Have a personal or library account? Click to login

Effective pre-qualification systems – Are they essential for minimising delays on road projects?

Open Access
|Nov 2023

References

  1. Alzober, W., & Yaakub, A. R. (2014). Integrated model for selection the prequalification criteria of contractor. Lecture Notes on Software Engineering, 2(3), p. 233.
  2. Araújo, M., Alencar, L., & Mota, C. (2015). Contractor selection in construction industry: A multicriteria model. In: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 06-09 December 2015, Singapore, pp. 519–523.
  3. Balubaid, M., & Alamoudi, R. (2015). Application of the analytical hierarchy process (AHP) to multi-criteria analysis for contractor selection. American Journal of Industrial and Business Management, 5(09), p. 581.
  4. Doraisamy, S. V., Akasah, Z. A., & Yunus, R. (2015). An overview on the issue of delay in the construction industry. In: InCIEC 2014, pp. 313–319. doi: 10.1007/978-981-287-290-6_27.
  5. El-khalek, H. A., Aziz, R. F., & Morgan, E. S. (2019). Identification of construction subcontractor prequalification evaluation criteria and their impact on project success. Alexandria Engineering Journal, 58, pp. 217–223.
  6. Gransberg, D., Dillon, W. D., Reynolds, L., & Boyd, J. (1999). Quantitative analysis of partnered project performance. Journal of Construction Engineering and Management, 125(3), 161–166.
  7. Hatush, Z., & Skitmore, M. (1997). Criteria for contractor selection. Construction Management & Economics, 15(1), pp. 19–38.
  8. Ibadov, N. (2015). Contractor selection for construction project, with the use of fuzzy preference relation. Procedia Engineering, 111, pp. 317–323. doi: 10.1016/j.proeng.2015.07.095.
  9. Ioannou, P., & Awwad, R. (2010). Below-average bidding method. Journal of Construction Engineering and Management, ASCE, 136(9), pp. 936–946. doi: 10.1061/(ASCE)CO.1943-7862.0000202.
  10. Lo T. Y., Fung I. W. & Tung K. C. (2006), “Construction delays in Hong Kong civil engineering projects”, Journal of construction engineering and management, 132(6), pp.636–649.
  11. Kapote, M. M., & Pimplikar, S. S. (2014). Suggested mathematical model for specialized subcontractor prequalification scrutiny and ultimately the performance prediction. IOSR Journal of Mechanical and Civil Engineering, 11(3), pp. 43–51.
  12. Kolekar, P. B., & Kanade, G. N. (2014). Contractor selection in construction industry using fuzzy-logic system. International Journal of Engineering Research & Technology, 3(11), pp. 1087–1093.
  13. Plebankiewicz, E. (2009). Contractor prequalification model using fuzzy sets. Journal of Civil Engineering and Management, 15(4), pp. 377–385.
  14. Puri, D., & Tiwari, S. (2014). Evaluating the criteria for contractors’ selection and bid evaluation. International Journal of Engineering Science Invention, 3(7), pp. 44–48.
  15. Rashvand, P., Abd Majid, M. Z., Baniahmadi, M., & Ghavamirad, F. (2015). Contractor selection at prequalification stage: Current evaluation and shortcomings. Jurnal Teknologi, 77(16), pp. 81–89.
  16. Waara, F., & Bröchner, J. (2006). Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, ASCE, 132(8), p. 797.
  17. Zailani, S., Ariffin, H., Moeinzadeh, S., & Iranmanesh, M. (2016). The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance. Journal of Science and Technology Policy Management, 7(3), pp. 346–368.
DOI: https://doi.org/10.2478/otmcj-2023-0015 | Journal eISSN: 1847-6228 | Journal ISSN: 1847-5450
Language: English
Page range: 213 - 220
Submitted on: Jun 19, 2022
Accepted on: Nov 25, 2022
Published on: Nov 27, 2023
Published by: University of Zagreb
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2023 Mangesh Kapote, Pratik Patil, Sunil Pimplikar, published by University of Zagreb
This work is licensed under the Creative Commons Attribution 4.0 License.