Alzober, W., & Yaakub, A. R. (2014). Integrated model for selection the prequalification criteria of contractor. Lecture Notes on Software Engineering, 2(3), p. 233.
Araújo, M., Alencar, L., & Mota, C. (2015). Contractor selection in construction industry: A multicriteria model. In: IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 06-09 December 2015, Singapore, pp. 519–523.
Balubaid, M., & Alamoudi, R. (2015). Application of the analytical hierarchy process (AHP) to multi-criteria analysis for contractor selection. American Journal of Industrial and Business Management, 5(09), p. 581.
Doraisamy, S. V., Akasah, Z. A., & Yunus, R. (2015). An overview on the issue of delay in the construction industry. In: InCIEC 2014, pp. 313–319. doi: 10.1007/978-981-287-290-6_27.
El-khalek, H. A., Aziz, R. F., & Morgan, E. S. (2019). Identification of construction subcontractor prequalification evaluation criteria and their impact on project success. Alexandria Engineering Journal, 58, pp. 217–223.
Gransberg, D., Dillon, W. D., Reynolds, L., & Boyd, J. (1999). Quantitative analysis of partnered project performance. Journal of Construction Engineering and Management, 125(3), 161–166.
Ibadov, N. (2015). Contractor selection for construction project, with the use of fuzzy preference relation. Procedia Engineering, 111, pp. 317–323. doi: 10.1016/j.proeng.2015.07.095.
Ioannou, P., & Awwad, R. (2010). Below-average bidding method. Journal of Construction Engineering and Management, ASCE, 136(9), pp. 936–946. doi: 10.1061/(ASCE)CO.1943-7862.0000202.
Lo T. Y., Fung I. W. & Tung K. C. (2006), “Construction delays in Hong Kong civil engineering projects”, Journal of construction engineering and management, 132(6), pp.636–649.
Kapote, M. M., & Pimplikar, S. S. (2014). Suggested mathematical model for specialized subcontractor prequalification scrutiny and ultimately the performance prediction. IOSR Journal of Mechanical and Civil Engineering, 11(3), pp. 43–51.
Kolekar, P. B., & Kanade, G. N. (2014). Contractor selection in construction industry using fuzzy-logic system. International Journal of Engineering Research & Technology, 3(11), pp. 1087–1093.
Puri, D., & Tiwari, S. (2014). Evaluating the criteria for contractors’ selection and bid evaluation. International Journal of Engineering Science Invention, 3(7), pp. 44–48.
Rashvand, P., Abd Majid, M. Z., Baniahmadi, M., & Ghavamirad, F. (2015). Contractor selection at prequalification stage: Current evaluation and shortcomings. Jurnal Teknologi, 77(16), pp. 81–89.
Waara, F., & Bröchner, J. (2006). Price and nonprice criteria for contractor selection. Journal of Construction Engineering and Management, ASCE, 132(8), p. 797.
Zailani, S., Ariffin, H., Moeinzadeh, S., & Iranmanesh, M. (2016). The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance. Journal of Science and Technology Policy Management, 7(3), pp. 346–368.