Enhancing Project Delivery in Gaindakot Municipality, Nepal, Through the Bromilow Time-Cost Model: A Strategic Mitigation Approach Cover

Enhancing Project Delivery in Gaindakot Municipality, Nepal, Through the Bromilow Time-Cost Model: A Strategic Mitigation Approach

Open Access
|May 2025

References

  1. Arain, F. M., Assaf, S., & Pheng, L. S. (2004). Causes of discrepancies between design and construction. Architectural Science Review, 47(3), 237–249. http://doi.org/10.1080/00038628.2000.9697530
  2. Berihu, L. G., Grum, B., Tariku, Z., & Abebe, B. A. (2023). Causes, effects, and mitigation measures of time and cost overruns in water supply projects: Case of Tigrai Region, Northern Ethiopia. Advances in Civil Engineering, 12(3), 123–133. https://doi.org/10.1155/2023/7113730
  3. Bromilow, F. J. (1969). Contract time performance expectations and the reality. Building Forum, 1(3), 70–80.
  4. Chan, A. P. (2001). Time–cost relationship of public sector projects in Malaysia. International Journal of Project Management, 19(4), 223–229. https://doi.org/10.1016/S0263-7863(99)00072-1
  5. Chaudhary, D. (2019). The decentralization, devolution and local governance practices in Nepal: The emerging challenges and concerns. Journal of Political Science, 19, 43–64. http://doi.org/10.3126/jps.v19i0.26698
  6. Guo, J. X., Hu, C. M., & Bao, R. (2019). Predicting the duration of a general contracting industrial project based on the residual modified model. KSCE Journal of Civil Engineering, 23(8), 3275–3284. https://doi.org/10.1007/s12205-019-1543-7
  7. Koirala, N. (2021). Variations order of building construction project: A case from Nepal. Journal of Advanced Research in Construction and Urban Architecture, 6(2), 25–33. http://doi.org/10.24321/2456.9925.202105
  8. Mak, M. Y., Ng, S. T., Chen, S. E., & Varnam, M. (2000). The relationship between economic indicators and Bromilow’s time-cost model: A pilot study. In A. Akintoye (Ed.), Proceedings of the 16th Annual ARCOM Conference (pp. 587–595).
  9. Pandeya, G. P. (2015). Does citizen participation in local government decision-making contribute to strengthening local planning and accountability systems? An empirical assessment of stakeholders’ perceptions in Nepal. International Public Management Review, 16(1), 67–98.
  10. Pokhrel, P., Misra, J., Nepal, D. B., & Adhikari, P. (2021). Estimation of construction duration for roads and bridges in Nepal. Nepal Journal of Civil Engineering, 1(1), 41–49. https://doi.org/10.3126/njce.v1i1.43372
  11. Rahman, I. A., Memon, A. H., Nagapan, S., Latif, Q. B. A. I., & Azis, A. A. A. (2012). Time and cost performance of construction projects in southern and central regions of Peninsular Malaysia. Colloquium on Humanities, Science and Engineering (CHUSER), 52–57.
  12. Rauzana, A. (2016). Analysis of causes of delay and time performance in construction projects. IOSR Journal of Mechanical and Civil Engineering, 13(5), 116–121. https://doi.org/10.9790/1684-130503116121
  13. Sambasivan, M., & Soon, Y. W. (2007). Causes and effects of delays in Malaysian construction industry. International Journal of Project Management, 25(5), 517–526. https://doi.org/10.1016/j.ijproman.2006.11.007
  14. Sigdel, S. (2023). Causes of delays in residential building construction at Gaindakot Municipality, Nepal. Zenodo. https://doi.org/10.5281/zenodo.15201198
  15. Sigdel, S., Awasthi, K. D., & Bohora, N. (2022). Perceptions of stakeholders about technical capacity and performance of local builders in residential building construction sites at Gaindakot Municipality, Nepal. Zenodo (CERN European Organization for Nuclear Research). https://doi.org/10.5281/zenodo.7313392
  16. Suwal, A., & Shrestha, S. K. (2016). Causes of delays of motorable bridge construction under postal highway projects, Department of Roads. Journal of Advanced College of Engineering and Management, 2, 85–92. https://doi.org/10.3126/jacem.v2i0.16101
  17. Taye, M. (2016). Assessment of time and cost overruns in construction projects: A case study at Defense Construction Enterprise. Doctoral dissertation, St. Mary’s University.
  18. Yadav, S. K., & Mishra, A. K. (2019). Status of time and cost overrun of health building construction projects in Nepal. Scholars Journal of Engineering and Technology, 7(9), 262–270.
DOI: https://doi.org/10.2478/bjreecm-2025-0009 | Journal eISSN: 2255-9671 | Journal ISSN: 2255-9604
Language: English
Page range: 107 - 117
Submitted on: Apr 20, 2025
Accepted on: May 2, 2025
Published on: May 17, 2025
Published by: Riga Technical University
In partnership with: Paradigm Publishing Services
Publication frequency: 1 issue per year

© 2025 Shankar Kandel, Sandesh Sigdel, published by Riga Technical University
This work is licensed under the Creative Commons Attribution 4.0 License.