Have a personal or library account? Click to login
Optimizing Sewing Line Balancing in Apparel Manufacturing through Digitalization Cover

Optimizing Sewing Line Balancing in Apparel Manufacturing through Digitalization

Open Access
|May 2025

References

  1. Bheda R, Narag AS, Singla ML. Apparel manufacturing: A strategy for productivity improvement. Journal of Fashion Marketing and Management. 2003;7(1):12–22. Available from: https://doi.org/10.1108/13612020310464331
  2. Chen JC, Chen C, Yuan C, et al. Assembly line balancing problem of sewing lines in garment industry. In: International Conference on Industrial Engineering and Operations Management; 2014; Bali, Indonesia. Elsevier; p. 1215–25. Available from: https://doi.org/10.1016/j.eswa.2012.02.055
  3. Prakash C. Implementation of lean tools in apparel industry to improve productivity and quality. Current Trends in Fashion Technology & Textile Engineering. 2018;4(1):10–4. Available from: https://doi.org/10.19080/CTFTTE.2018.04.555628
  4. Sit, S K H., & Lee, C. (2023, September 1). Design of a Digital Twin in Low-Volume, High-Mix Job Allocation and Scheduling for Achieving Mass Personalization. Multidisciplinary Digital Publishing Institute, 11(9), 454–454. https://doi.org/10.3390/systems11090454
  5. Abdulatif, N., Yasser, S., Fahim, I S., Emad, Y., Saleh, A., & Kassem, S. (2020, November 8). Decision Support Using Simulation to Improve Productivity: A Case Study. , 14, 1120–1127.
  6. Tsai, W. (2018, August 9). Green Production Planning and Control for the Textile Industry by Using Mathematical Programming and Industry 4.0 Techniques. Multidisciplinary Digital Publishing Institute, 11(8), 2072–2072. https://doi.org/10.3390/en11082072
  7. Santos, P., Campilho, R., & Silva, F. (2020, July 3). A new concept of full-automated equipment for the manufacture of shirt collars and cuffs. Elsevier BV, 67, 102023–102023. https://doi.org/10.1016/j.rcim.2020.102023
  8. Özcan U, Peker A. Karişik modelli U-tipi montaj hatlarında hat dengeleme ve model sıralama problemleri için yeni bir sezgisel yaklaşım. Gazi Üniversitesi Mühendislik Mimarlık Fakültesi Dergisi. 2007;22(2):277–86.
  9. Delice Y, Kızılkaya Aydoğan E, Özcan U. Stochastic two-sided U-type assembly line balancing: A genetic algorithm approach. International Journal of Production Research. 2016;54(11):3429–51. Available from: https://doi.org/10.1080/00207543.2016.1140918
  10. Chen JC, Chen C, Su LH, et al. Assembly line balancing in garment industry. Expert Systems with Applications. 2012;39(11):10073–81. Available from: https://doi.org/10.1016/j.eswa.2012.02.055
  11. Khatun MM. Effect of time and motion study on productivity in garment sector. International Journal of Scientific & Engineering Research. 2014;5(5):825–33.
  12. Nabi F, Mahmud R, Islam MM. Improving sewing section efficiency through utilization of worker capacity by time study technique. International Journal of Textile Science. 2015;4(1):1–6. Available from: https://doi.org/10.5923/j.textile.20150401.01
  13. Mothilal B, Prakash C. Implementation of lean tools in apparel industry to improve productivity and quality. Current Trends in Fashion Technology & Textile Engineering. 2018;4(1):9–14.
  14. Kays HM, Prodhan S, Karia N, Karim A, Sharif S. Improvement of operational performance through value stream mapping and Yamazumi chart: A case of Bangladeshi RMG industry. International Journal of Recent Technology and Engineering. 2019;8:11977–86. Available from: https://doi.org/10.35940/ijrte.D9926.118419
  15. Correia D, Gouveia R, Pereira T, Pinto FL. Improving manual assembly lines devoted to complex electronic devices by applying Lean tools. Procedia Manufacturing. 2018;17:663–71. Available from: https://doi.org/10.1016/j.promfg.2018.10.115
  16. Eugenia M, Barrientos S, Hinojosa VA, et al. Line balancing in assembly line: A case study. In: Proceedings of the International Conference on Industrial Engineering and Operations Management; 2018; Paris, France. IEOM Society International; p. 2476–86.
  17. Wang CC, Liu CT. An empirical study of the machine assembly efficiency improvement based on Lean Six Sigma technique. TEM Journal. 2019;8(2):471–6. Available from: https://doi.org/10.18421/TEM82-21
  18. Mridha J, Hasan S, Ahmed F, Shahjalal M. Implementation of Six Sigma to minimize defects in sewing section of apparel industry in Bangladesh. Global Journal of Engineering Science and Researches. 2019;19:11–8.
  19. Zieliński J. Analysis of selected organizational systems of sewing teams. Fibres & Textiles in Eastern Europe. 2008;16(4):90–5.
  20. Rahman MM, Nur F, Talapatra S. An integrated framework of applying line balancing in apparel manufacturing organization: a case study. Journal of Mechanical Engineering. 2015;44(2):117–23.
  21. Güner MG, Ünal C. Line balancing in the apparel industry using simulation techniques. Fibres & Textiles in Eastern Europe. 2008;16(2):75–8.
  22. Kursun S, Kalaoglu F. Simulation of production line balancing in apparel manufacturing. Fibres & Textiles in Eastern Europe. 2009;17(4):68–71.
  23. Kayar M, Akalin M. Comparing heuristic and simulation methods applied to the apparel assembly line balancing problem. Fibres & Textiles in Eastern Europe. 2016;24(2):131–7.
  24. Eryuruk SH. Clothing assembly line design using simulation and heuristic line balancing techniques. Journal of Textile & Apparel / Tekstil ve Konfeksiyon. 2012;22(4):360–8.
  25. Tomar A, Manoria A. Increasing line efficiency with COMSOAL, RPW, and LCR methods of assembly line balancing problem. International Journal of Soft and Hard Research Engineering. 2016;4(1):23–7.
  26. Türkmen A, Yesil Y, Kayar M. Heuristic production line balancing problem solution with MATLAB software programming. International Journal of Clothing Science and Technology. 2016;28:750–79. Available from: https://doi.org/10.1108/IJCST-01-2016-0002
  27. Jha P, Khan MS. An experimental study on the automotive production line using assembly line balancing techniques. International Journal of Mechanical Engineering and Technology. 2017;8:22–33.
  28. Ghutukade ST, Sawant SM. Use of ranked position weighted method for assembly line balancing. International Journal of Advanced Engineering Research Studies. 2013;2(4):1–3.
  29. Buchari, Tarigan U, Ambarita M. Production layout improvement by using line balancing and systematic layout planning (SLP) at PT. XYZ. IOP Conference Series: Materials Science and Engineering. 2018;309:012116. Available from: https://doi.org/10.1088/1757-899X/309/1/012116
  30. Wang S, Wan J, Zhang D, et al. Towards smart factory for Industry 4.0: a self-organized multi-agent system with big data based feedback and coordination. Computer Networks. 2016;101:41–51. Available from: https://doi.org/10.1016/j.comnet.2015.12.017
  31. Fu X, Zou J, Ju CA. Sewing line planning model based on RFID technology. Journal of Electrical Engineering & Technology. 2020;15:1441–52. Available from: https://doi.org/10.1007/s42835-020-00420-x
  32. Olanrewaju O, Ojima OA, Bakhtiyar D. Advancing manufacturing efficiency through real-time production monitoring and control systems. Journal of Engineering Research and Reports. 2024;26(4):184–93. Article no. JERR.115010. ISSN: 2582-2926.
  33. Von Haartman R, Bengtsson L, Niss C. Lean practices and the adoption of digital technologies in production. International Journal of Services and Operations Management. 2021;40:286–304. Available from: https://doi.org/10.1504/IJSOM.2021.118260
  34. Koç B. Hazır Giyim Dikim İşletmesinde Yalın Üretim ve Sürdürülebilir Yalın Dijital Model Tasarımı (Unpublished PhD thesis). Istanbul Technical University; Faculty of Textile Engineering; 2025.
  35. Zhang, Y., & Sun, S. (2013, April 1). Real-time data driven monitoring and optimization method for IoT-based sensible production process. , 22, 486–490. https://doi.org/10.1109/icnsc.2013.6548787
  36. Mohd J, Abid H, Ravi PS, Rajiv S, Ernesto SG. Understanding the adoption of Industry 4.0 technologies in improving environmental sustainability. Sustainable Operations and Computers. 2022;3:203–17. Available from: https://doi.org/10.1016/j.susoc.2022.01.008
  37. Khalil M, Din M, Ali A, Tahir M. Enhancing the productivity and assembly line balancing through takt time implementation. Research Square. 2024. Available from: https://doi.org/10.21203/rs.3.rs-4275556/v1
  38. Edokpia R, Owu F. Assembly line re-balancing using ranked positional weight technique and longest operating time technique: a comparative analysis. Advanced Materials Research. 2013;824:568–78. Available from: https://doi.org/10.4028/www.scientific.net/AMR.824.568
  39. Can E, Öner A. Analysis and balancing of assembly line in a machine molding factory. International Advanced Researches and Engineering Journal. 2021;5(1):87–96.
  40. Bongomin O, Mwasiagi J, Oyondi N, et al. Improvement of garment assembly line efficiency using line balancing technique. Engineering Reports. 2020;2:1–22. Available from: https://doi.org/10.1002/eng2.12157
  41. Talapatra S, Al-Mahmud S, Kabir I. Overall Efficiency Improvement of a Production Line by Using Yamazumi Chart: A Case Study. Proceedings of the International Conference on Industrial Engineering and Operations Management; 2019; Paris, France.
  42. Xiao Y. Effect and Influencing Factors of Digital Transformation of Manufacturing Industry. 2022. Available from: https://doi.org/10.2991/aebmr.k.220405.072
  43. Casciani D, Chkanikova O, Pal R. Exploring the nature of digital transformation in the fashion industry: opportunities for supply chains, business models, and sustainability-oriented innovations. Sustainability: Science, Practice and Policy. 2022;18(1):773–795. Available from: https://doi.org/10.1080/15487733.2022.2125640
  44. Scherrer M, Deflorin P, Anand G. Manufacturing flexibility through outsourcing: effects of contingencies. International Journal of Operations & Production Management. 2014;34(9):1210–1242. Available from: https://doi.org/10.1108/ijopm-01-2012-0033
  45. Keough I, Benjamin D. Multi-objective optimization in architectural design. 2010. Available from: https://doi.org/10.1145/1878537.1878736
  46. Hasan M, Shanta MR, Shams A, Rahman S, Elahi S, Islam M. Advantages of lean techniques application in apparel industry: case study on knit jacket. Journal of Textile Engineering & Fashion Technology. 2019;5(5). Available from: https://doi.org/10.15406/jteft.2019.05.00210
DOI: https://doi.org/10.2478/ftee-2025-0002 | Journal eISSN: 2300-7354 | Journal ISSN: 1230-3666
Language: English
Page range: 10 - 26
Published on: May 28, 2025
Published by: Łukasiewicz Research Network, Institute of Biopolymers and Chemical Fibres
In partnership with: Paradigm Publishing Services
Publication frequency: Volume open

© 2025 Bülent Koç, Selin Hanife Eryürük, published by Łukasiewicz Research Network, Institute of Biopolymers and Chemical Fibres
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.