References
- [1] XUE, X. – WANG, Y. – SHEN, Q. – YU, X.: Coordination mechanisms for construction supply chain management in the internet environment. International Journal of Project Management, Vol. 25, Iss. 2, 2007, pp. 150-157.10.1016/j.ijproman.2006.09.006
- [2] SENARATNE, S. – RUWANPURA, M.: Communication in construction: a management perspective through case studies in Sri Lanka. Journal of Architectural Engineering and Design Management, Vol. 12, Iss. 1, 2016, pp. 3-18.10.1080/17452007.2015.1056721
- [3] EDDIE, W. L. – CHENG, H. L. – PETER, E. D. – LOVE, Z. I.: Network communication in the construction industry. Corporate Communications: An International Journal, Vol. 6, Iss. 2, 2001, pp. 61-70.10.1108/13563280110390314
- [4] CERIC, A.: Minimizing communication risk in construction: a delphi study of the key role of project managers. Journal of Civil Engineering and Management, Vol. 20, Iss. 6, 2014, pp. 829-838.10.3846/13923730.2013.802739
- [5] DAINTY, A. – MOORE, D. – MURRAY, M.: Communication in construction – Theory and practice 1st edition, London: Taylor & Francis, 2006.10.4324/9780203358641
- [6] BAKHTIYAR, A. – SOEHARDJONO, A. – HASYIM, M. H.: Analisis faktor-faktor yang mempengaruhi keterlambatan proyek konstruksi pembangunan gedung di kota lamongan. Jurnal Rekaya Sipil, Vol. 6, Iss. 1, 2012, pp. 55-66.10.33795/prokons.v6i2.27
- [7] SOLIMAN, E.: Communication Problems Causing Governmental Projects Delay – Kuwait Case Study, International Journal of Construction Project Management, Vol. 9, Iss. 1, 2017, pp. 1-18.
- [8] PROJECT MANAGEMENT INSTITUTE: A Guide to the Project Management Body of Knowledge Sixth Edition, Project Management Institute, 2017.
- [9] FERTILIA, N. C. – LATIEF, Y. – SUBIYANTO, E.: Pengembangan Proses Perencanaan Pada Proyek EPC Berbasis PMBOK Untuk Meningkatkan Kualitas Perencanaan Proyek Yang Berkaitan Dengan Kinerja Waktu di PT. KE. Jurnal Rekayasa Sipil, Vol. 7, Iss. 1, 2018, pp. 13-31.10.22441/jrs.2018.v07.i1.02
- [10] BAIDEN, B. K. – PRICE, A. D. F.: The effect of integration on project delivery team effectiveness. International Journal of Project Management, Vol. 29, 2010, pp. 129-136.10.1016/j.ijproman.2010.01.016
- [11] EMMITT, S. – GORSE, C. A.: Communication in Construction teams. London: Taylor and Francis, 2007.10.4324/9780203018798
- [12] TAI, S. – WANG, Y. – ANUMBA, C. J.: A survey on Communications in large scale construction projects in China. Journal of Engineering, Construction and Architectural Management, Vol. 16, Iss. 2, 2009, pp. 136-149.10.1108/09699980910938019
- [13] PROJECT MANAGEMENT INSTITUTE: Communication: The Message Is Clear, 2013.
- [14] TAM, C.: Use of the Internet to enhance construction communication: Total Information Transfer System. International Journal of Project Management, 1999, pp. 107-111.10.1016/S0263-7863(97)00077-X
- [15] WIJAYA, I. S.: Perencanaan dan Strategi Komunikasi dalam Kegiatan Pembangunan. Jurnal Lentera, Vol. 18, Iss. 1, 2015, pp. 53-61.
- [16] CHAN, E. H. – SUEN, H. C.: Dispute resolution management for international constructional projects in China. Journal of Management Decision, Vol. 43, Iss. 4, 2005, pp. 589-602.10.1108/00251740510593576
- [17] BAL, M. – BRYDE, D. – FEORAN, D. – OCHIENG, E.: Stakeholder Engagement: Achieving Sustainability in the Construction Sector. Journal of Sustainability, Vol. 5, Iss. 2, 2013, pp. 695-710.10.3390/su5020695
- [18] AL QADY, M. – KANDIL, A..: Document Management in Construction: Practices and Opinions. Journal of Construction Engineering and Management, Vol. 139, Iss. 10, 2013.10.1061/(ASCE)CO.1943-7862.0000741
- [19] PERUMAL, V. R. – BAKAR, A. H. A.: The needs for standardization of document towards an efficient communication in the construction industry. Acta Technica Corviniensis – Bulletin of Engineering, Vol. 4, Iss. 1, 2011, pp. 23-30.
- [20] ZIDANE, Y.J.T. – HUSSEIN, B.A. – GUDMUNDSSON, J.O. – EKAMBARAM, A.: Categorization of organizational factors and their impact on project. Procedia - Social and Behavioral Sciences, Vol. 226, 2016, pp. 162-169.10.1016/j.sbspro.2016.06.175
- [21] BUERTEY, J. I. T. – INGA, E. A. – KUMI, A. T.: Estimating cost contingency for construction projects: the challenge of systemic and project spesific risk. Journal of Construction Project Management and Innovation, Vol. 2, Iss. 1, 2012, pp. 166-189.
- [22] KAYANY, J. M. – WOTRING, E. C. – FORREST, E. J.: Relation Control and Interactive Choice in Technology-Mediated Communication Situations. Human Communication Research, Vol. 22, Iss. 3, 1996, pp. 399-421.10.1111/j.1468-2958.1996.tb00373.x
- [23] BAGULEY, P.: Effective Communication for modern Business. London: McGraw-Hill, 1994.
- [24] GORSE, C. A. – EMMIT, S. – LOWIS, M.: Problem solving and appropriate communication medium. 15th Annual Conference, Vol. 2, 1999, pp. 511-518.
- [25] PELED, A.: Politicking for succes: the missing skill. Leadership & Organizational Development Journal, Vol. 21, Iss. 1, 2000, pp. 20-29.10.1108/01437730010310703
- [26] SUNINDIJO, R. Y. – ZOU, P. X.: CHPT construct: essential skills for construction project managers. International Journal of Project Organisation and Management, Vol. 3, Iss.2, 2011, pp. 139-163.10.1504/IJPOM.2011.039818
- [27] HELDMAN, K.: PMP: Project Management Professional Exam Study Guide. John Wiley & Sons, 2018.10.1002/9781119549192
- [28] PELLICER, E. – YEPES, V. – TEIXEIRA, J. C. – MOURA, H. P. – CATALA, J.: Construction Management. 2014.
- [29] MALLADI, S.: Fostering project communication – Is about planning, process and people. PM World Today, Vol. 9, Iss. 4, 2007, pp. 1-5.
- [30] PATANAKUL, P. – IEWWONGCHAROEN, B. – MILOSEVIC, D.: An empirical study on the use of project management tools and techniques across project life-cycle and their impact on project success. Journal of General Management, Vol. 36, Iss. 1, 2010, pp. 41-65.10.1177/030630701003500304
- [31] MAHESWARI, J. U. – VARGHESE, K.: Project Scheduling using Dependency Structure Matrix. International Journal of Project Management, Vol. 23, 2005, pp. 223-230.10.1016/j.ijproman.2004.10.001
- [32] YUN, S. – CHOI, J. – OLIVEIRA, D. P. – MULVA, S. P. – KANG, Y.: Measuring project management inputs throughout capital project delivery. International Journal of Project Management, Vol. 34, Iss. 7, 2016, pp. 1167-1182.10.1016/j.ijproman.2016.06.004
- [33] WARD, S. C. – CHAPMAN, C. B. – CURTIS, B.: On the Allocation of Risk in Construction Projects. International Journal of Project Management, Vol. 9, Iss. 3, 1991, pp.140-147.10.1016/0263-7863(91)90038-W
- [34] KAGIOGLU, M. – COPER, R. – AOUAD, G.: Performance Management in Construction: A Conceptual Framework. Construction Management and Economics, Vol 19, Iss. 1, 2001, pp. 85-95.10.1080/01446190010003425
- [35] TOOR, S. R. – OGUNLANA, S. O.: Beyond the Iron Triangle: Stakeholder Perception of Key Performance Indicators (KPIs) for Large-Scale Public Sector Development Projects. International Journal of Project Management, Vol. 28, Iss. 2, 2010, pp. 228-236.10.1016/j.ijproman.2009.05.005
- [36] LEMESHOW, S. – HOSMER, D. W. – KLAR, J. – LWANGA, S. K.: Adequacy of Sample Size in Health Studies. West Sussex: John Wiley & Sons Ltd., 1990.
- [37] BESNER, C. – HOBBS, B.: Project management practice, generic or contextual: a reality check. Project Management Journal, Vol. 39, Iss. 1, 2008, pp. 16-33.10.1002/pmj.20033
- [38] ASSEFA, M.: Factors Affecting the Success of Construction Projects in Petroleum Distributing Companies in Ethiopia: with a specific case of National Oil Ethiopia and Mulege Petroleum. 2019.
- [39] INDAH, S. N.: Quality management risk analysis and preparation of quality control procedures for subcontractor work at Jakarta PIK gold coast apartment project. 2017.
