Have a personal or library account? Click to login
Building Construction Labour Productivity in Arid Climate Environment Cover

References

  1. I.A Bhatti et al. (2018). “Delay in High-rise Building Construction Projects of Dubai: A Review”. Engineering Science and Technology International Research Journal, Vol.2, No.2, 2018, 7-15.
  2. Buchan R. D., Fleming F. W., Kelly J. R. (1993). Estimating for builders and quantity surveyors, Oxford: Butter worth-Heinemann.
  3. I.A Bhatti et al. (2018). “Replacement of In-situ Bathrooms with POD Bathrooms to Save Time & Money within construction of fast track projects (Project Case study)”. Asian Journal of Technical Vocational Education and Training (AJTVET). Vol. 5, No.9, 2018, 42-45.
  4. Oladiran, O. J. and Onatayo, D. (2019). “Labour productivity: Perception of site managers on building projects” LAUTECH Journal of Civil and Environmental Studies Vol.2, No.1, 2019, 1-10.10.36108/laujoces/9102/20(0110)
  5. Jarkas, A. M. & Bitar, C. G. (2012). Factors affecting construction labour productivity in Kuwait. Journal of Construction Engineering and Management 138(July): 811–820.10.1061/(ASCE)CO.1943-7862.0000501
  6. Revianty Nurmeyliandari Nurhendi, Muhamad Azry Khoiry, Noraini Hamzah (2019). “Review on Factors Influencing Labour Productivity in Construction Project” International Journal of Recent Technology and Engineering (IJRTE) ISSN: 2277-3878, Vol.7, No.6.
  7. S. Sohu et al. (2018). “Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan” Engineering, Technology & Applied Science Research Vol. 8, No. 2, 2018, 2770-2774.10.48084/etasr.1916
  8. I.A Bhatti et al. (2018). “Implementation of Building Information Modeling (BIM) in Pakistan Construction Industry” Engineering, Technology & Applied Science Research Vol. 8, No. 4, 2018, 3199-3202.10.48084/etasr.2145
  9. Kazaz, A., Ulubeyli, S., Acikara, T. & Er, B. (2016). Factors Affecting Labour Productivity: Perspectives of Craft Workers. Procedia Engineering, hlm. 28 – 34. doi:10.1016/j.proeng.2016.11.588.10.1016/j.proeng.2016.11.588
  10. Mahamid, I. (2013). Contractors’ perspective toward factors affecting Labour productivity in building construction. Engineering, Construction and Architectural Management 20(5): 446–460. Doi: 10.1108/ECAM-08-2011-0074.10.1108/ECAM-08-2011-0074
  11. Gerek, İ. H., Erdis, E., Mistikoglu, G. & Usmen, M. (2015). Modelling masonry crew productivity using two artificial neural network techniques. Journal of Civil Engineering and Management 21(2): 231–238. doi:10.3846/13923730.2013.802741.10.3846/13923730.2013.802741
  12. Song, L. & Abourezk’s, S. M. (2008). Measuring and Modeling Labour Productivity Using Historical Data. Journal of Construction Engineering and Management 134(10): 786–794. Doi: 10.1061/(ASCE) 0733-9364(2008)134:10(786).10.1061/(ASCE)0733-9364(2008)134:10(786)
Language: English
Page range: 125 - 130
Submitted on: Sep 24, 2019
Accepted on: Oct 5, 2019
Published on: Dec 21, 2019
Published by: University of Oradea, Civil Engineering and Architecture Faculty
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2019 Imtiaz Ali Bhatti, Abd Halid Abdullah, Sasitharan Nagapan, Nabi Bux Bhatti, Muhammad Tahir Lakhiar, Muntazir Mahdi Mahar, published by University of Oradea, Civil Engineering and Architecture Faculty
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.