- IREX, Recommendations for the Design, Construction and Control of Rigid Inclusion Ground Improvements. ASIRI National Project, Presses des Ponts, Paris, 2013.
- Larisch, M.D., Arnold, M., Uhlig, M., Schwiteilo, E., Williams, D.J., Scheuermann, A. (2013). Stress and displacement monitoring of auger displacement piles. PILE 2013: International Conference on State of the Art of Pile Foundation and Pile Case Histories, Bandung, West Java, Indonesia, 2–4 June, 2013, Universitas Katolik Parahyangan, Bandung, West Java, Indonesia.
- Krasiński, A., Wiszniewski, M. (2017), Static load test on concrete pile – instrumentation and results interpretation. International Conference on Advancement of Pile Technology and Pile Case Histories, Bali, Indonesia.
- Wiszniewski, M., Krasiński, A., Linowiecki, J. (2018). Variability of the modulus of elasticity of concrete in the shaft of a displacement pile in the light of laboratory tests “in Polish”. Scient Acta Scientiarum Polonorum Architectura, 17(3), 57-65. doi: 10.22630/ASPA.2018.17.3.29.
- Hsi, J.P., Nguyen, H.H., Khabbaz, H., Fatahi, B. (2017). Effects of installing Controlled Modulus Columns on previously installed columns – the 19th International Conference on Soil Mechanics and Geotechnical Engineering, Seoul, pp. 2611-2614.
- Szajna, W., Bondareva, L., Szatanik, B. (2024). Analysis of deformations of road embankments founded on displacement columns improving soft subsoil. Archives of Civil Engineering, 70(1), 19-36. doi: 10.24425/ace.2024.148898.
- Topolnicki, M., Kłosiński, B. (2022). Guidelines for Reinforcement the Soil Subgrade with Rigid Columns – Collective Work “in Polish”, PWN, Warszawa.
- Fellenius, B.H. (2001). From strain measurements to load in an instrumented pile. Geotechnical News Magazine, 19(1), 35-38.
- Krasiński, A. (2023). Estimation of screw displacement pile bearing capacity based on drilling resistances. Studia Geotechnica et Mechanica, 45(s1), 282-292. doi: 10.2478/sgem-2023-0014.
- Larisch, M.D., Williams, D.J., Scheuermann, A., McConnell, A. (2014). Stress monitoring using a raked CPTu during screw auger pile installation – Conference: 3rd International Symposium on Cone Penetration Testing, Las Vegas, Nevada, USA.
- Suleiman, M.T., Ni, L., Davis, C., Lin, H., Xiao, S. (2015). Installation effects of controlled modulus column ground improvement piles on surrounding soil. Journal of Geotechnical and Geoenvironmental Engineering, 142(1), 04015059-1–04015059-10. doi: 10.1061/(ASCE)GT.1943-5606.00013.
- Wiszniewski, M., Krasiński, A. (2021). Identification of residual force in static load tests on instrumented screw displacement piles. Studia Geotechnica et Mechanica, 43(4), 438-451. doi: 10.2478/sgem-2021-0025.
- Sieńko, R. (2016). SHM, Technological Project of the S7 Monitoring System on the Nowy Dwór Gdański – Kazimierzowo section “in Polish”, project number: SHM/165 ver. 04.
- Journal of Sensor Assembly and Calibration in Research Columns “in Polish”. (2016). Prepared by SHM System.
- Model 4100/4150 Series Vibrating Wire Strain Gauges. (2021). Instruction Manual. Geokon. http//www.geokon.com.
- Model 4370 Concrete Stressmeter. (2003–2019). Instruction Manual. Geokon. http//www.geokon.com.
- Laube, M., Rusack, T. (2002). Concrete Stress Measurement – Device and Applications. MPA Braunschweig. www.imeko.org/publications/tc20-2002/IMEKO-TC20-2002-002.pdf.
- Sinnreich, J., Ryan, W.G. (2022). Application of the concrete stressmeter for Augered Cast-in-Place (ACIP), Deep foundation Testing. DFI Journal, 16(1), 1–8. doi: 10.37308/DFIJnl.20180926.185.