Adhikari, R. K., & D’Ayala, D. (2020). 2015 Nepal earthquake: seismic performance and post-earthquake reconstruction of stone in mud mortar masonry buildings. Bulletin of Earthquake Engineering, 18(8), 3863–3896. <a href="https://doi.org/10.1007/s10518-020-00834-y" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1007/s10518-020-00834-y</a>
Aje, I. O., & Famakin, I. O. (2012). The impact of contractors’ technical capability on cost and time performance of building projects in Nigeria. Conference paper: RICS COBRA 2012.
Mishra, A. K., Karmacharya, G., & Aithal, P. S. (2021). Compliance status of building bylaws and codes in high-rise apartment buildings of Nepal. International Journal of Applied Engineering and Management Letters, 66–79. <a href="https://doi.org/10.47992/ijaeml.2581.7000.0093" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.47992/ijaeml.2581.7000.0093</a>
Oke, A., Aigbavboa, C., & Khangale, T. (2018). Effect of skills shortage on sustainable construction. AHFE 2017: Advances in Human Factors, Sustainable Urban Planning and Infrastructure, 303–309. <a href="https://doi.org/10.1007/978-3-319-60450-3_29" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1007/978-3-319-60450-3_29</a>
Zainal, R., Hamza, G., Manap, N., & Syahrom, N. S. (2019). Significant ways to improve the performance of medium and large local contractors in the Jigawa State, Nigeria. MATEC Web of Conferences, 266, 03018. <a href="https://doi.org/10.1051/matecconf/201926603018" target="_blank" rel="noopener noreferrer" class="text-signal-blue hover:underline">https://doi.org/10.1051/matecconf/201926603018</a>