References
- Anees, M., Hussain, S. M., Khan, K., & Abbas, A. T. (2018). Factors affecting the need for feasibility analysis (for local construction projects). Sir Syed University Research Journal of Engineering & Technology, 8(1), pp. 18–22.
- Apperly, I. A., Carroll, D. J., Samson, D., Humphreys, G. W., Qureshi, A., & Moffitt, G. (2010). Why are there limits on theory of mind use? Evidence from adults’ ability to follow instructions from an ignorant speaker. Quarterly Journal of Experimental Psychology, 63(6), pp. 1201–1217.
- Birch, S. A., & Bloom, P. (2007). The curse of knowledge in reasoning about false beliefs. Psychological Science, 18(5), pp. 382–386.
- Braun, V., & Clarke, V. (2021). Can I Use Ta? Should I Use Ta? Should I Not Use Ta? Comparing Reflexive Thematic Analysis and Other Pattern-Based Qualitative Analytic Approaches. Counselling and Psychotherapy Research, 21(1), pp. 37–47.
- Bryman, A. (2016). Social Research Methods, 5th edn. Oxford University Press, UK.
- Clark, H. H., & Brennan, S. E. (1991). Grounding in communication. Perspectives on Socially Shared Cognition, 13, pp. 127–149.
- Costello, G., & Preller, F. (2010). Property development principles and process: An industry analysis. 16th Pacific-Rim Real Estate Society Conference. Wellington, New Zealand.
- Creswell, J. W., & Creswell, J. D. (2017). Research Design: Qualitative, Quantitative, and Mixed Methods Approaches, 5th edn. SAGE Publications, USA.
- Cruywagen, H., & Llale, J. (2017). The role of quantity surveyors in public-private partnerships in South Africa. South African Journal of Economic and Management Sciences, 20(1), pp. 1–7.
- Dagne, N. D. (2019). Current practices and challenge of private residential real estate development in addis ababa from stakeholder perspectives. MBA, Addis Ababa Science and Technology University.
- Epley, N., Morewedge, C. K., & Keysar, B. (2004). Perspective taking in children and adults: Equivalent egocentrism but differential correction. Journal of Experimental Social Psychology, 40(6), pp. 760–768.
- Heralova, R. S. (2017). Life cycle costing as an important contribution to feasibility study in construction projects. Procedia Engineering, 196, pp. 565–570.
- Hinds, P. J. (1999). The curse of expertise: The effects of expertise and debiasing methods on prediction of novice performance. Journal of Experimental Psychology: Applied, 5(2), p. 205.
- Huxham, A. (2010). Property development: Feasibility and impact parameters in the Vaal triangle. Masters, North-West University.
- Kgaka, L. (2018). Challenges faced by small real estate entrepreneurs in the Johannesburg central business district. Masters, University of Cape Town.
- Kimaru, K. (2018). The effectiveness of financing real estate development through off-plan sales: Case study of selected residential developments within Nairobi County. Masters, University of Nairobi.
- Kwaku Osei, E. (2016). An evaluation of project cost management in the mining industry: A case study of Anglogold Ashanti (Gh) Limited–Obuasi Mine. MBA, Kwame Nkrumah University of Science and Technology.
- Leedy, P. D., & Ormrod, J. E. (2019). Practical Research: Planning and Design, 12th edn. Pearson Education, New York.
- Lock, D. (2020). The Practitioner Handbook of Project Controls. Routledge, UK.
- Mackenzie, W., & Cusworth, N. (2007). The use and abuse of feasibility studies. In: AusIMM Project Evaluation Conference, 19–20 June 2007. AusIMM, Melbourne, Australia. pp. 1–12.
- Maritz, M. J., & Siglé, H. M. (2016). Quantity Surveying Practice in South Africa, 2nd edn. Construction Economics Associates, South Africa.
- Marshall, B., Cardon, P., Poddar, A., & Fontenot, R. (2013). Does sample size matter in qualitative research? A review of qualitative interviews in is research. Journal of Computer Information Systems, 54(1), pp. 11–22.
- Mohammed, S. R., Naji, H. I., & Ali, R. H. (2019). Impact of the feasibility study on the construction projects. In: IOP Conference Series: Materials Science and Engineering, 6–7 March 2019, Baghdad, Iraq. IOP Publishing, p. 022074
- Morse, J. M., Barrett, M., Mayan, M., Olson, K., & Spiers, J. (2002). Verification strategies for establishing reliability and validity in qualitative research. International Journal of Qualitative Methods, 1(2), pp. 13–22.
- Mudi, A. (2016). Quantity surveyor’s impact: A panacea to achieving critical success factors in PPP implementation. International Journal of Engineering Science Invention, 5(3), pp. 1–9.
- Mukherjee, M., & Roy, S. (2017). Feasibility studies and important aspect of project management. International Journal of Advanced Engineering and Management, 2(4), pp. 98–100.
- Oso Sunday, B. (2020). Management of time overrun in a selected building projects in Auchi Polytechnic, Auchi, Edo State. International Journal of Innovative Research and Advanced Studies (IJIRAS), 7(5), pp. 246–253.
- Perera, S., Zhou, L., Udeaja, C., & Victoria, M. (2016). A Comparative Study of Construction Costs and Commercial Management Services in the UK and China. RICS, London.
- Ramawela, M. E. (2017). Attracting black investment into the South African hotel sector. Masters, University of Johannesburg.
- Rose, J., & Johnson, C. W. (2020). Contextualizing reliability and validity in qualitative research: Toward more rigorous and trustworthy qualitative social science in leisure research. Journal of Leisure Research, 51(4), pp. 432–451.
- Ross, L., Greene, D., & House, P. (1977). The “False Consensus Effect”: An egocentric bias in social perception and attribution processes. Journal of Experimental Social Psychology, 13(3), pp. 279–301.
- Rwelamila, P., & Ogunlana, S. (2015). W107–Construction in Developing Countries Research Roadmap - Report for Consultation. In: International Council for Research and Innovation in Building (CIB).
- Samuel, S., Cole, G. G., & Eacott, M. J. (2020). Two independent sources of difficulty in perspective-taking/theory of mind tasks. Psychonomic Bulletin and Review, 27(6), pp. 1341–1347.
- Saunders, M., Lewis, P., & Thornhill, A. (2016). Research Methods for Business Students, 7th edn. Pearson, England.
- Shaheen, M., & Pradhan, S. (2019). Sampling in qualitative research. In: Qualitative Techniques for Workplace Data Analysis. IGI Global, pp. 25–51. Doi: 10.4018/978-1-5225-5366-3.ch002.
- Shen, L., Tam, V. W., Tam, L., & Ji, Y. (2010). Project feasibility study: The key to successful implementation of sustainable and socially responsible construction management practice. Journal of Cleaner Production, 18(3), pp. 254–259.
- Spellacy, J., Edwards, D. J., Roberts, C. J., Hayhow, S., & Shelbourn, M. (2021). An investigation into the role of the quantity surveyor in the value management workshop process. Journal of Engineering, Design and Technology, 19(2), pp. 423–445.
- Stefánsdóttir, Á. Ó. (2015). Feasibility studies in construction projects in Iceland. MSc, Reykjavik University.
- Sudhana, P. (2016). Analysis of investment decision making of a budget hotel: A case study. Masters, University of Surabaya.
- Syed Alwee, S. N. A., Salehudin, N., Mohamed Sabli, N. A., Isnaini Janipha, N. A., & Maisham, M. (2019). The importance of information in the preparation of feasibility study for construction development. Voice of Academia: Academic Series of Universiti Teknologi MARA Kedah, 14(1), pp. 64–73.
- Terblanche, R., Root, D., & Vosloo, R. (2021). Actants influencing the successful compilation of economic feasibility studies: The quantity surveyors’ perspective. (Eds). Lloyd Scott & Christopher J Neilson In: Thirty-Seventh Annual Conference, 6–7 September 2021. ARCOM, UK. p. 391.
- Van Eck, E., & Burger, M. (2016). Effective utilisation of generation Y quantity surveyors. Acta Structilia, 23(2), pp. 57–78.
- Willemse, H. (2019). An assessment of the relevance of feasibility studies in public projects in South Africa. Masters, University of Johannesburg.