Anees, M., Hussain, S. M., Khan, K., & Abbas, A. T. (2018). Factors affecting the need for feasibility analysis (for local construction projects). Sir Syed University Research Journal of Engineering & Technology, 8(1), pp. 18–22.
Apperly, I. A., Carroll, D. J., Samson, D., Humphreys, G. W., Qureshi, A., & Moffitt, G. (2010). Why are there limits on theory of mind use? Evidence from adults’ ability to follow instructions from an ignorant speaker. Quarterly Journal of Experimental Psychology, 63(6), pp. 1201–1217.
Braun, V., & Clarke, V. (2021). Can I Use Ta? Should I Use Ta? Should I Not Use Ta? Comparing Reflexive Thematic Analysis and Other Pattern-Based Qualitative Analytic Approaches. Counselling and Psychotherapy Research, 21(1), pp. 37–47.
Costello, G., & Preller, F. (2010). Property development principles and process: An industry analysis. 16th Pacific-Rim Real Estate Society Conference. Wellington, New Zealand.
Cruywagen, H., & Llale, J. (2017). The role of quantity surveyors in public-private partnerships in South Africa. South African Journal of Economic and Management Sciences, 20(1), pp. 1–7.
Dagne, N. D. (2019). Current practices and challenge of private residential real estate development in addis ababa from stakeholder perspectives. MBA, Addis Ababa Science and Technology University.
Epley, N., Morewedge, C. K., & Keysar, B. (2004). Perspective taking in children and adults: Equivalent egocentrism but differential correction. Journal of Experimental Social Psychology, 40(6), pp. 760–768.
Heralova, R. S. (2017). Life cycle costing as an important contribution to feasibility study in construction projects. Procedia Engineering, 196, pp. 565–570.
Hinds, P. J. (1999). The curse of expertise: The effects of expertise and debiasing methods on prediction of novice performance. Journal of Experimental Psychology: Applied, 5(2), p. 205.
Kimaru, K. (2018). The effectiveness of financing real estate development through off-plan sales: Case study of selected residential developments within Nairobi County. Masters, University of Nairobi.
Kwaku Osei, E. (2016). An evaluation of project cost management in the mining industry: A case study of Anglogold Ashanti (Gh) Limited–Obuasi Mine. MBA, Kwame Nkrumah University of Science and Technology.
Mackenzie, W., & Cusworth, N. (2007). The use and abuse of feasibility studies. In: AusIMM Project Evaluation Conference, 19–20 June 2007. AusIMM, Melbourne, Australia. pp. 1–12.
Marshall, B., Cardon, P., Poddar, A., & Fontenot, R. (2013). Does sample size matter in qualitative research? A review of qualitative interviews in is research. Journal of Computer Information Systems, 54(1), pp. 11–22.
Mohammed, S. R., Naji, H. I., & Ali, R. H. (2019). Impact of the feasibility study on the construction projects. In: IOP Conference Series: Materials Science and Engineering, 6–7 March 2019, Baghdad, Iraq. IOP Publishing, p. 022074
Morse, J. M., Barrett, M., Mayan, M., Olson, K., & Spiers, J. (2002). Verification strategies for establishing reliability and validity in qualitative research. International Journal of Qualitative Methods, 1(2), pp. 13–22.
Mudi, A. (2016). Quantity surveyor’s impact: A panacea to achieving critical success factors in PPP implementation. International Journal of Engineering Science Invention, 5(3), pp. 1–9.
Mukherjee, M., & Roy, S. (2017). Feasibility studies and important aspect of project management. International Journal of Advanced Engineering and Management, 2(4), pp. 98–100.
Oso Sunday, B. (2020). Management of time overrun in a selected building projects in Auchi Polytechnic, Auchi, Edo State. International Journal of Innovative Research and Advanced Studies (IJIRAS), 7(5), pp. 246–253.
Perera, S., Zhou, L., Udeaja, C., & Victoria, M. (2016). A Comparative Study of Construction Costs and Commercial Management Services in the UK and China. RICS, London.
Rose, J., & Johnson, C. W. (2020). Contextualizing reliability and validity in qualitative research: Toward more rigorous and trustworthy qualitative social science in leisure research. Journal of Leisure Research, 51(4), pp. 432–451.
Ross, L., Greene, D., & House, P. (1977). The “False Consensus Effect”: An egocentric bias in social perception and attribution processes. Journal of Experimental Social Psychology, 13(3), pp. 279–301.
Rwelamila, P., & Ogunlana, S. (2015). W107–Construction in Developing Countries Research Roadmap - Report for Consultation. In: International Council for Research and Innovation in Building (CIB).
Samuel, S., Cole, G. G., & Eacott, M. J. (2020). Two independent sources of difficulty in perspective-taking/theory of mind tasks. Psychonomic Bulletin and Review, 27(6), pp. 1341–1347.
Shaheen, M., & Pradhan, S. (2019). Sampling in qualitative research. In: Qualitative Techniques for Workplace Data Analysis. IGI Global, pp. 25–51. Doi: 10.4018/978-1-5225-5366-3.ch002.
Shen, L., Tam, V. W., Tam, L., & Ji, Y. (2010). Project feasibility study: The key to successful implementation of sustainable and socially responsible construction management practice. Journal of Cleaner Production, 18(3), pp. 254–259.
Spellacy, J., Edwards, D. J., Roberts, C. J., Hayhow, S., & Shelbourn, M. (2021). An investigation into the role of the quantity surveyor in the value management workshop process. Journal of Engineering, Design and Technology, 19(2), pp. 423–445.
Syed Alwee, S. N. A., Salehudin, N., Mohamed Sabli, N. A., Isnaini Janipha, N. A., & Maisham, M. (2019). The importance of information in the preparation of feasibility study for construction development. Voice of Academia: Academic Series of Universiti Teknologi MARA Kedah, 14(1), pp. 64–73.
Terblanche, R., Root, D., & Vosloo, R. (2021). Actants influencing the successful compilation of economic feasibility studies: The quantity surveyors’ perspective. (Eds). Lloyd Scott & Christopher J Neilson In: Thirty-Seventh Annual Conference, 6–7 September 2021. ARCOM, UK. p. 391.