Have a personal or library account? Click to login
Impact of longwall mining on slope stability – A case study Cover

Impact of longwall mining on slope stability – A case study

Open Access
|Nov 2022

Abstract

In recent decades, many open pit (OP) mines have either already made the decision or are at the planning stage to change their mining activity from OP to underground (UG) to remain competitive. Technically, before the OP ends its operation, both OP and UG mining will have to be operated simultaneously for a certain period of time. It is well known that UG operation causes subsidence, discontinuous deformations, and changes in hydrogeological conditions. In case of UG operation located below the OP mine, slope deformation can be expected as a result of subsidence induced by UG exploitation.

This paper presents a numerical analysis of slope stability under the influence of the longwall mining operation at the Cao Son OP mine in Vietnam. All calculation variants were performed using the Finite Difference Method code, FLAC. In order to evaluate slope stability of the OP slope, various geometry configurations showing advances of both OP and UG extractions were examined. Based on the outcomes, assessments on OP slope are presented, and then, practical actions regarding the location and direction of UG extraction are recommended, with an aim to minimize the impact of underground mining on OP slope.

DOI: https://doi.org/10.2478/sgem-2022-0019 | Journal eISSN: 2083-831X | Journal ISSN: 0137-6365
Language: English
Page range: 282 - 295
Submitted on: Oct 28, 2020
Accepted on: Aug 30, 2022
Published on: Nov 27, 2022
Published by: Wroclaw University of Science and Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2022 Phu Minh Vuong Nguyen, published by Wroclaw University of Science and Technology
This work is licensed under the Creative Commons Attribution 4.0 License.