References
- [1] UNITED NATIONS COMMISSION ON INTERNATIONAL TRADE LAW: UNCITRAL Legislative Guide on Public-Private Partnerships. UN Publication, E.20.V.2, 2020, 7 p.
- [2] KANG, C. - FENG, C. - KHAN, H.: Risk Assessment For Build-Operate-Transfer Projects: A Dynamic Multi-Objective Programming Approach. Computers & Operations Research 32, 2003, pp. 1633-1654, DOI: 10.1016/j.cor.2003.11.026.
- [3] ACAR, M.: The Build-Operate-Transfer Model for Aerodrome Terminal Buildings. Publications of Directorate General of Civil Aviation, Publication No.: HAD/A-02, 2009, pp. 48-56.
- [4] ODEYINKA, H. – OLADAPO, A. - AKINDELE, O.: Assessing Risk Impacts on Construction Cost. The construction and building research conference of the Royal Institution of Chartered Surveyors, University College London, 2006.
- [5] Al-AZEMI, K. - BHAMRA, R. - SALMAN, A.: Risk Management Framework for Build, Operate and Transfer (BOT) Projects in Kuwait. Journal of Civil Engineering and Management, Vol. 20(3), 2014, pp. 415-433.10.3846/13923730.2013.802706
- [6] EBRAHIMNEJAD, S. - MOUSAVI, S. - SEYRAFIANPOUR, H.: Risk Identification and Assessment for Build-Operate-Transfer Projects: A Fuzzy Multi Attribute Decision Making Model. Expert Systems with Applications International Journal, Vol. 37, 2010, pp. 575-586.10.1016/j.eswa.2009.05.037
- [7] DEY, P. - OGUNLANA, S.: Selection and Application of Risk Management Tools and Techniques for Build-Operate-Transfer Projects. Industrial Management & Data Systems, Vol. 104, No. 4, 2004, pp. 334-346, DOI 10.1108/02635570410530748.
- [8] TABER, K.: The Use of Cronbach’s Alpha when Developing and Reporting Research Instruments in Science Education. Res Sci Educ, Springer, Vol. 48, 2018, pp. 1273-1296, DOI 10.1007/s11165-016-9602-2.
- [9] LAVRAKAS, P.: Encyclopaedia of Survey Research Methods. eBook, Vol. 1 & 2, 2008, 169 p.10.4135/9781412963947
- [10] YOCKEY, R.: SPSS Demystified a Simple Guide and Reference: Third Edition. New York, NY: Routledge, 2017, pp. 100-101.10.4324/9781315268545
- [11] GAMBO, M. - GOMEZ, C.: Project Characteristics for Design and Build Procurement in Malaysian Construction Industry. Journal of Engineering and Technology, Vol. 6, No. 1, 2015.
- [12] SCHAUFELBERGER, J.: Risk Management on Build Operate Transfer Projects. Construction Research Congress, paper 7547, 2005.10.1061/40754(183)91
- [13] MUNGURE, M.: The Causes and Impacts of Loan Default to Microfinance Institutions: The Case of Pride Tanzania Ltd Pamba Branch- Mwanza (Mfis) Activities. A Research Dissertation Submitted in Fulfilment of the Requirements for Award of the Masters of Business Administration in Corporate Management (MBA-CM) of Mzumbe University, 2015, pp. 15-19.
- [14] LAL, S. - MATHEW, A.: Identification of Risk Factors Leading to Cost and Time Overrun in B-O-T Projects. Sustainability, Agri, Food and Environmental Research, Vol. 10, 2022.10.7770/safer-V10N1-art2466
- [15] KASSEM, M. - KHOIRY, M. - HAMZAH, N.: Using Relative Importance Index Method for Developing Risk Map in Oil and Gas Construction Projects. Jurnal Kejuruteraan, Vol. 32(3), 2020, pp. 441-453.10.17576/jkukm-2020-32(3)-09
- [16] MUKA, I. - WIBOWO, A.: Risk Management Process on the Property Development of NUSA DUA Resort Bali Indonesia. Civil and Environmental Engineering, Vol.17, No.1, 2021, pp.117-124, https://doi.org/10.2478/cee-2021-0013.
- [17] HUANG, M.: BOT in China: Opportunities and Challenges for Foreign Firms. A Thesis Submitted to the Department of Civil and Environmental Engineering in Partial Fulfilment of the Requirements for the Degree of Master of Science in Civil and Environmental Engineering at the Massachusetts Institute of Technology, 1999, pp. 55-67.
- [18] LLANTO, G.: Build-Operate-Transfer for Infrastructure Development: Lessons from the Philippine Experience, in Kumar, N. (ed.), International Infrastructure Development in East Asia -Towards Balanced Regional Development and Integration, ERIA Research Project Report 2007-2, Chiba: IDE-JETRO, 2008, pp. 319-359.
- [19] LIN, J.: The Conflicts and Risks in BOT Projects. A Thesis Submitted to the Department of Civil Engineering in Partial Fulfilment of the Requirements for the Degree of Master of Science in Civil Engineering at the Massachusetts Institute of Technology, 2003, pp. 67-77.
- [20] KREYDIEH, A.: Risk Management in BOT Project Financing. A Thesis Submitted to the Department of Civil and Environmental Engineering in Partial Fulfilment of the Requirements for the Degree of Master of Science in Civil and Environmental Engineering at the Massachusetts Institute of Technology, 1996, pp. 31-43.
- [21] KHAHRO, S. - ALI, T. - MEMON, N. - AKHUND, M.: Effect of Change Orders on Project Duration. IJCIET, Vol. 8, Iss. 6, 2017, pp. 484-490.
- [22] JANGALE, S. -SURYAWANSHI, A.: Risk Assessment in BOT Project Financing. IJERT, Vol. 3, Iss. 6, 2014.
- [23] HSIAO, H.: Risk Management in BOT Project. A Thesis Submitted to the Department of Civil and Environmental Engineering in Partial Fulfilment of the Requirements for the Degree of Master of Science in Civil and Environmental Engineering at the Massachusetts Institute of Technology, 2000, p. 63.
- [24] RASHEED, E.: Valuation the Impact of Risks on the Goals and the Safety of Construction Projects in Iraq. Journal of Engineering, Vol. 21, No. 4, 2015.10.31026/j.eng.2015.04.10
- [25] SHADHAR, A. - MAHMOOD, B.: Risks of Design Stage in Iraqi Construction Project. Journal of Engineering, Vol. 24, No. 3, 2018.10.31026/j.eng.2018.03.09