Abd Karim, N. A., Rahman, I. A., Memmon, A. H., Jamil, N., & Azis, A. A. A. (2012, December). Significant risk factors in construction projects: Contractor’s perception. In 2012 IEEE Colloquium on Humanities, Science and Engineering (CHUSER). IEEE, pp. 347–350.
Adedokun, O., Egbelakin, T., & Omotayo, T. (2023). Random forest and path diagram taxonomies of risks influencing higher education construction projects. International Journal of Construction Management, 24(1), pp. 1–9.
Ahmed, S. M., Azhar, S., Castillo, M., & Kappagantula, P. (2002). Construction Delays in Florida: An Empirical Study. Final report. Department of Community Affairs, Florida, US.
Aibinu, A. A., & Odeyinka, H. A. (2006). Construction delays and their causative factors in Nigeria. Journal of Construction Engineering and Management, 132(7), pp. 667–677.
Akomah, B. B., & Jackson, E. N. (2016). Contractors perception of factors contributing to road project delay. International Journal of Construction Engineering and Management, 5(3), pp. 79–85.
Al Zubaidi, H., & Al Otaibi, S. (2008). An empirical approach for identifying critical time-ovrerun risk factors in Kuwait’s construction projects. Journal of Economic and Administrative Sciences, 24(2), pp. 35–53.
Alajmi, A. M., & Ahmed Memon, Z. (2022). A review on significant factors causing delays in Saudi Arabia construction projects. Smart Cities, 5(4), pp. 1465–1487.
Ali, A. S., Smith, A., Pitt, M., & Choon, C. H. (2010). Contractors’ perception of factors contributing to project delay: Case studies of commercial projects in Klang valley, Malaysia. Journal of Design and Built Environment, 7(1), pp. 1–17.
Alshihri, S., Al-Gahtani, K., & Almohsen, A. (2022). Risk factors that lead to time and cost overruns of building projects in Saudi Arabia. Buildings, 12(7), p. 902.
Buertey, J. I. T., Miezah, A. K., & Adjei-Kumi, T. (2013, August). Delays to large construction projects in Ghana: A risk overview. In Proceedings: 5th West Africa Built Environment Research (WABER) Conference. Accra, Ghana: WABER Conference, (pp. 367–380).
Chen, Z. J., Hsieh, T. S., & Mousavi Davoudi, S. M. (2022). Analysis of factors affecting the success of sustainable development projects with the help of machine learning tools. Discrete Dynamics in Nature and Society, 2022, pp. 1–9.
Cheng, M. Y., & Darsa, M. H. (2021). Construction schedule risk assessment and management strategy for foreign general contractors working in the Ethiopian construction industry. Sustainability, 13(14), p. 7830.
Choudhry, R. M., Aslam, M. A., Hinze, J. W., & Arain, F. M. (2014). Cost and schedule risk analysis of bridge construction in Pakistan: Establishing risk guidelines. Journal of Construction Engineering and Management, 140(7), p. 04014020.
Do, S. T., Nguyen, V. T., Tran, C. N., & Aung, Z. M. (2023). Identifying and evaluating the key claim causes leading to construction delays. International Journal of Construction Management, 23(12), pp. 1999–2011.
Egwim, C. N., Alaka, H., Toriola-Coker, L. O., Balogun, H., & Sunmola, F. (2021). Applied artificial intelligence for predicting construction projects delay. Machine Learning with Applications, 6, p. 100166.
Fashina, A. A., Omar, M. A., Sheikh, A. A., & Fakunle, F. F. (2021). Exploring the significant factors that influence delays in construction projects in Hargeisa. Heliyon, 7(4), pp. 1–9.
Gardezi, S. S. S., Manarvi, I. A., & Gardezi, S. J. S. (2014). Time extension factors in construction industry of Pakistan. Procedia Engineering, 77, pp. 196–204.
Hossen, M. M., Kang, S., & Kim, J. (2015). Construction schedule delay risk assessment by using combined AHP-RII methodology for an international NPP project. Nuclear Engineering and Technology, 47(3), pp. 362–379.
Hung, M. S., & Wang, J. (2016). Research on delay risks of EPC hydropower construction projects in Vietnam. Journal of Power and Energy Engineering, 4(4), pp. 9–16.
Ivanović, M. Z., Nedeljković, Đ., Stojadinović, Z., Marinković, D., Ivanišević, N., & Simić, N. (2022). Detection and in-depth analysis of causes of delay in construction projects: Synergy between machine learning and expert knowledge. Sustainability, 14(22), p. 14927.
Jarkas, A. M., & Haupt, T. C. (2015). Major construction risk factors considered by general contractors in Qatar. Journal of Engineering, Design and Technology, 13(1), pp. 165–194.
Jarkas, A. M., & Younes, J. H. (2014). Principle factors contributing to construction delays in the State of Qatar. International Journal of Construction Project Management, 6(1), p. 39.
Kassem, M., Khoiry, M. A., & Hamzah, N. (2020). Using probability impact matrix (PIM) in analyzing risk factors affecting the success of oil and gas construction projects in Yemen. International Journal of Energy Sector Management, 14(3), pp. 527–546.
Kesavan, M., Gobidan, N. N., & Dissanayake, P. B. G. (2015). Analysis of factors contributing civil engineering project delays in Sri Lanka. In 6th International Conference on Structural Engineering and Construction Management 2015, pp. 40–46.
Mahamid, I. (2016). Factors contributing to poor performance in construction projects: Studies of Saudi Arabia. Australian Journal of Multi-Disciplinary Engineering, 12(1), pp. 27–38.
Melaku Belay, S., Tilahun, S., Yehualaw, M., Matos, J., Sousa, H., & Workneh, E. T. (2021). Analysis of cost overrun and schedule delays of infrastructure projects in low income economies: Case studies in Ethiopia. Advances in Civil Engineering, 2021, pp. 1–15.
Mpofu, B., Ochieng, E. G., Moobela, C., & Pretorius, A. (2017). Profiling causative factors leading to construction project delays in the United Arab Emirates. Engineering, Construction and Architectural Management, 24(2), pp. 346–376.
Prateepasen, A., & Aumpiem, A. (2021). Problems causing delays and risk factors in welding construction projects of Thailand. Engineering Journal, 25(5), pp. 33–44.
Salem, Z. T. A., & Suleiman, A. (2020). Risk factors causing time delay in the Jordanian construction sector. International Journal of Engineering Research and Technology, 13(2), pp. 307–315.
Shoar, S., Chileshe, N., & Edwards, J. D. (2022). Machine learning-aided engineering services’ cost overruns prediction in high-rise residential building projects: Application of random forest regression. Journal of Building Engineering, 50, p. 104102.
Uddin, S., Ong, S., & Lu, H. (2022). Machine learning in project analytics: A data-driven framework and case study. Scientific Reports, 12(1), pp. 15252.
Van, T. N., & Quoc, T. N. (2021). Research trends on machine learning in construction management: A scientometric analysis. Journal of Applied Science and Technology Trends, 2(03), pp. 96–104.
Wuni, I. Y., Shen, G. Q., & Mahmud, A. T. (2022). Critical risk factors in the application of modular integrated construction: A systematic review. International Journal of Construction Management, 22(2), pp. 133–147.
Yu, B., Guo, Z., Asian, S., Wang, H., & Chen, G. (2019). Flight delay prediction for commercial air transport: A deep learning approach. Transportation Research Part E: Logistics and Transportation Review, 125, pp. 203–221.
Zafar, I., Yousaf, T., & Ahmed, D. S. (2016). Evaluation of risk factors causing cost overrun in road projects in terrorism affected areas Pakistan–a case study. KSCE Journal of Civil Engineering, 20, pp. 1613–1620.
Zhao, Y., Chen, W., Arashpour, M., Yang, Z., Shao, C., & Li, C. (2022b). Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption. Engineering, Construction and Architectural Management, 29(4), pp. 1753–1776.
Zhao, Y., Chen, W., Yang, Z., Li, Z., & Wang, Y. (2022a). Analysis on risk factors related delay in PCPs. Engineering, Construction and Architectural Management, 30(10), pp. 4609–4644.