Have a personal or library account? Click to login

ISM model for assessing critical productivity factors in the Jordanian construction industry post-COVID-19 pandemic

Open Access
|Jun 2024

References

  1. Abu Hammad, A. A., Ali, S. M. A., Sweis, G. J., & Sweis, R. J. (2010). Statistical analysis on the cost and duration of public building projects. Journal of Management in Engineering, 26(2), pp. 105-112.
  2. Alabbadi, G., & Agyekum-Mensah, G. (2017). An examination of the motivational factors affecting workers productivity in the Jordanian construction industry. paper presented at the International Congress on Industrial Engineering and Operations Management. Bogota, Colombia. 25-26 October, 2017.
  3. Alaghbari, W., Al-Sakkaf, A. A., & Sultan, B. (2019). Factors affecting construction labour productivity in Yemen. International Journal of Construction Management, 19(1), pp. 79-91.
  4. Alshdiefat, A. S., Sharif, A. A., Alharahsheh, A. I., Albrka, S. I., Olsson, N. O. E., Younes, M. and Bang, S. (2023), “Construction and demolition waste management in Jordan: a multifaceted perspective”, Construction Innovation, Vol. ahead-of-print No. ahead-of-print. https://doi.org/10.1108/CI-08-2022-0221.
  5. Alshdiefat, A. S. (2018). Developing an assessment model for the adoption of building information modelling to reduce the cost of change orders in the Jordanian construction industry. Doctoral dissertation, University of Salford, Manchester, UK.
  6. Anditiaman, N. M., Ratief, R. U., Rahim, I. R., & Arifuddin, R. (2019). Identification of construction productivity components in Indonesia. Case study of construction projects at the ministry of public works and housing provision (PUPR). paper presented at the 3rd International Conference on Civil and Environmental Engineering (ICCEE 2019). 29-30 August, 2019, Bali, Indonesia, p. 012146.
  7. Barbosa, F., Woetzel, J., Mischke, J., Ribeirinho, M. J., Sridhar, M., & Parsons, M., et al. (2017). Reinventing construction: A route to higher productivity. Available at https://www.mckinsey.com/~/media/mckinsey/business%20functions/operations/our%20insights/reinventing%20construction%20through%20 a%20productivity%20revolution/mgi-reinventing-construction-a-route-to-higher-productivity-full-report.pdf [accessed 20 July, 2022].
  8. Bekr, G. A. (2016). Identifying factors affecting labor productivity on construction sites in Jordan. Group, 70, p. 5.
  9. Biswas, A., Ghosh, A., Kar, A., Mondal, T., Ghosh, B., & Bardhan, P. K. (2021). The impact of COVID-19 in the construction sector and its remedial measures. Journal of Physics: Conference Series, 1797(1), p. 012054.
  10. Bsisu, K. A. D. (2020). The impact of COVID-19 pandemic on Jordanian civil engineers and construction industry. International Journal of Engineering Research and Technology, 13(5), pp. 828-830.
  11. Hasan, A., Elmualim, A., Rameezdeen, R., Baroudi, B., & Marshall, A. (2018). An exploratory study on the impact of mobile ICT on productivity in construction projects. Built Environment Project and Asset Management, 8(3), pp. 320-332.
  12. Hesna, Y., Sunaryati, J., & Hidayati, A. (2021). COVID-19 pandemic impact: An identification of the cause of cost overrun in construction project. paper presented at the International Conference on Disaster Mitigation and Management (ICDMM 2021), E3S Web of Conferences, Volume 331, article number 01014. 30th September to 1st October 2021, Padang, Malaysia.
  13. Hiyassat, M. A., Hiyari, M. A., & Sweis, G. J. (2016). Factors affecting construction labour productivity: A case study of Jordan. International Journal of Construction Management, 15(2), pp. 138-149.
  14. Jarkas, A. M. (2015). Factors influencing labour productivity in Bahrain’s construction industry. International Journal of Construction Management, 15(1), pp. 94-108.
  15. Jarkas, A. M., & Bitar, C. G. (2012). Factors affecting construction labour productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), pp. 811-820.
  16. Jung, S., Lee, S., & Yu, J. (2021). Identification and prioritization of critical success factors for off-site construction using ISM and MICMAC analysis. Sustainability, 13(1), p. 8911.
  17. Karin, O., Bar-On, Y. M., Milo, T., Katzir, I., Mayo, A., & Korem, Y., et al. (2020). Adaptive cyclic exit strategies from lockdown to suppress COVID-19 and allow economic activity. Available at https://www.medrxiv.org/content/medrxiv/early/2020/04/15/2020.04.04.20053579.full.pdf [accessed 10 July, 2022].
  18. Kasih, R. P. A., & Adi, T. J. W. (2019). Construction project productivity assessment model and its implementation in Indonesia construction industry. paper presented at the International Conference on Sustainable Civil Engineering Structures and Construction Materials (SCESCM 2018), MATEC Web of Conferences, Volume 258, Article number 02026. 5th to 7th September 2018, Yogyakarta, Indonesia.
  19. Krueger, R. A., & Casey, M. A. (2014). Focus Groups: A Practical Guide for Applied Research, 5th edn. Sage, UK.
  20. Mahamid, I. (2013). Contractors perspective toward factors affecting labor productivity in building construction. Engineering, Construction and Architectural Management, 20(5), pp. 446-460.
  21. Marinelli, M., Konanahalli, A., Dwarapudi, R., & Janardhanan, M. (2022). Assessment of barriers and strategies for the enhancement of off-site construction in India: An ISM approach. Sustainability, 14(1), p. 6595.
  22. Mathiyazhagan, K., & Haq, A. N. (2013). Analysis of the influential pressures for green supply chain management adoption—an Indian perspective using interpretive structural modeling. The International Journal of Advanced Manufacturing Technology, 68(1), pp. 817-833.
  23. Mattarneh, S. (2015). A study of factors causing cost overruns in Jordanian construction industry. Master dissertation, Al-Isra University, Amman, Jordan.
  24. Quezon, E. T., & Ibanez, A. G. (2021). Effect of COVID-19 pandemic in construction labor productivity: A quantitative and qualitative data analysis. American Journal of Civil Engineering and Architecture, 9(1), pp. 23-33.
  25. Rhodes, C. (2019). Construction industry: Statistics and policy. Available at https://researchbriefings.files.parliament.uk/documents/SN01432/SN01432.pdf [accessed 2 August, 2022].
  26. Saunders, M., Lewis, P., & Thornhill, A. (2016). Research Methods for Business Students, 7th edn. Pearson, UK.
  27. Sihombing, L. B., Malczynski, L., Jacobson, J., Soeparto, H. G., & Saptodewo, D. T. (2020). An analysis of the spread of COVID-19 and its effects on Indonesia’s economy: A dynamic simulation estimation. Available at https://www.researchgate.net/profile/Lukas-Sihombing/publication/341201941_An_ Analysis_of_the_Spread_of_COVID-19_and_its_Effects_on_ Indonesia’S_Economy_A_Dynamic_Simulation_Estimation/links/5eb37b4f92851cbf7fadb35e/An-Analysis-of-the-Spread-of-COVID-19-and-its-Effects-on-IndonesiaS-Economy-A-Dynamic-Simulation-Estimation.pdf [accessed 15 August, 2022].
  28. Stewart, D. W., & Shamdasani, P. N. (2014). Focus Groups: Theory and Practice, 3rd edn. Sage, UK.
  29. Sweis, G., Sweis, R., Hammad, A. A., & Shboul, A. (2008). Delays in construction projects: The case of Jordan. International Journal of Project Management, 26(6), pp. 665-674.
DOI: https://doi.org/10.2478/otmcj-2024-0006 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 81 - 92
Submitted on: Sep 14, 2023
Accepted on: Apr 5, 2024
Published on: Jun 11, 2024
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 times per year

© 2024 Ala’a Saleh Alshdiefat, published by University of Zagreb
This work is licensed under the Creative Commons Attribution 4.0 License.