Have a personal or library account? Click to login
Excavations in the vicinity of the antiflood embankments – calculating issues Cover

Excavations in the vicinity of the antiflood embankments – calculating issues

Open Access
|Apr 2022

Abstract

According to Polish law, it is prohibited to perform excavations or locate buildings closer than 50 m from the embankment. In order to obtain exemption from this ban, filtration and stability analysis of the embankment and excavation in the flood conditions have to be performed. This paper presents results of the numerical investigations on interactions between excavations and embankment. Complex nature of the problem is presented. Methodology of numerical simulations and real case examples are described.

DOI: https://doi.org/10.2478/sgem-2022-0006 | Journal eISSN: 2083-831X | Journal ISSN: 0137-6365
Language: English
Page range: 138 - 147
Submitted on: Apr 23, 2020
Accepted on: Feb 17, 2022
Published on: Apr 26, 2022
Published by: Wroclaw University of Science and Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2022 Michał Grodecki, published by Wroclaw University of Science and Technology
This work is licensed under the Creative Commons Attribution 4.0 License.