References
- Akintan, O. A., & Morledge, R. (2013). Improving the collaboration between main contractors and subcontractors within traditional construction procurement. Journal of Construction Engineering, 2013, pp. 1–11. doi: 10.1155/2013/281236.
- Ali, A. (2008). Integrative Mechanisms in the Design Process of Building Refurbishment Projects. Universiti Teknologi MARA, Shahalam, Selangor, Malaysia.
- Ali, A. (2010). Design information in managing refurbishment projects in Malaysia. The International Journal of Physical Sciences, 5, pp. 768–773.
- Ali, A. S. (2014). Complexity in managing refurbishment design process : Malaysian experience. Building Surveying, Facilities Management and Engineering, 15, pp. 1–5. doi: 10.1051/matecconf/20141501030.
- Ali, A. S., & Au-Yong C. P. (2021). Risk factors in the refurbishment design process: The case of Malaysia. International Journal of Building Pathology and Adaptation, 40(4), pp. 622–635. doi: 10.1108/IJBPA-01-2021-0005.
- Ali, A. S., Peng, A. Y. C., & Ling, S. C. (2014). Managing refurbishment projects through selection of procurement system: The case of Malaysia. European Journal of Sustainable Development, 3(4), pp. 311–322. doi: 10.14207/ejsd.2014. v3n4p311.
- Ali, A., & Zakaria, R. (2012). Complexity of statutory requirements: Case study of refurbishment projects in Malaysia. Journal of Building Performance, 3(1), pp. 49–54.
- Al-Sedairy, S. T. (1994). Management of conflict. International Journal of Project Management, 12(3), pp. 143–151. doi: 10.1016/0263-7863(94)90029-9.
- Ansari, R., Khalilzadeh, M., Taherkhani, R., Antucheviciene, J., Migilinskas, D., & Moradi, S. (2022). Performance prediction of construction projects based on the causes of claims: A system dynamics approach. Sustainability, 14(7), p. 4138. doi: 10.3390/su14074138.
- Aziz, R. F., & Abdel-Hakam, A. A. (2016). Exploring delay causes of road construction projects in Egypt. Alexandria Engineering Journal, 55(2), pp. 1515–1539. doi: 10.1016/j.aej.2016.03.006.
- Baudrit, C., Taillandier, F., Tran, T. T. P., & Breysse, D. (2019). Uncertainty processing and risk monitoring in construction projects using hierarchical probabilistic relational models. Computer-Aided Civil and Infrastructure Engineering, 34(2), pp. 97–115. doi: 10.1111/mice.12391.
- Bekele, A. (2015). Alternative dispute resolution methods in construction industry : An assesment of ethiopian situation. PhD thesis, School of Graduate Studies Addis Ababa University Faculity of Technology, pp. 1–147.
- Bernstein, H. M., Joneset, S. A., Russo, M. A., Laquidara, D., Taylor, W., Ramos, J., & Lorenz, A. (2014). Managing uncertainty and expectations in building design and construction. 1st edn. In: Bernstein, H. M., et al. (eds.), SmartMarket Report. Bedford, McGraw-Hill Construction.
- Bhattacherjee, A. (2012). Social Science Research: Principles, Methods, and Practices. Textbooks Collection, University of South Florida,Tampa, USA.
- Bulleit, W. M. (2008). Uncertainty in structural engineering. Practice Periodical on Structural Design and Construction, 13(1), pp. 24–30. doi: 10.1061/(ASCE)1084-0680(2008) 13:1(24).
- Camelo-Ordaz, C., García-Cruz, J., & Sousa-Ginel, E. (2014). Antecedents of relationship conflict in top management teams. International Journal of Conflict Management, 25(2), pp. 124–147. doi:10.1108/IJCMA-06-2012-0054.
- Cao, J., Liu, C., Wu, G., Zhao, X., & Jiang, Z. (2020). Work–family conflict and job outcomes for construction professionals: The mediating role of affective organizational commitment. International Journal of Environmental Research and Public Health, 17(4), p. 1443. doi: 10.3390/ijerph17041443.
- Cerić, A. (2021). Reducing information asymmetry and building trust in projects using blockchain technology. Gradjevinar, 73(10), pp. 967–978. doi: 10.14256/JCE.3310.2021.
- Charkhakan, M. H., & Heravi, G. (2022). Quantifying the predictability and preventability of conflicts between construction project parties. Engineering, Construction and Architectural Management, 30(19), pp. 1932–1950. doi: 10.1108/ECAM-11-2019-0651.
- Cheung, S. O., & Pang, K. H. Y. (2013). Anatomy of construction disputes. Construction Engineering and Management, 139, pp. 15–23. doi: 10.1061/(ASCE)CO.1943-7862.0000532.
- Chong, H. Y., & Zin, R. M. (2010). A case study into the language structure of construction standard form in Malaysia. International Journal of Project Management, 28(6), pp. 601–608. doi: 10.1016/j.ijproman.2009.09.008.
- Dada, M. O. (2013). Conflicts in construction projects procured under traditional and integrated systems: A correlation analysis conflicts in construction projects procured under traditional and integrated methods: A correlation analysis. International Journal of Construction Supply Chain Management, 3(1), pp. 1–15. doi: 10.14424/ijcscm301013-01-15.
- Diab, M., Mehany, M. (2021). Contingency Use and Project Delivery Influence on Infrastructure Project Risk Assessment. In: Ahmed, S.M., Hampton, P., Azhar, S., D. Saul, A. (eds) Collaboration and Integration in Construction, Engineering, Management and Technology. Advances in Science, Technology & Innovation. Springer, Cham. pp. 589–592,https://doi.org/10.1007/978-3-030-48465-1_97.
- Doran, D., et al. (2009). Refurbishment and Repair in Construction Whittles Publishing, Dunbeath, Scotland, UK, pp. 11–314, IBSN 9781904445555.
- Egbu, C. (1994). Management education and training for construction work within the construction industry. A Ph.D thesis submitted to the department of civil engineering and construction,university of Salford, Salford, UK.
- Gref, L. G. (2010). The Rise and Fall of American Technology. Algora Pub, New York, USA.
- Hair, Jr, J. F, Sarstedt, M., Hopkins, L., & Kuppelwieser, V. G. (2014). A primer on partial least squares structural equation modeling (PLS-SEM): An emerging tool in business research. European Business Review, 26(2), pp. 106–121.doi: 10.1108/EBR-10-2013-0128.
- Harmon, K. M. J. (2003a). Conflicts between owner and contractors: Proposed intervention process. Journal of Management in Engineering, 19(3), pp. 121–125. doi: 10.1061/(ASCE)0742-597X(2003)19:3(121).
- Harmon, K. M. J. (2003b). Resolution of construction disputes: A review of current methodologies. Leadership & Management in Engineering, 3(4), pp. 187–201. doi: 10.1061/(ASCE)1532-6748(2003)3:4(187).
- Harter, H., Singh, M. M., Schneider-Marin, P., Lang, W., & Geyer, P. (2020). Uncertainty analysis of life cycle energy assessment in early stages of design. Energy and Buildings, 208, p. 109635. doi: 10.1016/j.enbuild.2019.109635.
- Harvett, C. M. (2013). A study of uncertainty and risk management practice relative to perceived project complexity. Doctoral Dissertations, p. 265.
- Holm, M. G. (2000). Service management in housing refurbishment: A theoretical approach. Construction Management and Economics, 18(5), pp. 525–533. doi: 10.1080/014461900407338.
- Juan, Y.-K., Perng, Y.-H., Castro-Lacouture, D., & Lu, K.-S. (2009). Housing refurbishment contractors selection based on a hybrid fuzzy-QFD approach. Automation in Construction, 18(2), pp. 139–144. doi: 10.1016/j.autcon.2008.06.001.
- Kamari, A., Jensen, S. R., Corrao, R., & Kirkegaard, P. H. (2019). A holistic multi-methodology for sustainable renovation. International Journal of Strategic Property Management, 23(1), pp. 50–64. doi: 10.3846/ijspm.2019.6375.
- Kang, B, Price, A D F, Thorpe, A., & Edum-Fotwe, F T (2004) Developing a systems approach for managing ethics in construction project environments. ARCOM Conference, Heriot Watt University. Association of Researchers in Construction Management, (2), 367–75.
- Kerzner, H. H. R. (2013). Project management: A systems approach to planning, scheduling, and controlling. John Wiley & Sons, Inc.Hoboken, New Jersey Published simultaneously in Canada. doi: 10.1016/0377-2217(82)90164-3.
- Khahro, S. H., & Ali, T. H. (2014). Causes leading to conflicts in construction projects : A viewpoint of Pakistani construction industry. International Conference on challenges in IT, Engineering and Technology (ICCIET’2014) July 17-18, 2014, Phuket (Thailand), pp. 116–121.
- Kim, J. J., Miller, J. A., & Kim, S. (2020). Cost impacts of change orders due to unforeseen existing conditions in building renovation projects. Journal of Construction Engineering and Management, 146(8), p. 04020094. doi: 10.1061/(asce) co.1943-7862.0001888.
- Korytárová, J., Hanák, T., & Lukele, P. E. (2017). Economic efficiency of brownfield regeneration: Study of South Moravian projects. Scientific Review Engineering and Environmental Sciences, 26(2), pp. 151–158. doi: 10.22630/PNIKS.2017.26.2.13.
- Kromidha, E., Spence, L. J., Anastasiadis, S., & Dore, D. (2019). A longitudinal perspective on sustainability and innovation governmentality: The case of the olympic games as a mega-event. Journal of Management Inquiry, 28(1), pp. 77–93. doi: 10.1177/1056492617711585.
- Lee, C. Won, J. W., Jang, W., Jung, W., Han, S. H., & Kwak, Y. H. (2017). Social conflict management framework for project viability: Case studies from Korean megaprojects. International Journal of Project Management, 35(8), pp. 1683–1696. doi: 10.1016/j.ijproman.2017.07.011.
- Lee, L. A., Jr., & Polkinghorn. B. (2008). Managing conflict in construction megaprojects: Leadership and third-party principles. Conflict Resolution Quarterly, 26(2), pp. 167–198. doi: 10.1002/crq.229.
- Liu, T. (2014). Conflicting Objectives in Interfaces of Construction Project. Norwegian University of Science and Technology, Trondheim, Norway.
- Lumineau, F., Eckerd, V., & Handley, S. (2015) Inter-organizational conflicts. Journal of Strategic Contracting and Negotiation, 1(1), pp. 42–64. doi: 10.1177/2055563614568493.
- Mahamid, I. (2016). Micro and macro level of dispute causes in residential building projects: Studies of Saudi Arabia. Journal of King Saud University - Engineering Sciences, 28(1), pp. 12–20. doi: 10.1016/J.JKSUES.2014.03.002.
- Teixeira, J. M. C., Minasowicz, A., Zavadskas, E. K., Ustinovichius, L., Migilinskas, D., Armiñana, E. P., Nowak, P. O., & Grabiec, M. (2006). Training needs in construction project management : A survey of 4 countries of the EU. Journal of Civil Engineering and Management, 12(3), pp. 237–245. https://doi.org/10.3846/13923730.2006.9636398.
- Manuel, J. et al. (2016). Training needs in construction project management: A survey of 4 countries of the EU. Journal of Civil Engineering and Management, 3730(May), pp. 237–245. doi:10.1080/13923730.2006.9636398.
- Mokariantabari, M., Adnan, H., Hussin, M. A. J., Abidin, Z. Z., Baharuddin, H. E. A., & Ismail, W. N. W. (2019). Assessment of complexity factors in briefing stage of refurbishment projects in Malaysia. IOP Conference Series: Earth and Environmental Science, 385(1), p. 012052. doi: 10.1088/1755-1315/385/1/012052.
- Moura, H., & Teixeira, J. (2010). Managing stakeholders conflicts. Construction Stakeholder Management, pp. 286–316. https://api.semanticscholar.org/CorpusID:167140539
- Mustafa, N. K. F. (2007). Building Refurbishment Project in Malaysia. Universiti Teknologi Malaysia,Skudai, Johor, Malaysia.
- Narh, O. C., Owusu, E., Oduro-Apeatu, K., & Narh, J T.-W. (2015). An exploratory study of professional conflicts and disputes within the construction industry. International Journal of Managerial Studies and Research, 3(12), pp. 44–65.
- Noori, A., & Mokariantabari, M. (2019a). Inter-organizational integration (IOI) in building refurbishment projects; An exploratory factor analysis (EFA) approach. International Journal of Scientific & Engineering Research, 10(11), p. 1361.
- Noori, A., & Mokariantabari, M. (2019b). Uncertainties in building refurbishment projects; an exploratory factor analysis (EFA) approach. International Journal of Scientific & Engineering Research, 10(11), pp. 1065–1068.
- Noori, A., Nafisi, N., & Mokariantabari, M. (2021). Inter-organizational conflict (IOC) in building refurbishment projects; an exploratory factor analysis (EFA) approach. Journal of Construction Research, 2(1), pp. 29–36. doi: 10.30564/jcr.v2i1.2732.
- Noori, A., Saruwono, M., Adnan, H., & Rahmat, I. (2016). Conflict, complexity, and uncertainty in building refurbishment projects. In: InCIEC 2015. Springer, Singapore, pp. 251–258. doi: 10.1007/978-981-10-0155-0_24.
- Ntiyakunze, S. K. (2011). Conflicts in Building Projects in Tanzania : Analysis of Causes and Management Approaches. Royal Institute of Technology (KTH), Stockholm, Sweden.
- Nutt, B., McLennan, P., & Walters, R. (1998). Refurbishing Occupied Buildings: The Management of Risk Under the CDM Regulations. Thomas Telford, Leeds, UK.
- Ofori, G. (2013). Conflict in construction. Construction Management and Economics, 31(5), pp. 497–501. doi: 10.1080/01446193.2013.767465.
- Okeil, A. M., et al. (2013). Enforce ability of limitation of liability clauses in engineering contracts. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, pp. 128–135. 5(3), https://doi.org/10.1061/(ASCE)LA. 1943-4170.0000125.
- Osei-Kyei, R., Chan, A. P. C., Yu, Y., Chen, C., & Dansoh, A. (2019). Root causes of conflict and conflict resolution mechanisms in public-private partnerships: Comparative study between Ghana and China. Cities, 87, pp. 185–195. doi: 10.1016/j.cities.2018.10.001.
- Pallant, J. (2020). SPSS Survival Manual: A step by step guide to data analysis using IBM SPSS (7th ed.). McGraw-Hill, Open University Press, London, UK. https://doi.org/10.4324/9781003117452
- Rahmat, I. (1997). The Planning and Control Process of Refurbishment Projects. University College London, London, UK.
- Rahmat, I. (2008). Managing Refurbishment Projects. Pusat Penerbitan Universiti, Universiti Teknologi MARA, Shah Alam, Malaysia.
- Ranasinghe, U., Jefferies, M., Davis, P., & Pillay, M. (2021). Conceptualizing project uncertainty in the context of building refurbishment safety: A systematic review. Buildings, 11(3), pp. 1–15. doi: 10.3390/buildings11030089.
- Sekaran, U. (2019). Research methods for business: A skill building approach. In: McFadden, P. (ed.), John Wiley & Sons, Inc., New York.
- Sezer, A. A. (2017). Factors influencing building refurbishment site managers’ waste management efforts. Journal of Facilities Management, 15(4), pp. 318–334. doi: 10.1108/JFM-10-2016-0041.
- Sheth, A. Z., et al. (2010). A framework for refurbishment of health facilities. HaCIRIC International Conference 2010, Edinburgh, UK.https://api.semanticscholar.org/CorpusID:55463651.
- Tonder, C. V., Havenga, W., & Visagie, J. (2008). The causes of conflict in public and private Sector’, Managing Global Transitions, 6(4), pp. 373–401.
- Tzortzopoulos, P., Kagioglou, M., & Koskela, L. (2020). Lean Construction: Core Concepts and New Frontiers. CRC Press, New York. Available at: https://books.google.com.au/books?id=eTj3DwAAQBAJ.
- Vaux, J. S., & Kirk, W. M. (2014). Relationship conflict in construction management and how it affects performance and profit. Journal of Construction Engineering and Management, 144(6) pp.6. https://doi.org/10.1002/crq.21286
- Vaysburd, A. M., Bissonnette, B., & von Fay. K. F. (2014). Compatibility Issues in Design and Implementation of Concrete Repairs and Overlays. Denver, Colorado.
- Volk, R., Stengel, J., & Schultmann, F. (2014). Building information modeling (BIM) for existing buildings – Literature review and future needs. Automation in Construction, 38, pp. 109–127. doi: 10.1016/j.autcon.2013.10.023.
- Waldron, D. B. (2006) A Survey of Pressure Points in Australian Construction and Infrastructure Projects. Blake Dawson Waldron. North Sydney, Australia.
- Wu, G., Liu, C., Zhao, X., & Zuo, J. (2017). Investigating the relationship between communication-conflict interaction and project success among construction project teams. International Journal of Project Management, 35(8), pp. 1466–1482. doi: 10.1016/j.ijproman.2017.08.006.
- Xu, C. (2011). Uncertainty and construction projects: A new institutional economics perspective. 2011 IEEE 18th International Conference on Industrial Engineering and Engineering Management, pp. 286–290. doi:10.1109/ICIEEM.2011.6035159.
- Yang, Z. Nguyen, V. T., & Le, P. B. (2018). Knowledge sharing serves as a mediator between collaborative culture and innovation capability: An empirical research. Journal of Business and Industrial Marketing, 33(7), pp. 958–969. doi: 10.1108/JBIM-10-2017-0245.
- Yap, J. B. H., Abdul-Rahman, H., & Chen, W. (2017). Collaborative model: Managing design changes with reusable project experiences through project learning and effective communication. International Journal of Project Management, 35(7), pp. 1253–1271. doi: 10.1016/J.IJPROMAN.2017.04.010.
- Yee, P., Fischer, M., & Haymaker, J. (2013) Automated identification of occupant interactions in renovations of occupied buildings. Journal of Information Technology in Construction, 18, pp. 182–213.
- You, J. Chen, Y., Wang, W., & Shi, C. (2018). Uncertainty, opportunistic behavior, and governance in construction projects: The efficacy of contracts. International Journal of Project Management, 36(5), pp. 795–807. doi: 10.1016/j. ijproman.2018.03.002.
- Zainudin, H. A. (2010). Research Methodology for Business & Social Scince. 1st edn. UiTM Publication Centre (UPENA), Shah Alam, Malaysia.
- Zolkafli, U., Zakaria, N., Yahya, Z., Ali, A. S., Akashah, F. W., & Othman, M. (2012). Risks in conservation projects. Journal of Design + Built, 5, pp. 1–11.