References
- Abdalla, S., Apramian, S. S., Cantley, L. F., & Cullen, M. R. (2017). Occupation and risk for injuries. In C. N. Mock, R. Nugent, O. Kobusingye & K. R Smith (Eds.), Injury Prevention and Environmental Health (3rd ed., pp. 97-132). The International Bank for Reconstruction and Development. https://doi.org/10.1596/978-1-4648-0522-6_ch6.
- Ahmadisheykhsarmast, S., & Sonmez, R. (2020). A smart contract system for security of payment of construction contracts. Automation in Construction, 120(December), 103401. https://doi.org/10.1016/j.autcon.2020.103401
- Aje, I. O., Olatunji, A. O., &. Olalusi, A. O. (2017). Overrun causations under advance payment regimes. Built Environment Project and Asset Management, 7(1), 86-98. https://doi.org/10.1108/BEPAM-06-2015-0028
- Ajslev, J. Z. N., Persson, R., & Andersen, L. L. (2015). Associations between wage system and risk factors for musculoskeletal disorders among construction workers. Pain Research and Treatment, 11, 513903. https://doi.org/10.1155/2015/513903
- Alinaitwe, H., Mwakali, J. A., & Hansson, B. (2007). Analysis of accidents on building construction sites reported in Uganda during 2001-2005. In Proceedings of the CIB World Building Congress (pp. 1208-1221). CIB World Building Congress. https://kipdf.com/analysis-of-accidents-on-building-construction-sites-reported-in-uganda-during_5aca03b71723dd217d846c8a.html
- Almén, L., Larsson, T. J., & Thunqvist, E. (2012). The influence of the designer on the risk of falling from heights and of exposure to excessive workloads on two construction sites. Safety Science Monitor, 16(1), 1-7.
- Anderson, L. P. S., & Grytnes, R. (2021). Different ways of perceiving risk and safety on construction sites and implications for safety cooperation. Construction Management and Economics, 39(5), 419-43. https://doi.org/10.1080/01446193.2021.1904516
- Ansah, S. K. (2011). Causes and effects of delayed payments by clients on construction projects in Ghana. Journal of Construction Project Management and Innovation, 1(1), 27-45. https://doi.org/10.36615/jcpm.v1i1.12
- Bahamid, R. A., & Doh, S. I. (2017). A review of risk management process in construction projects of developing countries. IOP Conference Series: Materials Science and Engineering, 271, 012042. http://dx.doi.org/10.1088/1757-899X/271/1/012042.
- Bake, P. B., & Makinde, J. K. (2021). Payment methods and productivity of construction site workers: a review. In Proceedings of the Academic Conference on Exploring the Sub-Sahara Africa Resources and Opportunities for Sustainable Development in 21st Century (Vol. 12, pp. 71-87). ASUU Conference Hall University of Jos.
- Banaitiene, N., & Banaitis, A. (2012). Risk management in construction projects. In N. Banaitiene (Ed.), Risk Management - Current Issues and Challenges (pp. 429-448). IntechOpen. http://dx.doi.org/10.5772/51460
- Baradan, S., & Usmen, M. A. (2006). Comparative injury and fatality risk analysis of building trades. Journal of Construction Engineering and Management, 132(5), 533-539. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:5(533)
- Bender, K. A., Green, C. P., & Heywood, J. S. (2012). Piece rates and workplace injury: does survey evidence support Adam Smith? Journal of Population Economics, 25(April), 569–590. https://doi.org/10.1007/s00148-011-0393-5
- Berends, T., & Dhillon, J. (2004). An analysis of contract cost phasing on engineering and construction projects. The Engineering Economist, 49(4), 327-337. https://doi.org/10.1080/00137910490888075
- Bujang, M. A., Sa’at, N., & Tg Abu Bakar Sidik, T. M. I. (2017). Determination of minimum sample size requirement for multiple linear regression and analysis of covariance based on experimental and non-experimental studies. Epidemiology Biostatistics and Public Health, 14(3), e12117-1-e12117-9. https://doi.org/10.2427/12117
- Bureau of Labour Statistics. (2009). Incidence rate for nonfatal occupational injuries and illnesses. https://www.bls.gov/iif/oshwc/osh/case/ostb2454.pdf
- Chan, D. W. M., Chan, A. P. C., Lam, P. T. I., Yeung, J. F. Y., & Chan, J. H. L. (2011). Risk ranking and analysis in target cost contracts: empirical evidence from the construction industry. International Journal of Project Management, 29(6), 751-763. https://doi.org/10.1016/j.ijproman.2010.08.003
- Choi, S. D. (2015). Aging workers and trade-related injuries in the US construction industry. Safety and Health at Work, 6(1), 151-155. https://dx.doi.org/10.1016/j.shaw.2015.02.002
- de los Pinos, C., José, A., García, G., & de las Nieves, M. (2017). Critical analysis of risk assessment methods applied to construction works. Revista de la Construcción, 16(1), 104-114. https://doi.org/10.7764/RDLC.16.1.104
- Designing Buildings. (2020). Construction operations definition. https://www.designingbuildings.co.uk/wiki/Construction_operations_definition
- Ding, J., Zhai, W., Wang, Z., Zhang, K., & Cai, J. (2019). Modelling and design analysis of contract payment methods in civil engineering projects. In IOP Conference Series: Earth and Environmental Science (Vol. 304, No. 3, p. 032001). IOP Publishing. https://doi.org/10.1088/1755-1315/304/3/032001
- European Bank for Reconstruction and Development. (2010). Sub-sectoral environmental and social guidelines: Building and construction activities. https://www.ebrd.com/downloads/policies/environmental/construction/buidling.pdf
- Forteza, F. J., Carretero-Gómez, J. M., & Sesé, A. (2020). Safety in the construction industry: accidents and precursors. Revisita de la Construcción, 19(2), 271-281. https://dx.doi.org/10.7764/rdlc.19.2.271
- Gadd, S. A., Keeley, D. M., & Balmforth, H. F. (2004). Pitfalls in risk assessment: examples from the UK. Safety Science, 42(9), 841–857. https://doi.org/10.1016/j.ssci.2004.03.003
- Fick, G., Cackler, E. T., Trost, S., & Vanzler, L. (2010). Time-related incentive and disincentive provisions in highway construction projects. NCHRP Report, 652. Transportation Research Board. https://doi.org/10.17226/14392
- Henriod, E. E., & Lantran, J. M. (2000). Trends in contracting practice for civil works. Site Resources, World Bank, New York, 1(9). https://siteresources.worldbank.org/INTROADSHIGHWAYS/Resources/3389931122496826968/cn_ntk2b.pdf
- Jeong, G., Kim, H., Lee, H. S., Park, M., & Hyun, H. (2022). Analysis of safety risk factors of modular construction to identify accident trends. Journal of Asian Architecture and Building Engineering, 21(3), 1040-1052. https://doi.org/10.1080/13467581.2021.1877141
- Johansson, B., Rask, K., & Stenberg, M. (2010). Piece rates and their effects on health and safety: a literature review. Applied Ergonomics, 41(4), 607–614. https://doi.org/10.1016/j.apergo.2009.12.020
- Judi, S. S., & Abdul-Rashid, R. (2010). Contractor’s right of action for late or non-payment by the employer. Journal of Surveying, Construction and Property, 1(1), 1-31. https://doi.org/10.22452/jscp.vol1no1.4
- Kaim, O. F., Alabi, A. M., & Wusu, S. (2020). Risk assessment for hazard exposure and its consequences on housing construction sites in Lagos Nigeria. Acta Structilia, 27(1), 59-84. https://doi.org/10.18820/24150487/as27i1.3
- Kaka, A., Wong, C., Fortune, C., & Langford, D. (2008). Culture change through the use of appropriate pricing systems. Engineering, Construction and Architectural Management, 15(1), 66-77. https://doi.org/10.1108/09699980810842070
- Kaka, A.P., & Lewis, J. (2003). Development of a company-level dynamic cash flow forecasting model (DYCAFF). Construction Management and Economics, 21(7) 693-705. https://doi.org/10.1080/0144619032000116561
- Kang, Y., Siddiqui, S., Suk, S.J., Chi, S., & Kim, C. (2017). Trends of fall accidents in the U.S. construction industry. Journal of Construction Engineering and Management, 143(8), 04017043. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001332
- Kazimu, M. A. (2012). Significant factors that cause cost overrun in building construction project in Nigeria. Interdisciplinary Journal of Contemporary Research in Business, 391(1), 775-780.
- Kozlovská, M., & Struková, Z. (2012). Overview of safety risk perception in construction. Journal of Civil Engineering and Architecture, 6(2), 211–218.
- Li, R. Y. M., Chau, K. W., & Zeng, F. F. (2019). Ranking of risks for existing and new building works. Sustainability, 11(10), 2863. https://doi.org/10.3390/su11102863
- Liu, H., Li, J., Li, H., Li, H., Mao, P., & Yuan, J. (2021). Risk perception and coping behaviour of construction workers on occupational health risks: a case study of Nanjing, China. International Journal of Environmental Research and Public Health, 18(13), 7040. https://doi.org/10.3390/ijerph18137040
- Luo, H., Das, M., Wang, J., & Cheng, J. C. (2019). Construction payment automation through smart contract-based blockchain framework. In Proceedings of the International Symposium on Automation and Robotics in Construction (Vol. 36, pp. 1254-1260). ISARC Publications.
- Mamman, J., Mohammed, Y. D., Shittu, A. A., & Adamu, A. D. (2021, May 25-27). Risk Assessment of Safety for Building Construction Projects in Abuja, Nigeria [Paper presentation]. School of Environmental Technology Conference (SETIC), Federal University of Technology, Minna, Nigeria.
- Mbachu, J. (2011). Sources of contractor’s payment risks and cash flow problems in the New Zealand construction industry: project team’s perceptions of the risks and mitigation measures. Construction Management and Economics, 29(10), 1027-1041. http://dx.doi.org/10.1080/01446193.2011.623708
- Memarian, B., & Mitropoulos, P. (2012). Safety incidents and high-risk activities of masonry construction. In Construction Research Congress 2012: Construction Challenges in a Flat World (pp. 2510-2519). ASCE. https://web.archive.org/web/20160408204554id_/http://rebar.ecn.purdue.edu/crc2012/papers/pdfs/-153.pdf
- Memarian, B., & Mitropoulos, P. (2013). Accidents in masonry construction: the contribution of production activities to accidents, and the effect on different worker groups. Safety Science, 59(November), 179-186. https://doi.org/10.1016/j.ssci.2013.05.013
- Mhetre, K., Konnur, B. A., & Landage, A. B. (2016). Risk management in construction industry. International Journal of Engineering Research, 5(1), 153-155. https://doi.org/10.17950/ijer/v5i1/035
- Motawa, I., & Kaka, A. (2009). Modelling payment mechanisms for supply chain in construction. Engineering, Construction and Architectural Management, 16(4), 325-336. https://doi.org/10.1108/09699980910970824
- Motawa, I., & Kaka, A. (2008). Payment mechanisms for integrated teams in construction. Construction Economics and Building, 8(2), 1-10. https://doi.org/10.5130/AJCEB.v8i2.3001
- Muiruri, G., & Mulinge, C. (2014, June 16-21). Health and safety management on construction project sites in Kenya: a case study of construction projects in Nairobi County [Paper presentation]. FIG Congress, Kuala Lumpur, Malaysia.
- Muñoz-La Rivera, F., Mora-Serrano, J., & Oñate, E. (2021). Factors influencing safety on construction projects (FSCPs): types and categories. International Journal of Environmental Research and Public Health, 18(20), 10884. https://doi.org/10.3390/ijerph182010884
- Nawaz, W., Linke, P., & Koҫ, M. (2019). Safety and sustainability nexus: a review and appraisal. Journal of Cleaner Production, 216(April), 74–87. https://doi.org/10.1016/j.jclepro.2019.01.167
- Ndiwa, S. C. (2019). Ergonomic risk factors among workers in building construction sites in Mombasa County [Unpublished master’s thesis]. Jomo Kenyatta University of Agriculture and Technology, Kenya.
- Nketekete, M., Emuze, F., & Smallwood, J. (2016). Risk management in public sector construction projects: case studies in Lesotho. Acta Structilia, 23(2), 1-24. http://dx.doi.org/10.18820/24150487/as23i2.1
- Okoye, P. U. (2018). Occupational health and safety risk level of building construction trades in Nigeria. Construction Economics and Building, 18(2), 92-109. https://doi.org/10.5130/AJCEB.v18i2.5882
- Omopariola, E. D., & Windapo, A. O. (2018, September 30–October 1). Framework for matching payment systems to project environment in the construction industry [Paper presentation]. 10th SACQSP International Research Conference, Johannesburg, South Africa.
- Oswald, D., Sherratt, F., & Smith, S. (2017, September 4-6). An investigation into a health and safety reward system on a large construction project [Paper presentation]. 33rd Annual ARCOM Conference, Cambridge.
- Park, H. K., Han, S. H., & Russell, J. S. (2005). Cash flow forecasting model for general contractors using moving weights of cost categories. Journal of Management in Engineering, 21(4), 164-173. http://dx.doi.org/10.1061/(ASCE)0742-597X(2005)21:4(164)
- Purohit, D. P., Siddiqui, N. A., Nandan, A., & Yadav, B. P. (2018). Hazard identification and risk assessment in construction industry. International Journal of Applied Engineering Research, 13(10), 7639-7667.
- Ramachandra, T. (2013). Exploring feasible solutions to payment problems in the construction industry in New Zealand [Unpublished doctoral thesis]. Construction Management Programme, School of Engineering Faculty of Design and Creative Technologies, Auckland University of Technology, New Zealand.
- Revenue. (2021). Relevant contracts tax: relevant operations tax and duty manual. Part 18-02-01, Irish Tax and Custom. https://www.revenue.ie/en/tax-professionals/tdm/income-tax-capital-gains-tax-corporation-tax/part-18/18-02-01.pdf
- Rhee, K. Y., Kim, Y. S., & Cho, Y. H. (2015). The type of payment and working conditions. Safety and Health at Work, 6(4), 289-294. https://doi.org/10.1016/j.shaw.2015.07.001
- RICS. (2015). Management of risk: RICS professional note (1st ed.). Royal Institute of Chartered Surveyors. www.rics.org/guidance
- Schneider, S., & Susi, P. (1994). Ergonomics and construction: a review of potential hazards in new construction. American Industrial Hygiene Association Journal, 55(7), 635-649. https://doi.org/10.1080/15428119491018727
- Schneider, S. P. (n.d.). The economics of health and safety in construction. Electronic Library of Construction Occupational Safety and Health. https://www.elcosh.org/document/1742/d000806/The+Economics+of+Health+and+Safety+in+Construction.html
- Sherif, E., & Kaka, A. (2003, September 3-5). Factors influencing the selection of payment systems in construction projects [Paper presentation]. 19th Annual ARCOM Conference, Association of Researchers in Construction Management, Brighton, UK.
- Siddiqui, K. (2013). Heuristics for sample size determination in multivariate statistical techniques. World Applied Sciences Journal, 27(2), 285-287. https://doi.org/10.5829/idosi.wasj.2013.27.02.889
- Swai, L. P., Arewa, A. O., Ugulu, R. A. (2020, February 2-5). Unfair payment issues in construction: re-thinking alternative payment method for tier-1 contractors to subcontractors [Paper presentation]. International Conference on Civil Infrastructure and Construction (CIC), Doha, Qatar. https://doi.org/10.29117/cic.2020.0012
- Tabachnick, B. G., & Fidell, L. S. (2013). Using multivariate statistics (6th ed.). Pearson Education.
- The University of Melbourne. (2017). Risk assessment methodology. The University of Melbourne. https://safety.unimelb.edu.au
- Vitharana, V. H. P., De Silva, S., & De Silva, G. H. M. J. S. (2015). Health hazards, risk and safety practices in construction sites: a review study. Engineer, 48(3), 35-44. http://iesl.nsf.ac.lk/bitstream/handle/1/1867/Engineer-2015-48(3)_35.pdf?sequence=2
- Walimuni, P. C., Samaraweera, A., & De Silva, L. (2017). Payment mechanisms for contractors for better environmental hazard controlling in road construction projects. Built Environment Project and Asset Management, 7(4), 426-440. https://doi.org/10.1108/BEPAM-11-2016-0069
- Wells, J. (2016). Protecting the wages of migrant construction workers: Part one. Engineers Against Poverty. http://engineersagainstpoverty.org/wp-content/uploads/2016/11/Protecting-the-Wages-of-Migrant-Construction-Workers-Part-One.pdf.
- Workplace Safety and Health Council. (2011). Code of practice on workplace safety and health (WSH) risk management. The Workplace Safety and health Council in collaboration with the Ministry of Manpower. www.wshc.sg.
- Wu, X., Chong, H-Y., Wang, G., & Li, S. (2018). The influence of social capitalism on construction safety behaviours: an exploratory megaproject case study. Sustainability, 10(9), 3098. https://doi.org/10.3390/su10093098
- Youli, Y., Yingjian, P., & Xiaoxia, L. (2018, July). Research on safety risk management of civil construction projects based on risk matrix method. In IOP Conference Series: Materials Science and Engineering (Vol. 392, No. 6, p. 062080). IOP Publishing. https://doi.org/10.1088/1757-899X/392/6/062080
- Zavadskas, E. K., Turskis, Z., & Tamošaitiene, J. (2010). Risk assessment of construction projects. Journal of Civil Engineering and Management, 16(1), 33-46. https://dx.doi.org/10.3846/jcem.2010.03
- Zou, P. X. W., Zhang, G., & Wang, J. (2007). Understanding the key risks in construction projects in China. International Journal of Project Management, 25(6), 601-614. https://doi.org/10.1016/j.ijproman.2007.03.001