Have a personal or library account? Click to login
Modelling and Simulation of SCADA and PLC System for Power System Protection Laboratory Cover

Modelling and Simulation of SCADA and PLC System for Power System Protection Laboratory

Open Access
|Sep 2021

References

  1. [1] K. I. Wong and T. U. Siaw, “PLC and SCADA Laboratory Experiments for a Final Year Instrumentation Course,” Int. J. Inf. Educ. Technol., vol. 5, no. 11, pp. 865–868, 2015. https://doi.org/10.7763/IJIET.2015.V5.62810.7763/IJIET.2015.V5.628
  2. [2] E. R. Alphonsus and M. O. Abdullah, “A review on the applications of programmable logic controllers (PLCs),” Renew. Sustain. Energy Rev., vol. 60, pp. 1185–1205, 2016. https://doi.org/10.1016/j.rser.2016.01.02510.1016/j.rser.2016.01.025
  3. [3] X. Yu and C. Singh, “A practical approach for integrated power system vulnerability analysis with protection failures,” IEEE Trans. Power Syst., vol. 19, no. 4, pp. 1811–1820, 2004. https://doi.org/10.1109/TPWRS.2004.83565610.1109/TPWRS.2004.835656
  4. [4] C. P. Janssen, S. F. Donker, D. P. Brumby, and A. L. Kun, “History and future of human-automation interaction,” Int. J. Hum. Comput. Stud., vol. 131, pp. 99–107, 2019. https://doi.org/10.1016/j.ijhcs.2019.05.00610.1016/j.ijhcs.2019.05.006
  5. [5] IEEE Standard for SCADA and Automation Systems, IEEE Std C37.1-2007, vol. 23, no. 6, 2007.
  6. [6] C. Lin, X. Min, and J. Junru, “Exploration on Educational Reform of Electrical Engineering and Automation Professional,” 2019 Asia-Pacific Conference on Advance in Education, Learning and Teaching (ACAELT 2019), pp. 1321–1325, 2019.
  7. [7] B. Ram and D. N. Vishwakarma, Power System Protection and Switchgear. McGraw-Hill Professional Publishing, 2011.
  8. [8] M. Eremia and M. Shahidehpour, Handbook of Electrical Power System Dynamics: Modeling, Stability, and Control. The Institute of Electrical and Electronics Engineers, Inc., 2013. https://doi.org/10.1002/978111851607210.1002/9781118516072
  9. [9] M. S. Thomas, P. Kumar, and V. K. Chandna, “Design, development, and commissioning of a supervisory control and data acquisition (SCADA) laboratory for research and training,” IEEE Trans. Power Syst., vol. 19, no. 3, pp. 1582–1588, 2004. https://doi.org/10.1109/TPWRS.2004.82677010.1109/TPWRS.2004.826770
  10. [10] J. F. M. valter Pinto, Silviano Rafeal, “PLC controlled industrial processes on-line simulator,” IEEE Int. Symp. Ind. Electrnics, 4–7 June, 2007. https://doi.org/10.1109/ISIE.2007.437508410.1109/ISIE.2007.4375084
  11. [11] D. Li, Y. Serizawa, and M. Kiuchi, “Concept design for a Web-based Supervisory Control and Data-Acquisition (SCADA) system,” Proc. IEEE Power Eng. Soc. Transm. Distrib. Conf., vol. 1, ASIA PACIFIC, pp. 32–36, 2002.
  12. [12] R. Bayindir and Y. Cetinceviz, “A water pumping control system with a programmable logic controller (PLC) and industrial wireless modules for industrial plants-An experimental setup,” ISA Trans., vol. 50, no. 2, pp. 321–328, 2011. https://doi.org/10.1016/j.isatra.2010.10.00610.1016/j.isatra.2010.10.00621126739
  13. [13] J. L. Vazquez-Gonzalez, J. Barrios-Aviles, A. Rosado-Muñoz, and R. Alejos-Palomares, “An industrial automation course: Common infrastructure for physical, virtual and remote laboratories for PLC programming,” Int. J. Online Biomed. Eng., vol. 14, no. 8, pp. 4–19, 2018. https://doi.org/10.3991/ijoe.v14i08.875810.3991/ijoe.v14i08.8758
  14. [14] D. Cousineau, D. Mentré, and H. Inoue, “Automated deductive verification for ladder programming,” Proceedings F-IDE 2019, EPTCS, vol. 310, pp. 7–12, 2019. https://doi.org/10.4204/EPTCS.310.210.4204/EPTCS.310.2
  15. [15] H. A. Abbas, “Future SCADA challenges and the promising solution: The agent-based SCADA,” Int. J. Crit. Infrastructures, vol. 10, no. 3/4, pp. 307–333, 2014. https://doi.org/10.1504/IJCIS.2014.06635410.1504/IJCIS.2014.066354
  16. [16] R. K. Chauhan, M. L. Dewal, and K. Saini, “Utility of SCADA in power generation and distribution system,” Proc. 2010 3rd IEEE Int. Conf. Comput. Sci. Inf. Technol. ICCSIT 2010, vol. 6, pp. 648–652, 2010.
  17. [17] T. Adams, “SCADA System Fundamentals,” Course No: E01-007, pp. 3–5, 2014.
  18. [18] R. Slusariuc, L. Samoila, G. Popescu and A. D. Handra, “SCADA Systems Analysis For Industrial Procesess,” Annals of the University of Petrosani, Electrical Engineering, vol. 21, pp. 17–22, 2019.
  19. [19] H. Salih, H. Abdelwahab, and A. Abdallah, “Automation design for a syrup production line using Siemens PLC S7-1200 and TIA Portal software,” Proc. 2017 Int. Conf. Commun. Control. Comput. Electron. Eng. ICCCCEE 2017, pp. 5–9, 2017. https://doi.org/10.1109/ICCCCEE.2017.786670210.1109/ICCCCEE.2017.7866702
  20. [20] S. L. Jämsä-Jounela, “Future trends in process automation,” IFAC Proc. Vol., vol. 40, no. 1, pp. 1–10, 2007. https://doi.org/10.3182/20070213-3-CU-2913.0000310.3182/20070213-3-CU-2913.00003
  21. [21] S. SIMATIC, “S7-1200 Easy Book,” pp. 1–454, 2015.
  22. [22] L. Prenzel and J. Provost, “PLC Implementation of Symbolic, Modular Supervisory Controllers,” IFAC-PapersOnLine, vol. 51, no. 7, pp. 304–309, 2018. https://doi.org/10.1016/j.ifacol.2018.06.31710.1016/j.ifacol.2018.06.317
Language: English
Page range: 19 - 25
Published on: Sep 13, 2021
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2021 Ayesha Faryal, Farhana Umer, Muhammad Amjad, Zeeshan Rashid, Aoun Muhammad, published by Riga Technical University
This work is licensed under the Creative Commons Attribution 4.0 License.