISSN: 1336-9024
Language: English
Published on: Dec 29, 2023
Published by: Sciendo
In partnership with: Paradigm Publishing Services
Publication frequency: 2 times per year

© 2023 Mária Kozlovská, Daria Kempecova, published by Sciendo
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.