References
- Beaverstock, M., Greenwood, A., Nordgren, W., 2017. Applied simulation: modeling and analysis using FlexSim, 5th ed.: Published by FlexSim Software Products, Inc., Canyon Park Technology Center, Building A Suite 2300, Orem, UT 84097 USA.
- Grzelczak, A., 2018. Norma czasu a zarządzanie produkcją w aspekcie pracy wielostanowiskowej, Innowacje w Zarządzaniu i Inżynierii Produkcji, Knosala R. (red.), Oficyna Wydawnicza Polskiego Towarzystwa Zarządzania Produkcją, 432-440.
- Ingaldi, M., Ulewicz, R. 2020. Problems with the implementation of industry 4.0 in enterprises from the SME sector, Sustainability (Switzerland), 12(1), 217.
- Kapustka, K., Klimecka-Tatar, D., Ziegmann, G., 2019. The management and potential risk reduction in the processing of rare earths elements, System Safety: Human - Technical Facility – Environment, 1(1), DOI: 10.2478/czoto-2019-0010
- Krynke, M., 2020. Risk management in the process of personnel allocation to jobs, System Safety: Human - Technical Facility – Environment, (red.) Ulewicz R., Nikolic Ruzica R., De Gruyter, Warszawa 2020, pp. 82-90.
- Krynke, M., 2021. Management optimizing the costs and duration time of the process in the production system, Production Engineering Archives, 27(3), 163-170. DOI: 10.30657/pea.2021.27.21.
- Krynke, M., Mielczarek, K., Kiriliuk, O. 2021. Cost optimization and risk minimization during teamwork organization, Management Systems in Production Engineering, 29(2), 145-150.
- Laguna, M., 2011. OptQuest: Optimization of Complex Systems, Opttek Systems.
- Pawlak, S. 2025. Computer simulations in planning production processes as a tool of decision making, Production Engineering Archives, 31(2), 183-189. DOI: 10.30657/pea.2025.31.18
- Poloczek, R., Oleksiak, B. 2024. Evaluation of production line expansion efficiency using computer simulation, Production Engineering Archives, 30(4), 520-527. DOI: 10.30657/pea.2024.30.48
- Rosak-Szyrocka, J., Knop, K., 2024. Navigating the Fourth Industrial Revolution: insights from a comprehensive bibliometric study on Industry 4.0, Production Engineering Archives, 30(4), 501-519, DOI: 10.30657/pea.2024.30.47.
- Siwiec, D., Pacana, A., Ulewicz, R., 2022. Concept of a model to predict the qualitative-cost level considering customers’ expectations, Polish Journal of Management Studies, 26(2), 330–340. DOI: 10.17512/pjms.2022.26.2.20.
- Ulewicz, R., Ulewicz, M., 2020. Problems in the implementation of the lean concept in the construction industries, Lecture Notes in Civil Engineering, 47, 495-500.
- Wróblewski, D., 2015. Zarządzanie ryzykiem – przegląd wybranych metodyk, Wydawnictwo CNBOP-PIB, DOI: 10.17381/2015.1