References
- Abdul Rashid, R., Mat Taib, I., Wan Ahmad, W. B., Nasid, M. A., Wan Ali, W. N., & Mohd Zainordin, Z. (2006). Effect of procurement systems on the performance of construction projects. In: Conference, June 21-24, Padang, Indonesia, pp. 1–13.
- Alaeddin, G., & Nuhu, B. (2016). The impact of design-bid-build procurement methods on project performance in Libya. KICEM Journal of Construction Engineering and Project Management, 6(2), pp. 16–23.
- Alhazmi, T., & McCaffer, R. (2000). Procurement system selection model. Journal of Construction Engineering and Management, 126(3), pp. 176–184.
- Ameyaw, C. (2009). Comparative performance evaluation of the traditional design-bid-build(DBB) and design-build (DB) procurement systems in Ghana. B.Sc. in quantity surveying dissertation, Federal University of Technology, Akure, Ghana.
- Ashworth, A. (2001). Contractual Procedures in the Construction Industry, 4th edn. Longman, England.
- Barkley, B., & Saylor, J. (1994). Customer-Driven Project Management. McGraw-Hill, New York, USA.
- Caccamese, A., & Bragantini, D. (2012). Beyond the iron triangle: Year zero. In: Project Management Institute Global Congress Proceedings, May 9. Project Management Institute, Marseille, France.
- Chandrashekhar, R. P., & Mahaboobali, N. (2017). Study on procurement method selection procedure in construction industry. International Research Journal of Engineering and Technology, 4(8), pp. 340–348.
- Ghulam, A. N., & Noel, P. (2015). Comparative performance evaluation of design-build and traditional procurement systems for highway projects in Afghanistan. In: Proceeding of the 6th International Conference on Engineering, Project, and Production Management, September 2-10. Griffiths University, Queensland, Australia.
- Hogg, K., & Morledge, R. (1995). Risks and design and build: Keeping meaningful perspective. Chartered Surveyor Monthly, 14(7), pp. 32–33.
- Ling, Y. Y., Lok, S., & Tan, E. S. (2001). Design-Build Projects: A Comparison of Views between South Australia and Singapore. CIB World Building Congress, Wellington, New Zealand, April 1-11.
- Luis, F. A., Rodrigo, R., & Alfredo, S. (1999). Evaluation and improvement of the procurement process in construction projects. In: Proceedings IGLC-7. University of California, Berkeley, USA, July 26-28.
- Masterman, J. W. (2002). An Introduction to Building Procurement, 2nd edn. Spon Press, New York.
- Mohd, N. M. N., Nazim, B., & Ahmad, Y. B. (2014). Impact of fragmentation issue in construction industry: An overview. In proceedings of MATEC Web of Conferences, 15(01009), 1–8.
- Musirikare, M. A., & Kure, W. J. (2016). Delay factors in building construction projects in Rwanda. ABC Journal of Advanced Research, 5(1), pp. 21–34.
- Musoni, N., Gwaya, A., & Wanyona, G. (2020). Influence of procurement systems on construction projects in Rwanda. International Journal of Innovative Science and Modern Engineering, 6(5), pp. 6–12.
- Office of the Auditor General of State Finances. (2018). Report of the auditor of state finances for the year ended, Rwanda. Available at https//www.oag.gov.rw/fileadmin/user-upload/ Financial reports/AnnualReport-june-2017-ExecutieSummary.pdf [accessed 30 June, 2017].
- Oladinrin, O. T., Olatunji, S. O., & Hamza, B. T. (2013). Effect of selected procurement systems on building project performance in Nigeria. International Journal of Sustainable Construction Engineering and Technology, 4(1), pp. 48–62.
- Project Management Institute. (2013). A Guide to the Project Management Body of Knowledge (PMBOK). Project Management Institute, Newton Square, USA.
- Ron, W. (2012). Changing the construction procurement culture to improve project outcomes. In: International Conference on Facilities Management, Procurement Systems and Public Private Partnerships, CIB W070, W092 AND TG72, January 25, Cape Town, South Africa.
- Sanvido, V., Konchar, M., & Moore, S. (1997). Comparison of project delivery systems. In: ASCE Construction Congress Proceedings, October 5. American Society of Civil Engineers, Minnesota, United State.
- Smith, M. A., Hoetzlein, S., & Adsit, R. A. (1992). Design/build. Landscape Architecture, 82(11), pp. 18–20.
- Tarek, H. (2002). Computer Based Construction Project Management. Prentice Hall, Ohio.
- Tavakol, M and Dennick, R. (2011). Making Sense of Cronbach’s Alpha. International Journal of Medical Education, 2, 53–55.
- Umuhoza, E., & An, S. H. (2019). Delay factors in building construction projects in Rwanda. Journal of Korea Institute of Building Construction, 19(5), pp. 467–475.
- Umuhoza, E., Bitamba, B. F., & An, S. H. (2021). Causes and preventive strategies of scope creep for building construction projects in democratic republic of Congo and Rwanda. International Journal of Construction Management, pp. 1–12. Available at https://doi.org/10.1080/15623599.2021.1967576 [Accessed 23 August 2021]
- Yamane, T. (1973). Statistics: An Introductory Analysis, 3rd edn. Harper and Row, New York.
- Yates, J., & Eskander, A. (2002). Construction total project management planning issues. International Journal of Project Management, 33(1), pp. 37–48.