Integration of Solar Photovoltaic Power Plants Into the Power Transmission System of Bosnia and Herzegovina Load and Voltage Conditions Analysis Cover

Integration of Solar Photovoltaic Power Plants Into the Power Transmission System of Bosnia and Herzegovina Load and Voltage Conditions Analysis

By: Saša Đekić  
Open Access
|Nov 2023

References

  1. NOS BiH. (2019). Mrežni kodeks. [Online] Available: https://www.nosbih.ba/files/2021/12/20211220-bs-Mrezni-kodeks-NOSBiH-a.pdf
  2. Službeni glasnik BiH, Pravilnik o priključku. Sarajevo: Službeni glasnik BiH, 95/08, 2008.
  3. Službeni glasnik BiH, Pravilnik o izmjenama i dopunama Pravilnika o priključku. Sarajevo: Službeni glasnik BiH, 79/10, 2010.
  4. Službeni glasnik BiH, Pravilnik dopunama Pravilnika o priključku. Sarajevo: Službeni glasnik BiH, 60/12, 2012.
  5. Elektroprenos BiH, Informative professional magazine of the company, No. 8, 2018. [Online] Available: https://www.elprenos.ba/Bilten/bilten8.pdf
  6. Elektroprenos BiH. (2021). Dugoročni plan razvoja prenosne mreže 2021-2031. [Online] Available: https://www.nosbih.ba/files/2021/03/20210311-lat-Dugorocni-plan-razvoja-prenosne-mreze-2021-2030-Knjiga-1.pdf
  7. Studija elektroenergetskog sektora u BiH, MODUL 4, EIHP et al. 2008. [Online] Available: http://www.mvteo.gov.ba/data/docs/reports/ESSBIH-Modul-4.pdf
  8. Analiza integracije vjetroelektrana u elektroenergetski sistem i tržišna pravila, KPMG, EIHP, ECA, 2012.
DOI: https://doi.org/10.2478/bhee-2023-0008 | Journal eISSN: 2566-3151 | Journal ISSN: 2566-3143
Language: English
Page range: 18 - 23
Submitted on: Aug 4, 2023
Accepted on: Oct 24, 2023
Published on: Nov 17, 2023
Published by: Bosnia and Herzegovina National Committee CIGRÉ
In partnership with: Paradigm Publishing Services
Publication frequency: 2 issues per year

© 2023 Saša Đekić, published by Bosnia and Herzegovina National Committee CIGRÉ
This work is licensed under the Creative Commons Attribution 4.0 License.