References
- https://climate.ec.europa.eu/eu-action/climate-strategies-targets/2050-long-term-strategy_en
- Refer to Grids, the missing link - An EU Action Plan for Grids, EU Commission, Brussels, 28 November 2023. eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52023DC0757, accessed on 31.12.2023
- Refer to ENTSO-E High Level Forum on Future of Our Grids, Brussels, 7 SEPTEMBER 2023, Future of our Grids: European Policymakers, Grid Operators and Industry leaders met today to put forward concrete steps to deliver the electricity grids needed for the energy transition. (entsoe.eu), accessed on 31.12.2023
- Refer to Grids, the missing link - An EU Action Plan for Grids, EU Commission, Brussels, 28 November 2023. eur-lex.europa.eu/legal-content/EN/TXT/PDF/?uri=CELEX:52023DC0757, accessed on 31.12.2023
- System Needs Study Opportunities for a more efficient European power system in 2030 and 2040, ENTSO-e, May 2025, https://tyndp.entsoe.eu/explore/what-are-system-needs
- High voltage direct current (HVDC) grid systems and connected converter stations - Guideline and parameter lists for functional specifications - Part 1: Guideline, IEC TS 63291-1:2023, ISBN 9782832275719
- Curia.europa.eu; Opinion of Advocate General Tanchev, delivered on 14 November 2019(1), Case C-454/18, Baltic Cable AB v Energimarknadsinspektionen; https://curia.europa.eu/juris/document/document.jsf?text=&docid=220659&pageIndex-=0&doclang=EN&mode=req&dir=&occ=-first&part=1&cid=2246572