Have a personal or library account? Click to login
Ranking of Effects of Construction Delay: Evidence from Malaysian Building Projects Cover

Ranking of Effects of Construction Delay: Evidence from Malaysian Building Projects

Open Access
|Aug 2018

References

  1. Abdullah, M. R., Rahman, I. A., & Azis, A. A. A., 2010. Causes of Delay in MARA Management Procurement Construction Projects. Journal of Surveying, Construction & Property, 1(1), 123–138.10.22452/jscp.vol1no1.6
  2. Aibinu, A. A., & Jagboro, G. O., 2002. The effects of construction delays on project delivery in Nigerian construction industry. International Journal of Project Management, 20(8), 593–599.10.1016/S0263-7863(02)00028-5
  3. Al-Najjar, J., 2008. Factors influencing time and cost overruns on construction projects in the Gaza Strip. The Islamic University of Gaza Master Thesis.
  4. Amu, O. O., & Adesanya, D. A., 2011. Mathematical expressions for explaining project delays in south western Nigeria. Singapore Journal of Scientific Research, 1(1), 59–67.10.3923/sjsres.2011.59.67
  5. Assaf, S. A., & Al-Hejji, S., 2006. Causes of delay in large construction projects. International Journal of Project Management, 24(4), 349–357.10.1016/j.ijproman.2005.11.010
  6. Aziz, R. F., 2013. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Engineering Journal, 52(3), 387–406.10.1016/j.aej.2013.03.002
  7. Azlan, O., & Syuhada, I., 2014. Delay in Government Project Delivery in Kedah, Malaysia. In Recent Advances in Civil Engineering and Mechanics (pp. 248–254).
  8. Denini, F., 2012. Causes, effects and methods of minimizing delays on large construction projects in Libya. In 6th International Conference and Workshop on the Built Environment in Developing Countries. Adelaide, Australia.
  9. Enshassi, A., Kumaraswamy, M., & Al-najjar, J., 2010. Significant Factors Causing Time and Cost Overruns in Construction Projects in the Gaza Strip: Contractors’ Perspective. International Journal of Construction Management, 10(1), 35–60.10.1080/15623599.2010.10773137
  10. Fugar, F. D. K., & Agyakwah-baah, A. B., 2010. Delays in building construction projects in Ghana. Australasian Journal of Construction Economics and Building, 10(1/2), 103–116.10.5130/ajceb.v10i1/2.1592
  11. Haseeb, M., & Bibi, A., 2011. Problems of Projects and Effects of Delays in the Construction Industry of Pakistan. Australian Journal of Business and Management Research, 1(5), 41–50.10.52283/NSWRCA.AJBMR.20110106A05
  12. Jarkas, A. M., & Bitar, C. G., 2012. Factors Affecting Construction Labor Productivity in Kuwait. Journal of Construction Engineering and Management, 138(7), 811–820.10.1061/(ASCE)CO.1943-7862.0000501
  13. Kikwasi, G. J., 2012. Causes and Effects of Delays and Disruptions in Construction Projects in Tanzania. Australasian Journal of Construction Economics and Building, 1(2), 52–59.10.5130/ajceb-cs.v1i2.3166
  14. Litwin, M. S., 1995. How to Measure Survey Reliability and Validity. Thousand Oaks, Calif, USA: Sage.10.4135/9781483348957
  15. Majid, I. A., 2006. Causes and effects of delays in Aceh construction Industry. Master Thesis, Universiti Teknologi Malaysia.
  16. Muhwezi, L., Chamuriho, L. M., & Lema, N. M., 2012. An investigation into materials wastes on building construction projects in Kampala, Uganda. Scholarly Journal of Engineering Research, 1(1), 11–18.
  17. Sambasivan, M., & Soon, Y. W., 2007. Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526.10.1016/j.ijproman.2006.11.007
  18. Senouci, A., Ismail, A., & Eldin, N., 2016. Time Delay and Cost Overrun in Qatari Public Construction Projects. Procedia Engineering, 164, 368–375.10.1016/j.proeng.2016.11.632
  19. Sincich, T. L., Levine, D. M., & Stephan, D. F., 2002. Practical Statistics by Example Using Microsoft Excel and Minitab. (Second, Ed.). Prentice Hall, Upper Saddle River, New Jersey.
  20. Tikote, R., Magdum, M., & Khandare, M., 2017. Delay Analysis in Industrial Projects by Using Relative Importance Index Method. International Research Journal of Engineering and Technology, 4(6), 1982–1988.
  21. Tumi, S. A. H., Omran, A., & Pakir, A. H. K., 2009. Causes of Delay in Construction Industry in Libya. In The International Conference on Economics and Administration (pp. 265–272). Romania.
Language: English
Page range: 79 - 84
Submitted on: Jan 6, 2018
|
Accepted on: Feb 15, 2018
|
Published on: Aug 20, 2018
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2018 K. Ullah, M. S. Khan, M. T. Lakhiar, A. A. Vighio, S. Sohu, published by University of Oradea, Civil Engineering and Architecture Faculty
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.