Have a personal or library account? Click to login

Impact of project procurement systems on performance of Rwandan building construction projects

Open Access
|Nov 2023

References

  1. Abdul Rashid, R., Mat Taib, I., Wan Ahmad, W. B., Nasid, M. A., Wan Ali, W. N., & Mohd Zainordin, Z. (2006). Effect of procurement systems on the performance of construction projects. In: Conference, June 21-24, Padang, Indonesia, pp. 1–13.
  2. Alaeddin, G., & Nuhu, B. (2016). The impact of design-bid-build procurement methods on project performance in Libya. KICEM Journal of Construction Engineering and Project Management, 6(2), pp. 16–23.
  3. Alhazmi, T., & McCaffer, R. (2000). Procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176–184.
  4. Ameyaw, C. (2009). Comparative performance evaluation of the traditional design-bid-build(DBB) and design-build (DB) procurement systems in Ghana. B.Sc. in quantity surveying dissertation, Federal University of Technology, Akure, Ghana.
  5. Ashworth, A. (2001). Contractual Procedures in the Construction Industry, 4th edn. Longman, England.
  6. Barkley, B., & Saylor, J. (1994). Customer-Driven Project Management. McGraw-Hill, New York, USA.
  7. Caccamese, A., & Bragantini, D. (2012). Beyond the iron triangle: Year zero. In: Project Management Institute Global Congress Proceedings, May 9. Project Management Institute, Marseille, France.
  8. Chandrashekhar, R. P., & Mahaboobali, N. (2017). Study on procurement method selection procedure in construction industry. International Research Journal of Engineering and Technology, 4(8), pp. 340–348.
  9. Ghulam, A. N., & Noel, P. (2015). Comparative performance evaluation of design-build and traditional procurement systems for highway projects in Afghanistan. In: Proceeding of the 6th International Conference on Engineering, Project, and Production Management, September 2-10. Griffiths University, Queensland, Australia.
  10. Hogg, K., & Morledge, R. (1995). Risks and design and build: Keeping meaningful perspective. Chartered Surveyor Monthly, 14(7), pp. 32–33.
  11. Ling, Y. Y., Lok, S., & Tan, E. S. (2001). Design-Build Projects: A Comparison of Views between South Australia and Singapore. CIB World Building Congress, Wellington, New Zealand, April 1-11.
  12. Luis, F. A., Rodrigo, R., & Alfredo, S. (1999). Evaluation and improvement of the procurement process in construction projects. In: Proceedings IGLC-7. University of California, Berkeley, USA, July 26-28.
  13. Masterman, J. W. (2002). An Introduction to Building Procurement, 2nd edn. Spon Press, New York.
  14. Mohd, N. M. N., Nazim, B., & Ahmad, Y. B. (2014). Impact of fragmentation issue in construction industry: An overview. In proceedings of MATEC Web of Conferences, 15(01009), 1–8.
  15. Musirikare, M. A., & Kure, W. J. (2016). Delay factors in building construction projects in Rwanda. ABC Journal of Advanced Research, 5(1), pp. 21–34.
  16. Musoni, N., Gwaya, A., & Wanyona, G. (2020). Influence of procurement systems on construction projects in Rwanda. International Journal of Innovative Science and Modern Engineering, 6(5), pp. 6–12.
  17. Office of the Auditor General of State Finances. (2018). Report of the auditor of state finances for the year ended, Rwanda. Available at https//www.oag.gov.rw/fileadmin/user-upload/ Financial reports/AnnualReport-june-2017-ExecutieSummary.pdf [accessed 30 June, 2017].
  18. Oladinrin, O. T., Olatunji, S. O., & Hamza, B. T. (2013). Effect of selected procurement systems on building project performance in Nigeria. International Journal of Sustainable Construction Engineering and Technology, 4(1), pp. 48–62.
  19. Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (PMBOK). Project Management Institute, Newton Square, USA.
  20. Ron, W. (2012). Changing the construction procurement culture to improve project outcomes. In: International Conference on Facilities Management, Procurement Systems and Public Private Partnerships, CIB W070, W092 AND TG72, January 25, Cape Town, South Africa.
  21. Sanvido, V., Konchar, M., & Moore, S. (1997). Comparison of project delivery systems. In: ASCE Construction Congress Proceedings, October 5. American Society of Civil Engineers, Minnesota, United State.
  22. Smith, M. A., Hoetzlein, S., & Adsit, R. A. (1992). Design/build. Landscape Architecture, 82(11), pp. 18–20.
  23. Tarek, H. (2002). Computer Based Construction Project Management. Prentice Hall, Ohio.
  24. Tavakol, M and Dennick, R. (2011). Making Sense of Cronbach’s Alpha. International Journal of Medical Education, 2, 53–55.
  25. Umuhoza, E., & An, S. H. (2019). Delay factors in building construction projects in Rwanda. Journal of Korea Institute of Building Construction, 19(5), pp. 467–475.
  26. Umuhoza, E., Bitamba, B. F., & An, S. H. (2021). Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, pp. 1–12. Available at https://doi.org/10.1080/15623599.2021.1967576 [Accessed 23 August 2021]
  27. Yamane, T. (1973). Statistics: An Introductory Analysis, 3rd edn. Harper and Row, New York.
  28. Yates, J., & Eskander, A. (2002). Construction total project management planning issues. International Journal of Project Management, 33(1), pp. 37–48.
DOI: https://doi.org/10.2478/otmcj-2023-0016 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 221 - 232
Submitted on: Aug 8, 2022
Accepted on: Nov 25, 2022
Published on: Nov 30, 2023
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2023 Umuhoza Esperance, An Sung-Hoon, published by University of Zagreb
This work is licensed under the Creative Commons Attribution 4.0 License.