Abdelgawad, M., & Fayek, A. R. (2010). Risk management in the construction industry using combined fuzzy FMEA and fuzzy AHP. Journal of Construction Engineering and Management, 136, pp. 1028-1036.
Al-Gheth, A., & Ishak, M. S. B. (2020). Review of causes of delay in construction projects. Journal of Computational and Theoretical Nanoscience, 17, pp. 715-728.
Anacona Mopan, Y. E., Solis Pino, A. F., Rubiano-Ovalle, O., Paz, H., & Ramirez Mejia, I. (2023). Spatial analysis of the suitability of Hass avocado cultivation in the Cauca Department, Colombia, using multi-criteria decision analysis and geographic information systems. International Journal of Geo-Information, 12, p. 136. doi: 10.3390/ijgi12040136.
Arantes, A., & Ferreira, L. M. D. F. (2020). Underlying causes and mitigation measures of delays in construction projects: An empirical study. Journal of Financial Management of Property and Construction, 25, pp. 165-181. doi: 10.1108/JFMPC-03-2019-0029.
Arditi, D., & Pattanakitchamroon, T. (2006). Selecting a delay analysis method in resolving construction claims. International Journal of Project Management, 24, pp. 145-155. doi: 10.1016/j.ijproman.2005.08.005.
Barati, A. A., Azadi, H., Dehghani Pour, M., Lebailly, P., & Qafori, M. (2019). Determining key agricultural strategic factors using AHP-MICMAC. Sustainability, 11, p. 3947. doi: 10.3390/su11143947.
Delgado Silveira, E., Álvarez Díaz, A., Pérez Menéndez-Conde, C., Serna Pérez, J., Rodríguez Sagrado, M. A., & Bermejo Vicedo, T. (2012). Análisis modal de fallos y efectos del proceso de prescripción, validación y dispensación de medicamentos. Farmacia Hospitalaria, 36, pp. 24-32. doi: 10.1016/j.farma.2010.12.002.
Dema, C. M., & Barberá, T. (2010). Una propuesta para la ampliación del campo de aplicación de “Matrice d’Impacts Croisés Multiplication” (MICMAC) a los casos en que no se alcanza la estabilización. 4th Int. Conf. Ind. Eng. Ind. Manag, pp. 1719-1729.
Doloi, H. (2013). Cost overruns and failure in project management: Understanding the roles of key stakeholders in construction projects. Journal of Construction Engineering and Management, 139, pp. 267-279.
Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. International Journal of Project Management, 30, pp. 479-489. doi: 10.1016/j.ijproman.2011.10.004.
Durdyev, S., & Hosseini, M. R. (2019). Causes of delays on construction projects: A comprehensive list. International Journal of Managing Projects in Business, 13, pp. 20-46. doi: 10.1108/IJMPB-09-2018-0178.
Elhusseiny, H. O., Nosair, I., & Ezeldin, A. S. (2021). Systematic processing framework for analyzing the factors of construction projects’ delays in Egypt. Ain Shams Engineering Journal, 12, pp. 1501-1511. doi: 10.1016/j.asej.2020.10.016.
Elshaboury, N., Alaa, H., Al-Sakkaf, A., Alfalah, G., & Mohammed Abdelkader, E. (2021). Prioritizing delay causes in the Egyptian building construction projects. Presented at the The 6th World Congress on Civil, Structural, and Environmental Engineering. doi: 10.11159/icsect21.lx.103.
Fakunle, F., & Fashina, A. (2020). Major delays in construction projects: A global overview | PMWorld Library [WWW Document], Available at https://pmworldlibrary.net/article/major-delays-in-construction-projects-a-global-overview/ [accessed 1 November 2023].
Giraldo Arcila, O. G., Granados Cortés, H. de J., & Tejada Moreno, L. G. (2013). Prospectiva Cualitativa Laboral en el Clúster de Construcción de Antioquia-Método Delphi.
Godet, M. (1987). MICMAC: Matrice d’Impacts Croisés— Multiplication Appliquée à un Classment (Cross impact matrix—multiplication applied to classification). Translated form the French by David Green and Alan Rodney. Butterworths, London Boston.
Gonzalez, P., González, V., Molenaar, K., & Orozco, F. (2014). Analysis of causes of delay and time performance in construction projects. Journal of Construction Engineering and Management, 140, p. 04013027.
Gordo Barreiro, E. M., Potes López, J. A., & Vargas Quimbaya, J. L. (2017). Factores que retrasan proyectos públicos en Neiva. Univ. St. Tomás Obtenido Httpsrepository Usta Edu Cobitstreamhandle1163410740Johana 20Potes-2017 Pdf.
Lee, J.-S., & Kim, Y.-S. (2017). Analysis of cost-increasing risk factors in modular construction in Korea using FMEA. KSCE Journal of Civil Engineering, 21, pp. 1999-2010. doi: 10.1007/s12205-016-0194-1.
Liu, Y., Eckert, C. M., & Earl, C. (2020). A review of fuzzy AHP methods for decision-making with subjective judgements. Expert Systems with Applications, 161, p. 113738. doi: 10.1016/j.eswa.2020.113738.
Mete, S. (2019). Assessing occupational risks in pipeline construction using FMEA-based AHP-MOORA integrated approach under Pythagorean fuzzy environment. Human and Ecological Risk Assessment: An International Journal, 25, pp. 1645-1660. doi: 10.1080/10807039.2018.1546115.
Mirakyan, A., & De Guio, R. (2015). Conceptual Basis of Uncertainty in IEPCT. In: Three Domain Modelling and Uncertainty Analysis. Energy Systems. Springer, Cham. https://doi-org.bd.univalle.edu.co/10.1007/978-3-319-19572-8_4.
Muhwezi, L., Acai, J., & Otim, G. (2014). An assessment of the factors causing delays on building construction projects in Uganda. International Journal of Construction Engineering and Management, 3, pp. 13-23.
Ocampo, L., Aro, J. L., Evangelista, S. S., Maturan, F., Yamagishi, K., Mamhot, D., Mamhot, D. F., Calibo-Senit, D. I., Tibay, E., Pepito, J., & Quiñones, R. (2022). Research productivity for augmenting the innovation potential of higher education institutions: An interpretive structural modeling approach and MICMAC analysis. Journal of Open Innovation Technology Mark, and Complexity, 8, p. 148. doi: 10.3390/joitmc8030148.
Palaneeswaran, E., & Kumaraswamy, M. M. (2008). An integrated decision support system for dealing with time extension entitlements. Automation in Construction, 17, pp. 425-438. doi: 10.1016/j.autcon.2007.08.002.
Rashid, N. S. A., Amin, N. A. M., & Mahad, N. F. (2020). The application of fuzzy analytic hierarchy to solve contractor selection problem. GADING Journal of Science and Technology, 3, pp. 109-117.
Rudeli, N., Viles, E., González, J., & Santilli, A. (2018). Causas de Retrasos en Proyectos de Construcción: Un análisis cualitativo. Memoria Investigaciones en Ingeniería, 16, pp. 71-84.
Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25, pp. 517-526.
Santos, F. R. S. dos, & Cabral, S. (2008). FMEA and PMBOK applied to project risk management. Journal of Information Systems and Technology Management, 5, pp. 347-364. doi: 10.4301/s1807-17752008000200008.
Segura Dorado, J., Anacona Mopan, Y. E., Solis Pino, A. F., & Paz Orozco, H. (2023). Fuzzy analytical network techniques for selecting suitable temporary refuge sites in Paez, Colombia. Journal of Intelligent & Fuzzy Systems, 45, pp. 5107-5121. doi: 10.3233/JIFS-231453.
Serna, S. L., Galindo, I. P., Gómez-Cabrera, A., & Torres, A. (n.d). Identificación de factores que generan diferencias de tiempo y costos en proyectos de construcción en Colombia. Ingeniería y Ciencia, 14, pp. 117-151.
Singh, R. P., & Nachtnebel, H. P. (2016). Analytical hierarchy process (AHP) application for reinforcement of hydropower strategy in Nepal. Renewable and Sustainable Energy Reviews, 55, pp. 43-58. doi: 10.1016/j.rser.2015.10.138.
Vidyasagar Reddy, M., & Rao, H. (2022). Analysing the critical delay factors and delay in material supply for construction projects in India. Material Today Proceedings, International Conference on Latest Developments in Materials & Manufacturing, 60, pp. 1890-1897. doi: 10.1016/j.matpr.2021.12.529.
Villacorta, P. J., Masegosa, A. D., Castellanos, D., & Lamata, M. T. (2014). A new fuzzy linguistic approach to qualitative cross impact analysis. Applied Soft Computing, 24, pp. 19-30. doi: 10.1016/j.asoc.2014.06.025.
Yang, C.-C., & Chen, B.-S. (2004). Key quality performance evaluation using fuzzy AHP. Journal of the Chinese Institute of Industrial Engineers, 21, pp. 543-550.
Yusuwan, N. M., & Adnan, H. (2013). Assessing extension of time application in Malaysian construction industry: Views from professionals. Procedia – Social and Behavioral Sciences, 105, pp. 54-63. doi: 10.1016/j.sbspro.2013.11.007.
Zemra, R., Boudouh, T., & Baheddi, M. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), pp. 371-381. [WWW Document], Available at https://www.tandfonline.com/doi/full/10.1080/15623599.2018.1435234 [accessed 1 November 2023].
Zidane, Y. J.-T., & Andersen, B. (2018). The top 10 universal delay factors in construction projects. International Journal of Managing Projects in Business, 11, pp. 650-672. doi: 10.1108/IJMPB-05-2017-0052.