Safety analysis of the Żelazny Most tailings pond: qualitative evaluation of the preventive measures effectiveness

Open Access
|Jun 2021

Abstract

In this paper, a qualitative safety analysis of the Żelazny Most tailings pond is addressed. This object is one of the largest facilities of this type in the world being a crucial element in the technological line of copper production in KGHM Polska Miedź S.A. The assessment of the effectiveness of two types of preventive measures, i.e., relief wells and loading berms, is investigated based on displacement and stability analysis of two 2D cross-sections in a technical section of the dam. The study shows that the considered preventive measures generally have a positive impact on increasing the safety level of the structure during its further raise. In particular, their effectiveness is most evident when they are applied simultaneously. It is eventually suggested that the selection of final solutions to be applied on the facility should be based on the quantitative 3D analysis.

DOI: https://doi.org/10.2478/sgem-2021-0011 | Journal eISSN: 2083-831X | Journal ISSN: 0137-6365
Language: English
Page range: 181 - 194
Submitted on: May 7, 2021
Accepted on: May 11, 2021
Published on: Jun 30, 2021
Published by: Wroclaw University of Science and Technology
In partnership with: Paradigm Publishing Services
Publication frequency: 4 issues per year

© 2021 Dariusz Łydżba, Adrian Różański, Maciej Sobótka, Michał Pachnicz, Szczepan Grosel, Matylda Tankiewicz, Paweł Stefanek, published by Wroclaw University of Science and Technology
This work is licensed under the Creative Commons Attribution 4.0 License.