Have a personal or library account? Click to login

Financial Issues in Project Schedule of the Construction Industry in Pakistan

Open Access
|Jun 2020

References

  1. Abdul-Rahman, H., Mohammed Ali Berawi, A. R. Berawi, O. Mohamed, M. Othman, and I. A. Yahya. (2006). “Delay mitigation in the Malaysian construction industry”, Journal of construction engineering and management 132, no. 2: 125-133.10.1061/(ASCE)0733-9364(2006)132:2(125)
  2. Ahmed, S. M., Azhar, S., Kappagantula, P., & Gollapudi, D. (2003). “Delays in: A brief study of the Florida construction industry”, In Proceeding of the 39th Annual Conference of the Associated Schools of Construction. Clemson, South Carolina: Clemson University. Final report, Miami F (Vol. 1, p. 33174).
  3. Aibinu, A. A., & Jagboro, G. O. (2002). “The effects of construction delays on project delivery in Nigerian construction industry”, International journal of project management, 20(8), 593-599.10.1016/S0263-7863(02)00028-5
  4. Bromilow, F. J. (1974). “Measurement and scheduling of construction time and cost performance in the building industry”, The Chartered Builder, 10(9), 57-65.
  5. Jhatial, A. A., Sohu, S., Bhatti, N. K., Lakhiar, M. T., & Oad, R. (2018). “Effect of steel fibres on the compressive and flexural strength of concrete”, International journal of advanced and applied sciences, 5(10), 16-21.10.21833/ijaas.2018.10.003
  6. Kumaraswamy, M. M., & Chan, D. W. (1998). “Contributors to construction delays”, Construction Management & Economics, 16(1), 17-29.10.1080/014461998372556
  7. Frimpong, Y., & Oluwoye, J. (2003). “Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana”, Journal of Construction Research, 4(02), 175-187.10.1142/S1609945103000418
  8. Harris, M., & Fraser, I. (2002). “Natural resource accounting in theory and practice: A critical assessment”, Australian Journal of Agricultural and Resource Economics, 46(2), 139-192.10.1111/1467-8489.00018
  9. Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). “Factors influencing construction time and cost overruns on high-rise projects in Indonesia”, Construction Management & Economics, 15(1), 83-94.10.1080/014461997373132
  10. Lundin, R. A., Tryggestad, K., Amoatey, C. T., Ameyaw, Y. A., Adaku, E., & Famiyeh, S. (2015). “Analysing delay causes and effects in Ghanaian state housing construction projects”, International Journal of Managing Projects in Business.
  11. Keerio, M. A., Sohu, S., Mangi, S. A., Bhatti, N. U. K., & Ullah, K. (2017). “Significant Causative Factors of Delay in Road Construction Projects in Pakistan”, Engineering Science and Technology International Research Journal, Vol.1, No.2, 2017, pp. 59 – 63.
  12. Sambasivan, M., & Soon, Y. W. (2007). “Causes and effects of delays in Malaysian construction industry”, International Journal of project management, 25(5), 517-526.10.1016/j.ijproman.2006.11.007
  13. Shen, L. Y. (1997). “Project risk management in Hong Kong”, International journal of project management, 15(2), 101-105.10.1016/S0263-7863(96)00045-2
  14. Shen, L. Y., Fisher, N., & Sun, C. S. (2001). “An analysis of the distribution of cost variance for building projects”, Journal of Construction Research, 2(1), 35-40.
  15. Sohu, S., Ullah, K., Jhatial, A. A., Jaffar, M., & Lakhiar, M. T. (2018a). “Factors adversely affecting quality in highway projects of Pakistan”, International Journal of Advanced and Applied Sciences, 5(10), 62-66.
  16. Sohu, S., Jhatial, A. A., Ullah, K., Lakhiar, M. T., & Shahzaib, J. (2018b). “Determining the critical success factors for highway construction projects in Pakistan”, Engineering, Technology & Applied Science Research, 8(2), 2685-2688.10.48084/etasr.1866
  17. Mehr, S. Y., & Omran, A. (2013). “Examining The Challenges Affect On The Effectiveness Of Materials Management In The Malaysian Construction Industry”, International Journal of Academic Research, 5(2).10.7813/2075-4124.2013/5-2/A.7
  18. Ullah, K., Khan, M. S., Lakhiar, M. T., Vighio, A. A., & Sohu, S. (2018). “Ranking of Effects of Construction Delay: Evidence from Malaysian Building Projects”, Journal of Applied Engineering Sciences, 8(1), 79-84.10.2478/jaes-2018-0011
Language: English
Page range: 89 - 94
Submitted on: Jan 6, 2020
Accepted on: Feb 26, 2020
Published on: Jun 5, 2020
Published by: University of Oradea, Civil Engineering and Architecture Faculty
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2020 Fazal Ali Shaikh, Nasrullah Odhano, Ashfaque Ahmed Jhatial, published by University of Oradea, Civil Engineering and Architecture Faculty
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.