References
- ACI Committee 355. (1991). State-of-the-art report on anchorage to concrete (ACI 355.1R-91). Reapproved 1997. Detroit, USA: American Concrete Institute.
- Ashour, A., & Alqedra, M. (2005). Concrete breakout strength of single anchors in tension using neural networks. Advances in Engineering Software, 36(2), 87–97.
- Brincker, R., Ulfkjær, J. P., Adamsen, P., Langvad, L., & Toft, R. (1995). Analytical Model for Hook Anchor Pull-out. In R. Widmann (Ed.), Proceedings of the International Symposium on Anchors in Theory and Practice: Salzburg, Austria, 9–10 october 1995 (pp. 3–15)
- Cebula, D. (2015). Wyniki badań dołowych technologii mechanicznego odspajania skał. In Nowoczesne metody eksploatacji węgla i skał zwięzłych: Monografia (The results of underground testing of mechanical rock break technology. Modern methods of coal and solid rock mining. Monograph. – in polish) (pp.212–222). Kraków: Akademia Górniczo-Hutnicza im. Stanisława Staszica.
- CEN/TC250, “EN1992-4 - Eurocode 2: Design of concrete structures - Part 4: Design of fastenings for use in concrete,” 2018.
- CEN/TS 1992-4-1: Design of fastenings for use in concrete - Part 4-1: General, CEN, Brussels, 2009.
- Comite Euro-International du Beton (CEB). (1994). Fastenings to concrete and masonry structures. London, England: Thomas Telford Services Ltd.
- Drwięga, A., et. al. (2014). Sprawozdanie za rok 2014 z realizacji projektu INREQ (Report for 2014 on the implementation of the INREQ project – in polish),. Unpublished Report. Gliwice: ITG KOMAG.
- Fuchs, W., Eligehausen, R., Breen, J.E. (1995). Concrete capacity design (CCD) approach for fastening to concrete. ACI Structure Journal, 92 (1), 73–94.
- Gontarz, J., Podgórski, J., Jonak, J., Kalita, M., & Siegmund, M. (2019). Comparison between numerical analysis and actual results for a pull-out test. Engineering Transactions, 67(3), 311–331. doi:10.24423/EngTrans.1005.20190815
- Gontarz, J., Podgórski, J., Siegmund, M. (2017). Comparison of crack propagation analyses in a pull-out test: AIP Conference Proceedings. 1922. doi: 10.1063/1.5019141
- Hariyadi, Munemoto, S., & Sonoda, Y. (2017). Experimental analysis of anchor bolt in concrete under the pull-out loading. Paper presented at the Procedia Engineering, 171 926–933. doi:10.1016/j.proeng.2017.01.391
- Hilti. (2014). Anchor Fastening: Technology Manual, 09. Retrieved from
https://www.hilti.group/content/dam/documents/pdf/a1/singapore/thailand-products-catalog/Thailand-Anchor%20Fastening%20Technology%20Manual-th.pdf - Jonak, J., & Siegmund, M. (2019). FEM 3D analysis of rock cone failure range during pull-out of undercut anchors. Paper presented at the IOP Conference Series: Materials Science and Engineering, 710(1) doi:10.1088/1757-899X/710/1/012046
- Jonak, J., Siegmund, M., et al. (2018). Sprawozdanie z realizacji zadania 2 projektu RODEST (Report on implementation of tasks 2 of the RODEST project – in polish), Unpublished Research Paper. Gliwice: ITG KOMAG.
- Kalita, M., & Prostański, D. (2012). Technologia drążenia tuneli ratowniczych metodą niszczenia spójności skał. (Technology of rescue tunneling by use of rock cohesion damaging method – in polish) Przegląd Górniczy, 12. 86–91. 1
- Klich, A. Et al. (1998). Niekonwencjonalne techniki urabiania skał (Unconventional rock mining techniques – in polish). Katowice: Wydawnictwo Śląsk.
- Nilforoush, R. (2019)- A Refined Model for Predicting Concrete-Related Failure Load of Tension Loaded Cast-in-Place Headed Anchors in Uncracked Concrete. Nordic Concrete Research Volume 60 (2019), (pp. 105–129) doi:10.2478/ncr-2019-0091
- Piccinin, R.; Ballarini, R.; Cattaneo, S. Pullout Capacity of Headed Anchors in Prestressed Concrete. Journal of Engineering Mechanics 2012, 138, 877–887.
- Siegmund, M., & Jonak, J. (2017). Analiza wyników badań wstępnych oraz określenie kierunku dalszych prac badawczych technologii drążenia tuneli ratowniczych metodą mechanicznego odspojenia. Analysis of the results of preliminary studies and determination of direction of further research work on technology of drilling the rescue tunnels by the method of mechanical loosening - in polish), Cuprum, 1, 57–71
- Siegmund, M., & Jonak, J. (2019). Analysis of the process of loosening the rocks with different strength properties using the undercutting bolts. Paper presented at the IOP Conference Series: Materials Science and Engineering, 679(1) doi:10.1088/1757-899X/679/1/012014
- Subramanian, N. Recent developments in the design of anchor bolts, The IndianConcrete Journal, July 2000, Vol. 74, No. 7, pp. 407–414.
- Tan, E. L., Varsani, H., Liao, F. Y. (2019). Experimental study on demountable steel-concrete connectors subjected to combined shear and tension. Engineering Structures, 183, 110–123. doi: 10.1016/j.engstruct.2018.12.08
- Tomiczek, K. (2017–2018). Badania wytrzymałościowe wybranych skał magmowych i osadowych: Raporty z badań dla ITG KOMAG (Strength tests of selected igneous and sedimentary rocks. Research reports for ITG KOMAG – in polish) (NB-363/RG4/2017, NB-11/RG4/2017, NB-117/RG4/2018, NB 266/RG-4/2018). Unpublished Research Reports. Gliwice: Politechnika Śląska.