Fig. 1.

Process Monitoring Device (PMD)
Process Monitoring Device (PMD)

Fig. 2.

Dynamic Workflow Optimization Framework for PMD
Dynamic Workflow Optimization Framework for PMD

Fig. 3.

Overview of Digitalization in Garment Manufacturing
Overview of Digitalization in Garment Manufacturing

Fig. 4.

Image of the D6250 Ladies’ Trouser Model
Image of the D6250 Ladies’ Trouser Model

Fig. 5.

Sewing Process Workflow Chart for the D6250 Trousers
Sewing Process Workflow Chart for the D6250 Trousers

Fig. 6.

Software Algorithm Optimization Interface
Software Algorithm Optimization Interface

Fig. 7.

Operation Priority and Dependency Input Screen for Ranked Positional Weight (RPW) Calculation
Operation Priority and Dependency Input Screen for Ranked Positional Weight (RPW) Calculation

Fig. 8.

Calculation of the Ranked Positional Weight (RPW) Method for Optimizing Operation Assignments
Calculation of the Ranked Positional Weight (RPW) Method for Optimizing Operation Assignments

Fig. 9.

Screen Displaying Optimization Result Values
Screen Displaying Optimization Result Values

Fig. 10.

Access Interface for Line Optimization Results and Yamazumi Chart in the Digital Line Balancing Program
Access Interface for Line Optimization Results and Yamazumi Chart in the Digital Line Balancing Program

Fig. 11.

Total Durations of Operations Assigned to Workstations
Total Durations of Operations Assigned to Workstations

Fig. 12.

Current Sewing Line Layout for the D6250 Trouser Model
Current Sewing Line Layout for the D6250 Trouser Model

Capacity Algorithm Application Based on the Cycle Takt Time for the D6250 Trousers Model

Task NumberOperationMachineSMV (min.)Performance %Actual SMV (min.)Takt Time (min.)Required OperatorAssigned OperatorLeap OperatorUnassigned Time (min.)
1Belt IroningIroning Board0.29663.000.4700.6260.75100.751405.43
2Elastic JoiningElastic Feeding0.20675.000.2730.6260.43600.436235.50
3Belt Elastic MarkingManual0.26480.000.3300.6260.52700.527284.66
4Elastic HoldingFlatlock0.56054.001.0370.6261.65710.657354.54
5Belt JoiningLockstitch0.29477.000.3820.6260.61000.610329.52
6Belt ClosingFlatlock0.49650.001.0020.6261.60110.601324.35
7Cuff Ribbing AttachmentLockstitch0.69875.000.9290.6261.48410.484261.37
8Front Panel AttachmentLockstitch0.48070.000.6900.6261.10210.10255.21
9Front Seam Joining (x2)Lockstitch0.59978.000.7680.6261.22710.227122.49
10Back Panel JoiningLockstitch0.55567.000.8240.6261.31610.316170.80
11Inner Seam JoiningLockstitch0.867101.000.8620.6261.37710.377203.58
12Belt AttachmentOverlock0.61856.001.1140.6261.78010.780420.96
13Belt CuffCoverstitch0.59176.000.7820.6261.24910.249134.57
14Hem Bar Tack (x2)Bar Tack0.34530.001.1420.6261.82410.824445.11
15Label AttachmentFlatlock0.31563.000.5000.6260.79900.799431.31
16Label Removal (x9)Manual0.30975.000.4150.6260.66300.663357.99
17First ControlManual0.50578.000.6500.6261.03810.03820.70
18IroningIroning Board0.58776.000.7760.6261.24010.240129.39
19Final ControlManual0.60642.001.4280.6262.28120.281151.82

Task Times for Assigned Operators and Workstations

TaskStation NumberOperationMachineOperatorStation Time (min)
115Belt Ironing Ironing BoardIroning BoardM.C.405.43
216Elastic JoiningElastic FeedingS.A.235.5
317Belt Elastic MarkingManualN.K284.66
41Elastic HoldingFlatlockM.E540
418Elastic HoldingFlatlockB.I354.54
519Belt JoiningLochstitchG.K329.52
62Belt ClosingFlatlockS.Y540
620Belt ClosingFlatlockH.S324.35
73Cuff Ribbing AttachmentLockstitchZ.K540
716Cuff Ribbing AttachmentLockstitchS.A.261.37
84Front Panel Attach+ Label RemovalLockstitchAY.P.540
818Front Panel Attach+ Label RemovalLockstitchB.I55.21
95Front Seam Joiningx2LockstitchSE.A.540
918Front Seam Joiningx2LockstitchB.I122.49
106Back Panel JoiningLockstitchM.G540
1019Back Panel JoiningLockstitchG.K170.8
117Inner Seam JoiningLockstitchH.T540
1120Inner Seam JoiningLockstitchH.S203.58
128Belt Attachment + Thread CleaningOverlockS.H540
1221Belt Attachment + Thread CleaningOverlockMH.E.420.96
139Belt Cuff CoverstitchCoverstitchY.T540
1322Belt Cuff CoverstitchCoverstitchAY.E.134.57
1410Hem Bartack x2 + Thread CleaningBartackER.T540
1423Hem Bartack x2 + Thread CleaningBartackAY.K445.11
1524Decorative Label AttachmentFlatlockEL.O.431.31
1625Label Removal X9 + Turning and StackingManualSE.K.357.99
1711First ControlManualSV.M.540
1725First ControlManualSE.K.20.7
1812IroningIroning BoardUG.D.540
1825IroningIroning BoardSE.K.129.39
1913Fınal ControlManualHU.Y.540
1914Fınal ControlManualKA.A.540
1926Fınal ControlManualME.M151.82

j_ftee-2025-0002_tab_006

DetailsValues
Start of Shift08:00
Time at Measurement12:00
Downtime30 minutes
Production Quantity250 pieces
Standard Minute Value (SMV)0.5 min/pcs

Sewing Work Elements, Machine Types, and Standard Minute Values for the D6250 Trousers

Task NumberOperationMachineSMV (min)
1Belt IroningIroning Board0.296
2Elastic JoiningElastic Feeding0.206
3Belt Elastic MarkingManual0.264
4Elastic HoldingFlatlock0.560
5Belt JoiningLockstitch0.294
6Belt ClosingFlatlock0.496
7Cuff Ribbing AttachmentLockstitch0.698
8Front Panel AttachmentLockstitch0.480
9Front Seam Joining (x2)Lockstitch0.599
10Back Panel JoiningLockstitch0.555
11Inner Seam JoiningLockstitch0.867
12Belt Attachment + Thread CleaningOverlock0.618
13Belt CuffCoverstitch0.591
14Hem Bartack (x2) + Thread CleaningBartack0.345
15Label AttachmentFlatlock0.315
16Label Removal (x9) + Turning & StackingManual0.309
17First ControlManual0.505
18IroningIroning Board0.587
19Quality ControlManual0.606

Comparative Analysis of Key Production Metrics Before and After Optimization

Operational MetricBefore OptimizationAfter OptimizationDifferencePercentage Change
Daily Production Quantity718 pieces862 pieces+144 pieces+20.06%
Daily Working Time540 minutes540 minutes
Total Actual Standard Time14.37 minutes14.37 minutes
Line Efficiency79.68%88.31%+8.63%+10.83%
Number of Current Operators24 employees26 employees+2 people+8.33%
Labour Productivity30 pieces33 pieces+3 pieces+10%

j_ftee-2025-0002_tab_007

CalculationsFormulaDetails
Production Time250pcs × 0.5min/pcs125 min
Time Difference12:00 − 08:00 = 4hours240 min
Actual Working Time240min − 30min210 min
Performance Calculation((125 min)/(210 min)) ×10059.5%

Capacity Calculations Based on Task Durations of Work Elements for the D6250 Trousers Model

Task NumberOperationMachineSMV (min.)Hourly AmountCapacity (Employee/Machine)Working Hours
1Belt IroningIroning Board0.296202.700.474.23
2Elastic JoiningElastic Feeding0.206291.260.332.97
3Belt Elastic MarkingManual0.264227.270.423.78
4Elastic HoldingFlatlock0.560107.140.898.01
5Belt JoiningLockstitch0.294204.080.474.23
6Belt ClosingFlatlock0.496120.970.797.11
7Cuff Ribbing AttachmentLockstitch0.69885.961.119.99
8Front Panel AttachmentLockstitch0.480125.000.776.93
9Front Seam Joining (x2)Lockstitch0.599100.170.968.64
10Back Panel JoiningLockstitch0.555108.110.898.01
11Inner Seam JoiningLockstitch0.86769.201.3812.42
12Belt Attachment + Thread CleaningOverlock0.61897.090.998.91
13Belt CuffCoverstitch0.591101.520.948.46
14Hem Bartack (x2) + Thread CleaningBartack0.345173.910.554.95
15Label AttachmentFlatlock0.315190.480.504.50
16Label Removal (x9) + Turning & StackingManual0.309194.170.494.41
17First ControlManual0.505118.810.817.29
18IroningIroning Board0.587102.210.948.46
19Quality ControlManual0.60699.010.978.73
DOI: https://doi.org/10.2478/ftee-2025-0002 | Journal eISSN: 2300-7354 | Journal ISSN: 1230-3666
Language: English
Page range: 10 - 26
Published on: May 28, 2025
Published by: Łukasiewicz Research Network, Institute of Biopolymers and Chemical Fibres
In partnership with: Paradigm Publishing Services
Publication frequency: Volume open

© 2025 Bülent Koç, Selin Hanife Eryürük, published by Łukasiewicz Research Network, Institute of Biopolymers and Chemical Fibres
This work is licensed under the Creative Commons Attribution-NonCommercial-NoDerivatives 3.0 License.