Virtual Commissioning of an IEC 61850-Based Substation Automation System Through an Integrated Engineering Workflow Cover

Virtual Commissioning of an IEC 61850-Based Substation Automation System Through an Integrated Engineering Workflow

Open Access
|Oct 2026

Abstract

This paper proposes a structured IEC 61850-based engineering methodology for virtual commissioning of digital substations by integrating protection engineering in DIGSI 5, virtual validation using SIPROTEC DigitalTwin, and SCADA preparation in TIA Portal. Unlike conventional approaches, the proposed methodology unifies protection configuration, communication engineering, and supervisory interface in a single workflow. The methodology is evaluated using protection scenarios that assess the consistency of protection logic, relay operation, and supervisory visualization. The results demonstrate that the proposed workflow can effectively verify the coordinated development of protection and automation components before hardware deployment, reducing dependence on physical equipment during the early engineering stages.

DOI: https://doi.org/10.2478/bhee-2027-0001 | Journal eISSN: 2566-3151 | Journal ISSN: 2566-3143
Language: English
Submitted on: Nov 19, 2024
Accepted on: Mar 11, 2025
Published on: Oct 23, 2026
Published by: Bosnia and Herzegovina National Committee CIGRÉ
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2026 Vedad Mušović, Dejan Jokić, Josip Cenčić, published by Bosnia and Herzegovina National Committee CIGRÉ
This work is licensed under the Creative Commons Attribution 4.0 License.