References
- Anand, S.R., Nandurkar, K.N., 2012. Optimizing & analysing overall equipment effectiveness (OEE) through design of experiments (DOE), Procedia Engineering, 38, 2973-2980.10.1016/j.proeng.2012.06.347
- Bard, J.F., Nananukul, N., 2010. A branch-and-price algorithm for an integrated production and inventory routing problem, Computers & Operations Research, 37(12), 2202-2217.10.1016/j.cor.2010.03.010
- Borkowski, S., Selejdak, J., Salamon. S., 2006. Efektywność eksploatacji maszyn, Wydawnictwo Wydziału Zarządzania Politechniki Częstochowskiej, Częstochowa.
- Dehghanbaghi, N, Sajadieh, M.S., 2017. Joint optimization of production, transportation and pricing policies of complementary products in a supply chain. Computers & Industrial Engineering, 107, 150-157.10.1016/j.cie.2017.03.016
- Drljača, M., 2019. Reversible supply chain in function of competitiveness, Production Engineering Archives, 22, 30-35.10.30657/pea.2019.22.06
- Ficken, F.A. 2015. The Simplex Method of Linear Programming. Dover publications, INC. Mineola, New York.
- Ingaldi, M., Ulewicz, R., 2020. Problems with the implementation of industry 4.0 in enterprises from the SME sector, Sustainability, 12(217), DOI: 10.3390/su1201021710.3390/su12010217
- Jagusiak-Kocik, M., Knop, K., Sikora, Ł., 2016. Ocena poprawy wskaźnika OEE i jego składowych w procesie mieszania emalii poliwinylowej, Zeszyty Naukowe. Quality. Production. Improvement, 1(4), 66-79.10.30657/qpi.2016.04.06
- Klimecka-Tatar, D., Shinde V., 2019. Improvement of manual assembly line based on value stream mapping (VSM) and efectiveness coefficient, Quality Production Improvement, Sciendo, 1(1), 514-521, DOI: 10.2478/cqpi-2019-007210.2478/cqpi-2019-0072
- Knop, K., 2018. The impact of performance improvement achieved by the closing machine up to the level of World-Class OEE on the results of the production process, Materials Research Proceedings, 5, 117-122.
- Krynke, M., 2020. Risk management in the process of personnel allocation to jobs, System safety: Human - Technical Facility – Environment, Sciendo, 2(1), 82-89, DOI: 10.2478/czoto-2020-001110.2478/czoto-2020-0011
- Krynke, M., Knop, K., Mielczarek, K., 2014. Using overall equipment effectiveness indicator to measure the level of planned production time usage of sewing machine, Production Engineering Archives, 5, 6-9.10.30657/pea.2014.05.02
- Krynke, M., Mielczarek, K., 2018. Applications of linear programming to optimize the cost-benefit criterion in production processes, MATEC Web of Conferences,183, 6.10.1051/matecconf/201818304004
- Krynke, M., Mielczarek, K., Vaško, A. 2019. Analysis of the problem of staff allocation to work stations, Quality Production Improvement, Sciendo, 1(1), pp. 545-550.
- Lukač, Z., Hunjet, D., Neralić, L., 2008. Solving the production-transportation problem in the petroleum industry, Revista Investigación Operacional, 29(1), 63-70.
- Maros, I. 2003. Computational Techniques of the Simplex Method. Springer, Boston.10.1007/978-1-4615-0257-9
- Mielczarek, K., Krynke, M., 2018. Plastic production machinery – the evaluation of effectiveness, Production Engineering Archives, 18, 42-45.10.30657/pea.2018.18.07
- Nagar, S., 2018. Introduction to Octave: For Engineers and Scientists, Apress, NewYork.10.1007/978-1-4842-3204-0
- Piechna, A., 2012. Zadanie programowania liniowego w środowisku GNU Octave, Projektowanie i konstrukcje inżynierskie, 55, 58-62.
- Ulewicz, R., Lazar, Livia V., 2019. The effect of lean tools on the safety level in manufacturing organisations, System Safety: Human - Technical Facility – Environment, Sciendo, 1(1), 537-544, DOI: 10.2478/czoto-2019-006610.2478/czoto-2019-0066
- Zimon, D., 2015. Ogólne wytyczne dotyczące zarządzania jakością i technologii w łańcuchu dostaw na przykład przemysłu metalurgicznego. Polish Journal of Management Studies, 12(2), 212-219.