References
- Al-Agele, H. K. B., & Al-Kaabi, S. A. M. (2016). Identification of key factors affecting waste management in life cycle of the construction project by using Delphi technique. Journal of Engineering, 22 (7), pp. 19–34, Available at https://joe.uobaghdad.edu.iq/index.php/main/article/view/187 [accessed 23 November, 2021].
- Al-farra, W. A. K. (2009). Analysis of Questionnaire Data by Using the Statistical Program SPSS. World Assembly of Muslim Youth, (Retrieved at: November, 2019).
- Alkaabi, S. A. M., & Mahjoob, A. M. R. (2022). Identifying the selection criteria of design consultant for Iraqi construction projects. Journal of the Mechanical Behavior of Materials, 31, pp. 290–297. doi: 10.1515/jmbm-2022-0036.
- Alkaabi, S. A. M., & Mahjoob, A. M. R. (2023). Identification of key criteria of selecting the delivery system and type of contract in construction projects. In: Yang, X. S., Alkaabi, S. A. M., & Mahjoob, A. M. R. (eds.), Proceedings of Seventh International Congress on Information and Communication Technology, Lecture Notes in Networks and Systems 464. doi: 10.1007/978-981-19-2394-4_14.
- Ataei, Y., Mahmoudi, A., Feylizadeh, M. R., & Li, D. (2020). Ordinal priority approach (OPA) in multiple attribute decision-making. Applied Soft Computing Journal, 86, p. 105893.
- Brauers, W. K. M., Zavadskas, E. K., Zenonas Turskis, Z., & Vilutiene, T. (2008). Multi-objective contractor’s ranking by applying the MOORA method. Journal of Business Economics and Management, 9 (4), pp. 245–255. doi: 10.3846/1611-1699.2008.9.245-255.
- Cheng, E. W. L., & Li, H. (2004). Contractor selection using the analytic network process. Construction Management and Economics, 22 (10), pp. 1021–1032. doi: 10.1080/0144619042000202852.
- CITB. (2015). Industry Guidance for Contractors. The Construction (Design and Management) Regulations. https://www.citb.co.uk/about-citb/partnerships-and-initiatives/construction-design-and-management-regulations-2015/cdm-regulations/
- Crane, D., Henderson, E. J., & Chadwick, D. R. (2017). Exploring the acceptability of a ‘limited patient consent procedure’ for a proposed blood-borne virus screening programme: A Delphi consensus building technique. BMJ Open, 7, p. e015373. doi: 10.1136/bmjopen-2016-015373.
- Elazouni, A. M. (2006). Classifying construction contractors using unsupervised-learning neural networks. Journal of Construction Engineering and Management, 132 (12), pp. 1242–1253. doi: 10.1061/(ASCE)07339364(2006)132:12(1242).
- El-Sayeg, S. M. (2009). Multi-criteria decision support model for selecting the appropriate construction management at risk firm. Construction Management and Economics, 27 (4), pp. 385–398. doi: 10.1080/01446190902759009.
- Fong, S. P., & Choi, S. K. (2000). Final contractor selection using the analytical hierarchy process. Construction Management and Economics, 18, pp. 547–557.
- Ginevičius, R., & Vaitkūnaitė, V. (2006). Analysis of organizational culture dimensions impacting performance. Journal of Business Economics and Management, 7 (4), pp. 201–211.
- Grisham, T. (2009). The Delphi technique: A method for testing complex and multifaceted topics. International Journal for Managing Projects in Business, 2, pp. 112–130.
- Hasson, F., & Keeney, S. (2011). Enhancing rigour in the Delphi technique research. Technological Forecasting & Social Change, 78, pp. 1695–1704. doi: 10.1007/s12652-020-02395-z.
- Jahan, A., & Edwards, K. L. (2013). VIKOR method for material selection problems with interval numbers and target-based criteria. Materials & Design, 47, p. 759765.
- Javed, S. A., Mahmoudi, A., & Liu, S. (2020). Grey absolute decision analysis (GADA) method for multiple criteria group decision making under uncertainty. International Journal of Fuzzy System, 22, pp. 1073–1090.
- Jeleva, A., Pacalo, V., & Dodu-Gugea, L. (2017). The features of decision-making process in international companies. Are companies in control of their own decisions? CSEI Working Paper Series, Issue 5.
- Kaiser, H. F. (1974). An index of factorial simplicity. Psychometrika, 39(1), pp. 31–36.
- Kashiwagi, D., & Byfield, R. (2002). Selecting the best contractor to get performance: On time, on budget, meeting quality expectations. Journal of Facilities Management, 1. doi: 10.1108/14725960310807872.
- Lam, K. C., Hu, T. S., & Ng, S. T. (2005). Using the principal component analysis method as a tool in contractor prequalification. Construction Management and Economics, 23 (7), pp. 673–684. doi: 10.1080/01446190500041263.
- Lam, K. C., Hu, T. S., Ng, S. T., Skitmore, M., & Cheung, S. O. (2010). A fuzzy neural network approach for contractor prequalification. Construction Management and Economics, 19 (2), pp. 175–188. doi: 10.1080/01446190150505108.
- Lever, J., Krzywinski, M., & Altman, N. (2017). Points of significance: Principal component analysis. Nature Methods, 14 (7), pp. 641–642.
- Mahmoudi, A., Deng, X., Javed, S. A., & Yuan, J. (2020). Large-scale multiple criteria decision-making with missing values: Project selection through TOPSIS.OPA. Journal of Ambient Intelligence and Humanized Computing. doi: 10.1007/s12652-020-02649-w.
- Mahmoudi, A., & Javed, S. A. (2021). Performance evaluation of construction sub-contractors using ordinal priority approach. Evaluation and Program Planning. doi: 10.1016/j. evalprogplan.2021.102022.
- Mahmoudi, A., Javed, S. A., & Mardani, A. (2021a). Gresilient supplier selection through fuzzy ordinal priority approach: Decision-making in post-COVID era. Operations Management Research. doi: 10.1007/s12063-021-00178-z.
- Mahmoudi, A., Deng, X., Javed, S. A., & Zhang, N. (2021b). Sustainable supplier selection in megaprojects: Grey ordinal priority approach. Business Strategy and the Environment, 30(1), pp. 318–339.
- Malone, D. C., Abarca, J., Hansten, P. D., Grizzle, A. J., Armstrong, E. P., & Van Bergen, R. C, et al. (2005). Identification of serious drug-drug interactions: Results of the partnership to prevent drug-drug interactions. The American Journal of Geriatric Pharmacotherapy, 3(2), pp. 65–76.
- Mitkus, S., & Trinkūnienė, E. (2008). Reasoned decisions in construction contracts evaluation. Technological and Economic Development of Economy, 14(3), pp. 402–416.
- Mohammed, S. R., & Jasim, A. J. (2018). Examining the values and principles of agile construction management in Iraqi construction projects. Journal of Engineering, 24(7), pp. 114–133. doi: 10.31026/j.eng.2018.07.08.
- Mohamed, S. R., & Majeed, R. A. (2016). Pre-qualification of contractors in Iraq. Applied Research Journal, 2 (2), pp. 77–87.
- Naghizadeh Vardin, A., Ansari, R., Khalilzadeh, M., Antucheviciene, J., & Bausys, R. (2021). An integrated decision support model based on BWM and fuzzy-VIKOR techniques for contractor selection in construction projects. Sustainability, 13, p. 6933. doi: 10.3390/su13126933.
- Ogbeifun, E., Agwa-Ejon, J., Mbohwa, C., & Pretorius, J. H. C. (2016). The Delphi technique: A credible research methodology. In: Proceedings of the 2016 International Conference on Industrial Engineering and Operations Management Kuala Lumpur, Malaysia, March 8-10.
- Othoman, E., Gupta, N., Zhang, B., & Wamuziri, S. (2013). Contractor selection using an integrated AHP and TOPSIS Model. International Journal of Civil and Environmental Engineering, 3 (1), pp. 1116–1126.
- Plebankiewicz, E. (2014). Modelling decision-making processes in bidding procedures with the use of the fuzzy sets theory. International Journal of Strategic Property Management, 18(3), pp. 307–316. doi: 10.3846/1648715X.2014.943332.
- Preetha, R., & Vinila, J. S. (2020). Early diagnose breast cancer with PCA-LDA based FER and neuro-fuzzy classification system. Journal of Ambient Intelligence and Humanized Computing, 12, pp. 7195–7204. doi: 10.1007/s12652-020-02395-z.
- Quartey-Papafio, T. K., Shajedul, I., & Dehaghani, A. R. (2021). Evaluating suppliers for healthcare centre using ordinal priority approach. Management Science and Business Decisions, 1 (1), pp. 5–11. doi: 10.52812/msbd.12.
- Ralitsa, B., Tolson, H., & Cole, B. R. (2005). Stability of response characteristics of a Delphi panel: Application of bootstrap data expansion. BMC Medical Research Methodology, 5(37). doi: 10.1186/1471-2288-5-37.
- Razi, P. Z., Ramli, N. I., Ali, M. I., & Ramadhansyah, P. J. (2019). Selection of contractor by using analytical hierarchy process (AHP). IOP Conference Series: Materials Science and Engineering, 712(2020), p. 012014. IOP Publishing. doi: 10.1088/1757-899X/712/1/012014, (NCWE & ISSCE).
- Ringnér, M. (2008). What is principal component analysis. Nature Biotechnology, 26 (3), pp. 303–304.
- Sadeghi, M., Mahmoudi, A., & Deng, X. (2021). Adopting distributed ledger technology for the sustainable construction industry: Evaluating the barriers using ordinal priority approach. Environmental Science and Pollution Research. doi: 10.1007/s11356-021-16376-y.
- Shajedul, I. (2021). Evaluation of low-carbon sustainable technologies in agriculture sector through grey ordinal priority approach. International Journal of Grey Systems, 1(1), pp. 5–26. doi: 10.52812/ijgs.3.
- Sönmez, M., Yang, J. B., & Holt, G. D. (2001). Addressing the contractor selection problem using an evidential reasoning approach. Engineering. Construction and Architectural Management, 8 (3), pp. 198–210.
- Wainwright, P., Gallagher, A., Tompsett, H., & Atkins, C. (2010). The use of vignettes within a Delphi exercise: A useful approach in empirical ethics? Journal of Medical Ethics, 36, pp. 656–660.
- Welding, A. K. (2013). Project evaluation: Lessons learned vs. Delphi method. Thesis of 6 ECTS credits submitted to the School of Science and Engineering at Reykjavík University in partial fulfillment of the requirements for the degree of Master of Project Management in MPM.
- Yongtao, T. (2008). Contractor’s competitiveness and competitive strategy in Hong Kong. The Hong Kong Polytechnic University Department of Building and Real Estate.
- Zagorskas, J., & Turskis, Z. (2006). Multi-attribute model for estimation of retail centres influence on the city structure. Kaunas city case study. Technological and Economic Development of Economy, 12(4), pp. 347–352.
- Zavadskas, E. K., & Kaklauskas, A. (1996). Determination of an efficient contractor by using the new method of multicriteria assessment. In: Langford, D. A., & Retik, A., CIB W 65, (eds.), International Symposium for the Organisation and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. London, Weinheim, New York, Tokyo, Melbourne, Madras. E and FN SPON 2, London, pp. 94–104.
- Zavadskas, E. K., Kaklauskas, A., Turskis, Z., & Tamošaitienÿe, J. (2009). Multi-attribute decision-making model by applying grey numbers. Informatica, 20 (2), pp. 305–320.
- Zavadskas, E. K., & Vilutiene, T. (2006). A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I – Model for maintenance contractor evaluation and the determination of its selection criteria. Building and Environment, 41(5), pp. 621–632.
- Zavadskas, E. K., Vilutiene, T., Turskis, Z., & Tamosaitiene, J. (2010). Contractor selection for construction works by applying SAW-G and TOPSIS Grey techniques. Journal of Business Economics and Management, 11 (1), pp. 34–55.